SABER A Facility for Accelerator Physics and Test Beam Experiments

Slides:



Advertisements
Similar presentations
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Advertisements

FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
Primary Beam Lines for the Project at CERN
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
CLIC Civil Engineering Update
Options and Recommendations for TL and Dumps
Large Booster and Collider Ring
CLIC Civil Engineering Update
First Look at Nonlinear Dynamics in the Electron Collider Ring
Beam Optics Set-Up at SLAC End Station A
The SPEAR3 Upgrade Project at SLAC
The PEP-II Interaction e+e- Factories Workshop
Maintain a single control room for all accelerator programs
The SPEAR3 Upgrade Project at SLAC
Potential Use of PEP-II Magnets by Project X
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LAL meeting on e+ studies, Oct. 2010
End Station Test Beam (ESTB) at SLAC
Far Experimental Hall Hutches Civil Construction
Final Focus optics for Possible New B-Line
J. Seeman Assistant Director for PPA/LCLS
FACET Accelerator Overview
Linac/BC1 Commissioning P
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
Electron Beam Systems ETC and Methodology
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
High Level Physics Applications for LCLS Commissioning
Longitudinal-to-transverse mapping and emittance transfer
Longitudinal-to-transverse mapping and emittance transfer
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
FACET Accelerator Overview
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Maximum Credible Beam Event Paul Emma et al
Coherent Synchrotron Radiation Study
LCLS Personnel Protection System and Beam Containment System
E. Michael Saleski PPS and BCS Systems Manager
LCLS Injector System Overview D. H
Injector/Linac Design Status C. E
Presentation transcript:

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson DOE HEP Program Review June 7, 2006

FFTB is gone! The Problem: The Final Focus Test Beam (FFTB) is being dismantled to make room for the LCLS. What can be done to replace its functions? SABER: South Arc Beam Experiment Region l A proposed facility for experiments requiring compressed, focused beams of electrons or positrons. l To be built in the Instrument Section in the SLC South Arc tunnel. Description: l SABER White Paper (December 2005) http://www.slac.stanford.edu/grp/rd/epac/LOI/SABER.pdf l SABER Presentation to EPAC (January 2006) http://www.slac.stanford.edu/grp/rd/epac/Meeting/200601/erickson.pdf l SABER Workshop (March 2006) presentations: http://www-conf.slac.stanford.edu/saber/present/default.htm

SLAC Overview with SABER LCLS injector will be installed at Sector 21, downstream of existing positron source. LCLS transport system and undulator will displace the FFTB. SABER consists of three main components: Experimental area with final focus and beam dump in SLC South Arc tunnel. Linac Pulse Compressor upgrade to compress positron bunches. Bypass Line to deliver e- or e+ beams to SABER, bypassing the LCLS.

Recent History of FFTB Final Focus Test Beam (FFTB) Preserved small emittance. Delivered and compressed ultrashort (< 100 fsec) bunches. Strong user demand: Plasma wakefield acceleration SPPS Laboratory Astrophysics Many other unusual physics and technology measurements FFTB turned off April 10. Dismantling started.

SABER in SLC South Arc Tunnel

Architectural Drawing of South Arc Area

South Arc Tunnel People can work safely in the South Arc tunnel, independently of PEP-II or LCLS operations. Easy access through upgraded SW Adit entrance. Convenient space for user building in existing paved area beside SW Adit ramp. Radiation safety issues are easier than in FFTB (SABER is deep underground).

South Arc Tunnel Upstream end of Instrument Section, SW Adit visible to the left. Southwest Adit tunnel, leading to removable shielding wall.

South Arc Tunnel User experiments could be set up in this area. Instrument Section, looking downstream. Floor slopes slightly downward. Instrument Section, looking upstream.

South Arc Tunnel Cross Section

Current Status of South Arc SLC ran until June 1998. South Arc and Instrument Section have been well preserved. Plumbing and most magnets appear to be in good shape. LCW flow has been maintained, except for a few devices in the BSY. Some flexible hoses need preventive maintenance. Vacuum system integrity is OK. System is being pumped down. Control system is functioning; arc magnet movers respond to control system commands. Evidence of radiation damage to some dc cables in BSY area. Mitigation options being explored on ROD days. PPS system has been decommissioned and requires work. Investigation has started. Quadrupole magnets in the BSY zone and non-interlocked corrector magnets in the S ARC zone have been powered up.

Questions/Issues for Experimental Area How much space is needed to accommodate experiments? Current working design: Nominal beam position: 42 inches above the tunnel floor. 39 inches from south tunnel wall. Downward pitch 3.730 deg. Focal point is 2m downstream of face of last quadrupole. Drift following focal point is approximately 70 feet to the next arc AG magnet (where the tunnel starts to curve to the south).

Ease of Access SW Adit entrance: Ramp is approximately 10 ft wide. We envision a 39 inch door (same as FFTB), followed by 4 ft wide PPS maze for personnel and equipment access. Two vertical cable penetrations , currently filled with conduits, can accommodate a few more cables. One is near the upstream end of the IS, and reaches the surface outside the west door of MCC. The other is near the proposed IP and reaches the surface outside the east door of MCC. A cable tray could be installed through the SW Adit (through the maze or above the shielding blocks) to a trailer or other building on the paved area near the SW Adit ramp. Expect total cable length approx 300 feet.

