EMCal DCS Status By B. S. Nilsen, M. Cherney, J. Fujita Creighton University For the EMCal project.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
The Control System for the ATLAS Pixel Detector
S.PopescuAlice DCS workshop, Colmar, Standards for control room PVSS panels A brainstorm meeting.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
EMCal DCS and related Issues with Shutdown/Installation B. S. Nilsen M. Cherney J. Fujita.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Remapping of 48V generators in US15 – Load Balancing Much better balanced load between chan A and chan B outputs More even load between generators, avoiding.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Laurent Locatelli LHCb CERN Calo commissioning meeting 16th April 2008 Trigger Validation Board PVSS control status 1.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
The LHCb Run Control System
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

EMCal DCS Status By B. S. Nilsen, M. Cherney, J. Fujita Creighton University For the EMCal project

Contents Problems to be solved Completed tasks Plans

Problems to be Solved Introduction of Recipes –Been having difficulties making a working implementation. –Recent workshop been very helpful. –Want to have a backup dcs system before we try implementing this again. –Needed to allow for multiple configurations like LED running. Busy occurring during Physics run attempts –Not seen during stand alone runs –Effects ERP Drill and LHC Dry runs ERP Drill and LHC Dry run –Most recent attempt when well (ERP), but effected by busy

Completed Tasks 4/12 Super-modules installed and working. Emergency Button implemented. L0 timing issue understood and patched.

Plans Continue to tack down Busy problems. Obtain and install Parallel PVSS system on new DCS machine. –Implement recipes. –Improve and streamline Control system. –Set up Cooling control and monitoring. –Implement LED calibration. Reestablish remote development and test bed.

The End Thats All Folks

Outline Installation Fee Cards DCS machines Recipes Cooling Emergency Button PVSS panels Going Busy Physics Drill High voltage –ISEG OPC/CANHVcontrol Low voltage Led calibration system L0 timing Planning LHC Dry Run

Installation 4 out of 12 Super modules installed and working.

L0 Latency L0 presently arriving 960ns after interaction (352 BC) Expect to improve by 6 or 7 BC ( ns)

Emergency Button Installed in August Hardware version yet to come.

Fee cards Suspected noise fee card has been swapped (twice now) but noise still there. Problem must be else where. –LTU system. –ELMB system. –?

Going Busy PVSS has Intermittently been going Busy, when trying to go global, OK when in standalone run. Is SOD checks in the physics runs? Still under investigation.

Recipes Been having difficulties making a working implementation. Recent workshop been very helpful. Want to have a backup dcs system before we try implementing this again. Needed to allow for multiple configurations like LED running

Cooling Still some hardware problems and developments under way. PVSS monitoring still under development.

DCS Machine Present machine limits being reached. Acquisition of additional machine just starting. CERN has new contract with HP and dcs machine parameters still under negotiations.

High voltage Intermittent Problems with Iseg HV system have been seen. Simultaneous running of Iseg OPC and IsegCANHVcontrol may be source of problem. Fix planned ASAP.

LHC Dry Run First Try: Failed due to problems with LHC clock switching 10/16/09 Was busy and not in today. 10/19/09 Central DCS has all Detectors In READY state All 4 LHC Experiments will perform 2*(READY-BEAMTUNING-READY)

Physics (ERP) Drill First attempt took 3 tries 10/15/09 Attempt EMCal failed. Most resent drill Performed OK Cycle through READY BEAM-Tuning READY

LED System LED are now working Will require changes in PVSS for proper operations (recipes).

Low Voltage System Operational

PVSS Panels System to date is adequate Will need to be redesigned to better support of full EMCal. Will attempt to make operational efficiencies.

Planning Iseg OPC CANHVcontrol conflict to be removed (go to all OPC control). Continue to tack down Busy problems. Obtain and install Parallel PVSS system on new DCS machine. –Implement recipes. –Improve and streamline Control system. –Set up Cooling control and monitoring. –Implement LED calibration. Reestablish remote development and test bed.