ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
Preliminary Design Review
Team GPS Rover Critical Design Review Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Design Review: RoboSiM Robotic Surveillance in Motion
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Group 2  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 7  Spring 2007 Joe Land Ben Fogle James O’Carroll Elizabeth Strehlow.
Phong Le (EE) Josh Haley (CPE) Brandon Reeves (EE) Jerard Jose (EE)
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Final Presentation Group 10  Spring 2005 Jer-Wei Lam (Sean) Jacinto Chang Ming Sum Wong Kevin Muthuri Team Lead Web:
Team /02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
Team: CHEE WHOOO Spring 08. The Team Mitchell La Puente-Project Leader Josh Miyamoto-Software Richard Ordonez-Hardware.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Final Presentation Team 1  Spring 2013 Zelun Tie Xin Jin Ranmin Chen Hang Xie.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
Software Narrative Autonomous Targeting Vehicle (ATV) Daniel Barrett Sebastian Hening Sandunmalee Abeyratne Anthony Myers.
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
Project Overview  Introduction  Frame Build  Motion  Power  Control  Sensors  Advanced Sensors  Open design challenges  Project evaluation.
<Add team picture or relevant project picture here>
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Final Presentation Team 04  Spring 2010
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Design Review Team 8  Spring 2007
ECE 477 Final Presentation Team 8 Spring 2013
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Group 3  Fall 2005
ECE 477 Design Review Team 6 - Spring 2012
Joe Trefilek Jeff Kubascik Paul Scheffler Matt Rockey
ECE 477 Final Presentation Group 5  Spring 2005
ECE 477 Design Review Group 6  Fall 2005
ECE 477 Digital Systems Senior Design Project
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
ECE 477 Final Presentation Team 10  Spring 2008
ECE 477 Design Review Team 5  Fall 2006
Team: 1 Hang Xie Xin Jin Zelun Tie Ranmin Chen
ECE 477 Digital Systems Senior Design Project  Spring 2006
ECE 477 Design Review Team ??  Fall 2012
ECE 477 Final Presentation Team 15  Spring 2010
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
Midway Design Review Team 16 December 6,
Comprehensive Design Review
ECE 477 Final Presentation Team 13  Spring 2011
Team RAPTORS Joe Trefilek Jeff Kubascik Paul Scheffler Matt Rockey
ECE 477 Final Presentation Group 10  Spring 2005
Presentation transcript:

ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress Kevin Muthuri Jer-Wei Lam(Sean) Jacinto Chang Ming Sum Wong Team Lead Web: http://shay.ecn.purdue.edu/~477grp10

Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation Preliminary PCB layout Software design/development status Project completion timeline Questions / discussion

Project Overview Robotic Waitress project Deliver food to designated table autonomously Comprises of two major components – robot and control center Tables’ coordinates file stored on the PC allows remote control of the robot from control center Robot’s navigation algorithm enables smart table-to-table navigation Avoid obstacles using IR sensors

Project-Specific Success Criteria Ability to control robot motion wirelessly w/ control center using RF Ability to avoid obstacle collision in the robot’s path using IR sensors Ability to display robot status on LCD display Ability to navigate using tables’ coordinates file that can be updated Send alerts from robot to control center wirelessly using RF

Block Diagram

Component Selection Rationale Microcontroller – ATmega32 LCD – Hitachi controller based PWM driven modified Servo motor Digital Sharp GP2D15 IR Sensor 418Mhz 315Mhz RF Tx/Rx Power Supply – 4.8-6v Servo Power Supply – 5v to board Control Center – 9v wall adaptor/batt

Packaging Design Robot: Mark III Robot Chassis 2 Wheels, wedge for support Bright RED wheels 8 inch-diameter round tray Custom mount for LCD display Robot base approx 5” X 4” Control Center: RadioShack Project Box Size approx 3” X 2” X 1”

CAD - Packaging

Schematic/Theory of Operation Overview of Main Module Schematic

Schematic/Theory of Operation

Schematic/Theory of Operation

Schematic/Theory of Operation LINX TXM 418/315 LC LINX RXM 418/315 LC-S

Schematic/Theory of Operation

Schematic/Theory of Operation Control Center Module

Preliminary PCB Layout

Software Design Overall Functionality: Provide a user-friendly interface to monitor the status of the robot and to instruct the robot Able to generate a set of instructions to guide the robot to the designated table(s) Allow user to set locations of the tables Able to re-route the robot from its current location

Development Status Software Development Status: Completion of user interface and navigation algorithm Ability to send and receive data through serial port Ability to load the tables’ coordinates file Hardware Development Status: Chassis completed and tray modified Working LCD , sensors Movement functions (i.e. forward, back, left, right)

Development Status Screenshot:

Project Completion Timeline Before Spring Break (Week 8 & 9) : Finish the PCB layout Test tilt sensors and finish motor control program Program the microcontroller for communication with the software Test direct communication between the software and the microcontroller without RF Week 11: Communicate between the software and the microcontroller with RF Finish the coding of the software and hardware Week 12 & 13: Complete testing and debugging the project in real environment Week 14: Finish the packaging and user manual

Questions / Discussion