THREE UTILIZATION ISSUES LOCATION 2. MODE OF EXTRACTION 3. SULFUR REMOVAL
COAL PIPELINES COAL (200 MESH)/ WATER SLURRY LARGE INVESTMENT COST CURRENT OPERATION – BLACK MESA, ARIZONA (1750 MW) 270 MILES PLANNED OPERATION – HINDERED BY EMINENT DOMAIN, WATER SUPPLY PROBLEMS NOT FEASIBLE FOR LIGNITE
SOLUTIONS TO THE SULFUR PROBLEM IN POWER GENERATION LOW SULFUR COAL 2. MECHANICAL TREATMENT (BENEFICIATION) 3. COAL GASIFICATION/LIQUEFACTION 4. DOLOMITE INJECTION/FLUIDIZED BED 5. FLUE GAS SCRUBBERS 1, 2, 3 PRE-COMBUSTION