Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)

Slides:



Advertisements
Similar presentations
DTP14 and GTR Drafting Progress Report 66th GRPE 6th June 2013 Informal document No. GRPE th GRPE, 3-7 June 2012 agenda item 3(a) Transmitted.
Advertisements

WLTP-DTP DTP Meeting 1 Wrap-up Reviewed general considerations, methodology and timing Reviewed proposals Created initial working subgroups Preparations.
REPORT TO GRPE 70 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, January 2015 Agenda.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
MACTP MOBILE AIRCONDITIONING TEST PROCEDURE Status report 64th GRPE June 2012 Informal document No. GRPE (64th GRPE, June 2012, agenda item.
MACTP MOBILE AIR-CONDITIONING TEST PROCEDURE Status report 63th GRPE January 2012 Informal document No. GRPE (63th GRPE, January 2012, agenda.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 68 Geneva, 09 January 2014 Informal document No. GRPE (68th GRPE,
Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal.
Informal document No. GRPE (62nd GRPE, 9-10 June 2011, agenda item 3(a)) 1 Summary of 8 th WLTP-DHC Meeting 9 June 2011 Palais des Nations, Geneva.
WLTP - 5h DTP Meeting Zuerich DTP Subgroup LabProcICE slide 1 LabProcICE issues on DTP level Zuerich, April 2011.
WLTP-DTP Subgroup Additional Pollutants September 2011 WLTP-DTP Additional Pollutants Subgroup Validation phase 2? 2011 Bern, EU-WLTP 7 th DTP Meeting-13.
REPORT TO GRPE 66 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (66 th GRPE, June 2013, agenda.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
DTP/DHC update. DTP 13 th to 15 th April, EPA, Ann Arbor Chair: Michael Olechiw (co-chair from India unable to attend) No great advances were made in.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
WLTP 9th DTP Meeting Bern, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
VIAQ IWG Vehicle Interior Air Quality Informal Working Group 1p Progress Report of the VIAQ (Vehicle Interior Air Quality) Informal Working Group Report.
WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Summary of 3 rd Informal Group on WLTP 11 June 2009 Palais des Nations, Geneva Informal document No. GRPE (58th GRPE, 9-12 June 2009, agenda item.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Welcome to the 7th Meeting of.
WLTP-DTP Results from DTP Session 1. WLTP-DTP First Test Procedure Meeting Overview  Hosted by USEPA in Ann Arbor on the 13 th, 14th, and.
Document No. WLTP-17-14e (WLTP IWG #17 – Geneva January 2017 )
Progress Report of World-wide Light-duty Test Cycle
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Electric Vehicles and the Environment (EVE IWG)
1st Informal Group on WLTP Palais des Nations, Geneva
Electric Vehicles and the Environment (EVE IWG)
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
WLTP-14-15e Progress report of Sub Group EV (WLTP-14-15e) 14th WLTP IWG 26 April 2016.
WLTP-DTP Subgroup Additional Pollutants Progress report
DTP12 Report to GRPE 17th January 2013 Palais des Nations
Air Pollution Control and NIR Division
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
WLTP DTP PM-PN Subgroup Activity Report
Electric Vehicles and the Environment (EVE IWG)
Outcome of TFCS-12 - summary slides - (detailed meeting minutes will be provided separately) April The Shilla Seoul, ROK.
Informal document GRPE-77-21
Informal document GRPE-74-20
DTP 7th meeting – Bern September 2011
Air Pollution Control and NIR Division
VIAQ (Vehicle Interior Air Quality) Informal Working Group
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Development of World-wide Light-duty Test Cycle
Lab Process Internal Combustion Engines
Proposal for future maintenance of Mutual Resolution 2
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Correlation Improvements
Transmitted by the IWVTA Informal Group
Electric Vehicles and the Environment (EVE IWG)
Informal document GRPE-78-23
Status Report to GRB #69 Task Force on Reverse Warning issues
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Informal document GRVA st GRVA, September 2018
Status report of TF-CS/OTA
Additional Pollutants Subgroup 7th DTP Meeting-13 September
Working Paper No. WLTP-05-11e
Air Pollution Control and NIR Division
WLTP Informal Working Group
WLTP-DTC Air Pollution Control and NIR Division
Informal document GRPE-79-20
Status Report Cop Taskforce
Note by the secretariat
WLTP DTP – Lab Process ICE
Palais des Nations, Geneva
TF1 Meeting content Open issues of EVS 10th meeting
Status of discussion after 7th meeting
EDR/DSSAD IWG Status Report
Status of discussion after 8th meeting
Presentation transcript:

Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH) Air Pollution Control and NIR Division Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)

Content of the report Background information Meetings since last GRPE Agenda of 6th DTP General issues DTP Subgroup reports Planning of validation phase 2 Next steps

Background information to DTP6 Mr. Krause, secretary of DTP, was unfortunately not present at the meeting for health reasons. Working progress is very good, nevertherless still many open issues remain to be solved until GRPE in January. Draft definitions as well as draft partial test procedures are available but not consolidated yet. GTR manager is not available yet. Start of GTR drafting not possible soon. Final planning of validation phase 2 is an urgent matter now. Relevant set of parameters for implementation of validation phase 2 have to be provided very soon.

Previous meetings of DTP 5th DTP (DTP5) from 12th to 14th April 2011 at EMPA in Dübendorf near Zürich => minutes see document WLTP-DTP-05-11 6th DTP (DTP6) yesterday on 8th June 2011 Documents available on UNECE WLTP website under DTP5th and DTP6th as well as on EU circa website.

Minutes DTP5 (wrap-up and open issues)

Minutes DTP5 (wrap-up and open issues)

Agenda of 6th DTP on 8th June 2011

General issues DTP (ICE progress report) 1. Test temperature (results from UTAC and JRC) 2. Inertia classes (presentation by icct and OICA) 3. Vehicle test mass (presented by NL) 4. Family concept (not handled, postponed) These issues are not essential for validation phase 2 The approach is to have further consolidated discussions at DTP7 in September. Contracting parties are invited to express their views on these issues until DTP7. In particular, have a consolidated EU position on temperature by DTP7.

Subgroup reporting Reports given from LabProcICE, PM/PN, AP and LabProcEV as well as EU study on EV. Working progress regarding open issues and GTR drafting has been shown. Issues not absolutely relevant for validation phase 2 will be discussed after consolidation at DTP7. Relevant parameter needed for validation phase 2 have been addressed within the subgroup. No advice required from DTP so far. Subgroups agreed to deliver set of parameters needed for validation phase 2 by end of July.

Overview planning of validation phases Source: Validation Task Force, lead JRC

Agreed objectives for validation phase 2

Interested parties for validation phase 2 Party Laboratory China, participation to be confirmed EU JRC France UTAC Germany probably Tuev-Nord India, participation to be confirmed Japan NTSEL, JARI, JAMA Korea NIER Netherlands to be defined South Africa SABS Switzerland EMPA and AFHB to be confirmed AECC to be defined OICA to be defined -> Final confirmation needed by end of June to DTP chair!

Draft test matrix for validation phase 2 Draft test matrix presented by Ichikawa-san. Matrix containing number of labs, type of vehicles and parameters to be tested. Matrix has to be considered as starting point for the detailed planning. Detailed planning is going to be elaborated by validation task force. DTP agreed on the principle for both objectives and test matrix for validation phase 2.

Next steps Final confirmation from parties and laboratories regarding participation in validation phase 2 by end of June Subgroups provide set of parameters for validation phase 2 by end of July. Validation task force will provide a laboratory guidance for validation phase 2 by end of July. Next DTP meeting (7th) from 12th to 14th September in Bern (details follow). Subgroups and parties are requested to submit asap the list of participants to DTP7 (number of participants is limited to 40)