XFEL Bunch Compressor BC1 and BC2 Vacuum Issues

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Review XFEL Injector Introduction K. Floettmann
Superconducting Spoke Resonator Cavities and Cryomodules
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Bunch Compressor 3 Torsten Limberg for Frank Stulle et al.
Progress and Plan for Superconducting RF Cavity RF Group.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Review of the European XFEL Bunch Compression System Summary Torsten Limberg.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
W. Decking, M. Dohlus, C. Gerth, A. Krasnov, S. Lederer, T. Limberg, N. Mildner, D. Noelle FEL Beam Dynamics Meeting, XFEL Bunch Compressor.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Sven Lederer (MVS) Lutz Lilje (MVS) Torsten Wohlenberg (MVS)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
Photo injector dark current at FLASH and efforts for reduction at FLASH and XFEL Svem Lederer Unwanted Beam Workshop 2012 Berlin, Dec 18, 2012.
Two-beam module layout
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
SC Activities at IAP Frankfurt
High energy beam transport.
First ideas on particle free installation of BESSY VSR
Status and plans for the 3.9 GHz section of XFEL
Status of HESR 18th March Gießen Dieter Prasuhn.
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
HFM Test Station Main Cryostat
Preliminary Y-chamber specifications – First draft
XFEL Vacuum System Commissioning
Racks Coordination 09 September 2011 E. Negodin
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Optimum cryomodule length at the ESS
HIE-LINAC status report
XFEL Collimation and Beam Switchyard Vacuum Issues
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
IHEP Cryomodule Status
Diagnostics overview and FB for the XFEL bunch compressors
Advanced Research Electron Accelerator Laboratory
Accelerator R&D Results from the B-factory
Two-beam Test-stand Design and Construction Status
Review of the European XFEL Bunch Compression System: Introduction and Concept Torsten Limberg.
Specifications for the XFEL Beam Switchyard Kickers
Transfer Line for EIC.
SNS PPU Cryomodule Design Overview
Presentation transcript:

XFEL Bunch Compressor BC1 and BC2 Vacuum Issues Nils Mildner, Torsten Wohlenberg, Kirsten Zapfe XFEL Beam Dynamic Meeting

Bunch compressor section BC1 and BC2 General remarks Lengths of the vacuum system BC1 and BC2: BC1: total length ~ 69m → chicane length ~ 27m → deflection of the chicane ~ 0.68m BC2: total length ~ 90m → chicane length ~ 25m → deflection of the chicane ~ 0.33m Vacuum requirements: Pressure needs to be in the range of 10-10 mbar (next to cold sections) Pump system: sputter ion pumps and titan sublimations pumps Both sections are particle free : The design of all vacuum components needs to be according to the particle free conditions. Early discussion of concept of all components including beam diagnostic is necessary! All vacuum components have to be cleaned under particle free condition (clean room). Installations needs to be done under local clean room conditions.

Bunch compressor section BC1 and BC2 General remarks From the point of view of vacuum technology both BC sections should be treated similar. This should be valid for the aspect of material choice, joining technology, support for the chambers etc.. The design concept for the flat chamber in the chicane is similar to FLASH!

Bunch compressor section BC1 and BC2 Girder, frames and support Mounting Concept: 1st remark: The frames and the girder have to be mounted around the helium transfer line! → very difficult! 2nd remark: Working at high level under local clean room conditions! → very difficult, very little space 3rd remark: Installation of the BC sections can not start before the helium transfer line is completely installed! Vacuum chamber and other components will be mounted first on the girder and will be aligned on the girder. This will be done on the floor. Then the complete unit will be mounted into the frame and connected under local clean room conditions. After completion the whole system needs to be aligned. A well thought out alignment concept is needed! The installation of the complete system will take several months.

Bunch compressor section BC1 and BC2 Girder, frames and support Support for the vacuum chambers will be designed by the vacuum group. In the concept to mount the BC from the top, all girders and frames should be designed by the group MPL(?). An examination with respect to stability, oscillation behavior etc. must be done! A well deliberated girder and frame concept will be needed regarding the helium transfer line, the length max. 6m(!) units and with respect to periodical iteration (how many type of girders do we need?)!

Bunch compressor section BC1 and BC2 Schedule Draft: Components layout + girder and frames concept including electronics/diagnostics units concept ~ 1 year Design of BC1 and BC2 ~ 1 year Fabrication of all components ~ 1.5 years 2007, A rough concept should be settled for the girders/frames concept including electronics and diagnostics as well as part of the layout of the components.→ layout for the arrangement of the components should be available! 2008, The detailed concept for the layout of the components, electronic concept and the girder and frames concept should be finished.

Bunch compressor section BC1 and BC2 open issues Do we have the BC‘s chicane to be installed vertically or horizontally? → we prefer vertical installation! Do all components need to be copper coated in both BC’s? Can the RF-shielding remain the same as for FLASH or do we have to design a new concept for the flange connections, bellows, valves and pump connections? Is a massive lead shielding necessary ? → need to be included into the girder and frame design! How does the dump section for BC1 and BC2 look like? What diagnostic installations will be needed next to the beam line?

Bunch compressor section BC1 and BC2 Thank you for your attantion!