Presentation is loading. Please wait.

Presentation is loading. Please wait.

WLTP DTP PM-PN Subgroup Activity Report

Similar presentations


Presentation on theme: "WLTP DTP PM-PN Subgroup Activity Report"— Presentation transcript:

1 WLTP DTP PM-PN Subgroup Activity Report
9th DTP Meeting / Bern 16th-18th April 2012 C. Hosier / C. Vallaude

2 PM/PN Subgroup DTP9 Bern 16-18th of April 2012
Overview Open issues Data to gather during validation 2 GTR drafting Next meeting

3 PM/PN Subgroup DTP9 Bern 16-18th of April 2012
Open Issues OIL => same as GRPE (Jan 2012) OI left need input from VP2 PM-PN Parameter list => same as GRPE (Jan 2012) commented to answer questions from VTF+PL 30th of March meeting

4 Data To Gather During Validation 2 (1/2)
PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Data To Gather During Validation 2 (1/2) PM filter conditioning Minimum conditioning time required Dilution tunnel pre-conditioning and background Is 20 minutes pre-conditioning at 120kph sufficient? Tunnel PN background levels Experience on PN during DPF regeneration To confirm PN measurement system is capable of excluding worst case volatile material during DPF regenerations CVS and filter face temperatures during regenerations? => Integrated in parameter list and global test matrix

5 Data To Gather During Validation 2 (2/2)
PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Data To Gather During Validation 2 (2/2) Ki determination Mode construction PM-PN parameter list PN during regeneration Vehicles Will need regen indicator and inhibitor switch Measure PN before, during and after regeneration Different PN measurement systems Two systems per lab sampling in parallel Impact of VPR pcrf Test over range from (one system at high, one at low setting each test) Two tests at each pcrf setting Impact of CVS dilution on nucleation mode particles Test at max and min CVS dilution DPF fill procedure Either fast loading on engine dyno or on vehicle loading Follow R83 advice on fill state stabilisation for pre-regen tests VPR sulphate removal capability Test with highest sulphur lube oil permitted by OEM and fuel at maximum (10/15mg/kg) sulphur limit Tested by JRC and ACEA

6 PM/PN Subgroup DTP9 Bern 16-18th of April 2012
GTR Drafting PM/PN GTR draft integrated by DC in the global GTR Draft in March 2012 Drafting audioconf on the 23td of March to validate the text and answer DC questions => 3 minor new OI opened Retain or not guidance of filter handling Add a zero span procedure for the balance? Precision of when the PN measurement should be started

7 PM/PN Subgroup DTP9 Bern 16-18th of April 2012
Next Meeting Next meeting: Webconf on the 15th of May 2012 Agenda: New OI from drafting Start on calibration procedure If available have a first look at the validation 2 outputs Organization of VP2 data analysis

8 Thank you for your attention
PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Thank you for your attention


Download ppt "WLTP DTP PM-PN Subgroup Activity Report"

Similar presentations


Ads by Google