Positron Compressor Chicane Sector 10 compressor chicane has been used successfully for several years, but cannot be used with positrons (because electrons are required to make the positrons, and only one charge can pass through the present chicane). Chicane can be modified to be symmetric for electrons and positrons. Accelerator physics issues: Beam matching: beta x and beta y are interchanged between e+ and e- in the linac. Optical lattice must be tuned to compensate. Pole width of first and fourth dipole magnets will be marginal if used for both e+ and e-. Two new dipoles with wider poles needed.

Proposed Symmetric Chicane

Sector 10 Electron Compressor Chicane

First Dipole of Compressor Chicane Notice that straight-through beam is off center.

Bypass Line A Bypass Line from Sector 20 will allow delivery of 30 GeV electrons to BSY without passing through last third of linac. SABER will then be independent of LCLS operations. Optics design is compatible with connection to the South Arc, but trajectory and engineering details must be refined to minimize interference with existing equipment. Trajectory past Sector 30 and NIT/SIT breakout point passes through a congested area, but can be built with careful planning. Cost could be significantly reduced by converting one of the PEP-II injection transport lines for this purpose.

PEP-II Transport Lines in Linac Tunnel

Linac Tunnel Approaching BSY Bypass Line Bypass Line trajectory will pass over SIT Line through congested area. LINAC SIT Line to PEP-II

Bypass Trajectory near 51AGF Can we find a way to preserve the direct linac-to-SARC connection with the bypass?

Bypass Trajectory into 51B2

B2 Dipoles in 51- and 52-lines LCLS Trajectory 51-Line

Diverging Beam Lines in BSY

SABER Beam Parameters Energy: 28.5 GeV with PEP-II or LCLS with bypass line. Up to 30 GeV with full linac (but not with bypass line). Charge per pulse: 2 x 1010 e- or e+/pulse with full compression. 3.5 x 1010 e- or e+/pulse without compression. Pulse length: σz = 30 μm with 4% momentum spread. σz = 42 μm with 1.5% momentum spread. Spot size at IP: 10 μm nominal; σx, y = 5.2 x 5.4 μm achieved in computer simulations. Momentum spread: 4% full width with full compression. < 0.5% full width without compression. Momentum dispersion at IP: η = 0. η’ = 0.

Focused Beam

Bunch length vs energy spread

Proposed Schedule Refurbishment work in BSY; tie in with PPS: August – October 2006. First electrons to the SLC Instrument Section in early 2007. First useful beam – positrons or compressed electrons through the full linac, interleaved with PEP-II injection pulses, to a dump in the SLC Instrument Section – in mid-2007. Installation of positron compressor chicane in linac: Sept – Oct 2007. Positron beam, fully compressed and focused in 2008. Bypass line in 2009. SABER experimental programs can coexist with PEP-II and LCLS programs. This schedule depends on the availability of engineering manpower and other resources.

SABER Safety Issues Radiation Beam energy and power are substantially less than SLC, which ran successfully from 1986 to 1998. The Sector 10 positron compressor chicane will be a mirror image of the electron compressor, and will incorporate the same safety features. Electrical Magnet voltages in the South Arc will be less than 30 volts, but conductors will be covered or interlocked. Non-ionizing Radiation No new RF sources involved with SABER. Some future experiments may involve lasers, but these will be reviewed when they are proposed. Seismic Hazard Existing South Arc tunnel will be used. No new civil construction. The walls of the SW Adit ramp are being reinforced.

Summary We have seen a constant demand for electron and positron beams in the FFTB from a wide variety of users, but the FFTB has recently been dismantled to make room for the Linac Coherent Light Source (LCLS). A new facility to replace the FFTB will be constructed in the SLC South Arc tunnel. A proof-of-principle study shows that low emittance, compressed bunches can be delivered to users. The electron bunch compressor chicane in the linac will be modified to compress positron bunches, opening up new areas of physics. A Bypass Line from Sector 20 to the BSY can be built to deliver beams to SABER, independent of LCLS. No new safety issues: All beam parameters and electrical hazards fall within previously established limits.

Acknowledgements Special thanks to: Yuri Nosochkov, who has developed optical solutions for SABER. Karl Bane, who has been investigating wake field effects and demonstrated bunch compression in the South Arc. Lynn Bentson, who has done the preliminary engineering studies and cost estimates. Paul Emma, who did initial optics and tracking simulations for the FFTB and has helped in exploring other options. Mark Woodley, who has assisted with design and tracking studies. Patrick Krejcik, who revived our interest in the South Arc option and demonstrated its feasibility. Ted Fieguth, whose dedication to SLAC’s test beam activities has kept these programs alive and who has provided invaluable advice and perspective. John Seeman, who has consistently supported and encouraged these studies. Al Baker, Martin Berndt, Alex Chao, Scott DeBarger, Rick Iverson, Paul Miller, Alyssa Prinz, Mike Saleski, and the MFD and CPE staff members who have been helping assess the feasibility of SABER.