Case Study #3 Existing Building Refinance/Rehab MAP 221 D4 SR

Slides:



Advertisements
Similar presentations
Total Workforce Development Needs Energy Sector. Mechanical Pathways Electrical Pathways Architectural Pathways.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Jim McElwain College Architect SETTING UP A LABORATORY.
BIM EXECUTION PLANNING PROCESS
Center for Innovative School Facilities Brian Butler PE, LEED AP Associate Principal / Sr. Mechanical Engineer Long Range Facility Planning David Chesley.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
Post Occupancy Evaluation Sustainability and Energy R+B – SHW Group Using POE’s to inform design and improve building performance.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Foundations of Real Estate Management TM BOMA International ® Module 2: The Well-Versed Real Estate Manager Tenant Improvements and Capital Projects.
Primary Residential Design Considerations
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Construction Drawings. Objectives Briefly recognize the history of construction drawings Recognize who creates construction drawings and the tools used.
Rachel Weaver Program Manager Maryland Energy Administration
Architecture & Construction PREPARING FOR COLLEGE, CAREER AND CITIZENSHIP
From Design to Construction: How to Maintain Control of Your Lighting Design Avraham M. Mor, LEED AP, IESNA, A. IALD Partner, Lightswitch Architectural.
Overview of ENERGY STAR for Multifamily High Rise Requirements
Catherine Elvert City of Palo Alto Utilities Communications Manager.
The Arlington Partnership for Affordable Housing Presentation at Virginia Housing Credit Conference Tuesday, Sept. 3, 2014 Nina Janopaul, President/CEO.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
Massachusetts New Homes with ENERGY STAR ® The sponsors of the Massachusetts New Homes with ENERGY STAR are Bay State Gas, Berkshire Gas, Cape Light Compact,
Tax Credit Pilot Case Studies Midwest Lender’s Conference – June 2013.
BALTIMORE CITY PUBLIC SCHOOLS GREEN SCHOOL WORKGROUP: MEETING 1 Green Ambassador INSERT NAME INSERT CONTACT INFO1 INSERT CONTACT INFO2 For additional information:
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
PROJECT HIGHLIGHTS Energy efficiency is a key feature of the design of Reagan Education Center. The heating, cooling, and electrical lighting systems exceed.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Hampton Inn & Suites Productivity Study. Agenda Purpose & Process Project Overview**** Work Sampling Factors affecting Productivity***** 5 Min. Rating.
School Construction Plan Review What you need to know.
PUBLIC HEARING PROCESS AND REVIEW FOR THE PROPOSED ADOPTION OF THE 2012 INTERNATIONAL CODES AND THE 2011 NATIONAL ELECTRICAL CODE.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
The New Standard for Sustainability. Carleton College Dormitories Northfield, MN.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Chapter 44 Building Codes and Commercial Design. 2 Links for Chapter 44 Building Codes Design Categories Using the Codes Related Web Sites.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Energy Conservation Project UNIT 7 STANDARDS: NCES 2.2.2,
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
SPECIAL EDUCATION Delivering the Services to Students Presented by: Vanessa Reed, Special Education Coordinator Rita Danis, School Leader 3rd National.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
Commitment to Sustainability There is growing evidence of the links between green building construction and operations, environmental education and student.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Permit Process & Application Guide
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Building Team Formation: Background Information St. Andrew Presbyterian Church March 27,
Office of Facilities & Property Management STEPHEN SALBER, DIRECTOR.
The UC Project Management Institute is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
UC/CSU/CCC Sustainability Conference Cal Poly San Luis Obispo, 2008 The Best Practice Awards Program is created by the UC/CSU/IOU Energy Efficiency Partnership.
UC/CSU/CCC Sustainability Conference Cal Poly San Luis Obispo, 2008 The Best Practice Awards Program is created by the UC/CSU/IOU Energy Efficiency Partnership.
Build a Professional Team Site Selection / Market Analysis Preliminary Feasibility Option to Purchase Land Feasibility Study Financing and Ownership Entity.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
COSCDA Program Managers Training Conference, Housing
SONOMA COUNTY JUNIOR COLLEGE DISTRICT Measure H update for the Governing Board April 11, 2017.
Working group update: Improving and Expediting the process for new electric and gas interconnections November 29, 2016.
BIM EXECUTION PLANNING PROCESS
MIDWEST LENDERS CONFERENCE
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Case Study #1 Existing building Refinance MAP 223(F)
BIM EXECUTION PLANNING PROCESS
Energy Huntsville Opportunity Report March 2017
Industrial Technology & Transportation Pathway
City of Ventura Green Building Standards
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
Greater Kaweah GSA Board Meeting
$30-40k Green Energy Retrofitter
Presentation transcript:

Case Study #3 Existing Building Refinance/Rehab MAP 221 D4 SR 3 Stories Garden style with 310 units Common Space (Clubhouse, Pool, Gym) Individual Meters (Currently) Was able to get 100% of utility bills from utility provider 75% of building being remodeled from major gut rehab Changing floor layout HVAC systems Electrical distribution systems (installing sub metering) Plumbing system updated to current code Seeking to obtain a LEED Home/LO/MID Rise Certification Required to deliver SEP with 75% occupancy + 15 months, then must be maintained annual Utility Linked data or a Professional Engineer or Architect stamp

Lender Responsibility Engage early for SEDI and Green Certification Provide Completed 80% CDs Provide Project Contact list Coordinate team conference calls as needed Determine early and often project GREEN CERTIFICATION Data Collection Plan

Common Pitfalls for Rehab New Construction Common Mistakes Not establishing a Green Certification before design Not designing to a Green Certification Standards Not having a 3rd party reviewer Providing partial or inaccurate information with CDs Lighting Schedules Appliance Selections Mechanical Schedules CDs not complete Beginning construction before incorporating Green Standards Changing Green Certification project Midstream