Bay Trail.

Slides:



Advertisements
Similar presentations
West County Transit Enhancement Plan Monday, May 16, 2011 Hercules City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Advertisements

West County Transit Enhancement Plan Tuesday, May 24, 2011 El Cerrito City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Titusville to Edgewater Bike Loop PD&E Study
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
NORTHEAST CORRIDOR INFRASTRUCTURE (NECI) BICYCLE FACILITIES STUDY Bicycle Advisory Committee (BAC) Update in collaboration with: + STV/Ralph Whitehead.
Slide 1. Slide 2 Introduction How did you get to school as a child?
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
CAA’s Cycling Advocacy How “Watch for Bikes” and other initiatives can make cycling in York safer.
1 ACCESS to QUALITY CULTURAL, RECREATIONAL, EDUCATIONAL and LEISURE OPPORTUNITIES Collaboratively encourages and supports opportunities to focus on the.
Texas Tech University Bikeway Plan August 12, 2005.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Navigating the Path to Complete Streets Strategies for Implementation January 30, 2014 RI League of Cities and Towns Annual Convention This Grow Smart.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Vision Investment Proposal. Meeting Vision Renewal Goals QUALITY OF LIFE CONNECTIVITY HEALTH.
San Juan Greenway WJI PRODUCTIONS Cycling and Walking Centennial Trails Project.
Bicycling in Montgomery County Where we are and where we’re going Montgomery Bicycle Advocates (MoBike) – 5/14/11.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Thursday, November 18, 2010 LOMBARD DOWNTOWN PLAN Village Board Meeting Lombard Downtown Revitalization VILLAGE BOARD MEETING Thursday, November 18, 2010.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Cycling Scotland Presentation
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
West County Transit Enhancement Plan Monday, May 23, 2011 Richmond City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Mason to Metro Bicycle Route Project. Proximity to DC DC was listed as the forth best biking city in the United States by Bicycling Magazine Had an 80%
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
2016 Active Transportation Plan Goals, Objectives & Criteria Bicycle and Pedestrian Facilities Advisory Committee March 2, 2016 meeting.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
Rock Creek East II Livability Study April 28, 2016.
Community Based Transportation Plan
Arizona Forward Update
Rock Creek East II Livability Study
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Pedestrian and Bicycle Advisory Commission and Fort Worth Bike Sharing
The Central Avenue Connector Trail
Transportation Initiative Sales Tax Prioritization
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Cycling infrastructure spending 2017
Complete Streets Policy + Bicycle / Pedestrian Plan
Ad Hoc Advisory Group presentation, August 3, 2016
Kerr Tar Project Update – June 2016
Texas Department of Transportation
Clifton Corridor Transit Initiative
Transportation Projects
Presented by BikeOCNJ bikeocnj.org August 22, 2018
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
Highway 169 Bridge Replacement & Pavement Resurfacing
More people cycling in Edinburgh and more investment
Early Voting Starts Oct. 20 | Election Day Nov
HSM Applications to Multilane Urban Suburban Multilane Intersections
I-295/Malcolm X Avenue Interchange Improvement Project
Moving Towards a Smart City Traffic Services Initiatives
Magnolia Grove Civic Club
What follows after approval of Active Transportation
ARCHIE BRIGGS Traffic Calming
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Bay Trail

Facebook Employee Cycling Amenities Bike Parking Showers Lockers Bike Maintenance Workshops Discounts Resources Campus & Fitness Bike Fleet Support diverse TDM programs (modes). Least footprint, most cost effective, and healthiest is cycling. Made campus more bike friendly.

Local Restripe Improvements Willow Road and Middlefield Road intersection; Willow Road and U.S. 101 bridge; Willow Road between Hamilton Avenue and Bayfront Expressway; Willow Road between Newbridge Street and Ivy Drive; and Willow Road between O’Keefe and U.S. 101 (shared lane marking). Want our employees to be comfortable and safe. With both Bike advocates, SVBC volunteers, & City/Caltrans able to complete…. Collaborated with bike advocates and the City of Menlo Park on potential areas of improvements Agreed to… (Class 1) EPA - (I) Newhridge Street, (ii) University Avenue and Bay Road intersection, (iii) University Avenue and U.S. 101 bridge, (iv) Bay Road, (v) Pulgas Avenue, and (vi) Runnyinede Street. $150k could go to those bike areas ($50 of can go to other traffic. 500k for EPA traffic Completed Willow Rd Newbridge to Bayfront Exwy Investigative Contribution Crosswalk improvements Hwy 101 & Willow Rd

Community & Route Support Bike & Pedestrian Tunnel- Connection under Bayfront Expressway With both Bike advocates, SVBC volunteers, & City/Caltrans able to complete…. Connection of Bay trail crossing under Bayfront- Safe Crossing Tunnel art walls with repair station

Bay Trail Gap Network of Bike Trail- North, South, East Bay 100 Contiguous Miles with 1 Mile Gap Causing 2 Mile Detour

Bay Trail Contribution University Ave from Bayfront Expressway to Railway (half mile section) Review completion of … review with stakeholders (mid-penin open space, ABAG assoc Barea Govts, EPA Important to have safe routes… to the north is not bad but there is a missing section Selected area closest to our campus, but it is a large total project

Collaboration & Continued Support Hosted a Bay Trail Bike to Work Breakfast- January 2012 Education and Support from Other Bay Area Corporations Support and feel would be a beneficial connection to complete the trail Event, then TDM Summit Other employers education for continued corporate support (could help dedicate public funds)