Woodbridge Middle School Renovation Referendum

Slides:



Advertisements
Similar presentations
OUR SCHOOL.
Advertisements

Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
St Andrews School A Tour Of The School By Daniella.
Blissfield Community Schools Strategic Plan Facilities Team.
Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Design Review Planning to date Project scope summary
Background PFI (Private Finance Initiative) School to be built by Miller Construction Government Funded Supported by the Local Authority School is designed.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Budget March 26, 2012 Jefferson Township Public School District.
Quarterly Report September 9, I Lafayette Elementary - New flooring.
Montoursville Area High School – Additions and Renovations Act 34 Public Hearing February 24, 2015.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Haverford Middle School 6 th Grade Orientation. Welcome Mr. Daniel J. Horan, Principal Ms. Elizabeth Mastrocola, 6 th grade administrator Mr. John Berardoni,
Glenvar High School Renovations School Board Presentation
Proposed Budget March 24, 2011 Jefferson Township Public School District.
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
Jim Ned CISD School Bond Election May 8 th, 2010.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
ADDITION & REMODEL Eugene Field Elementary School.
Behind the Scenes at CISD Clifton Elementary School April 14, 2015.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
Saint Croix Central Task Force Findings May 2, 2012.
Design Development Review
…BUILDING THE FUTURE THROUGH OUR CHILDREN! WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems*
Focus Areas Safe and secure buildings and grounds Learning environments that meet the needs of today’s learners Preserve, maintain, and/or improve current.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Bedlingtonshire Community High School New Build
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Warm-Up 1/13 Write down a general plot summary of “Mr. Holland’s Opus”. What do you think I hoped you would learn from viewing this film?
Proposition S “Students First” Election Day, Tuesday, April 5.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
DLS Town Hall. Facilties and Transportation Update History Current Status Near Term and Medium Term Projects Questions & Answers.
Windsor C-1 School District Planning 2017
White Pigeon Community Schools
New Elementary School Planning Committee Meeting February 9, 2017
Instructional Program Budget Overview for
OABCIG General Obligation Bond Referendum Presentation
What do we have at school?
Cornwall Central School District
UPDATE: 8/8/2011 Batavia City School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Woodbridge Township School District Referendum 2017
Miami Palmetto SHS Replacement
Silver Lake Regional High School
Facilities Update November 17, 2017
21st Century School Buildings Plan
Fort Cherry School District
Referendum Discussion
Ross St Elementary School Referendum
Woodbridge Township School District Referendum 2017
2007 Bond Issue Capital Improvement Program
SUMNER H.S. JOB FAIR Saturday, June 18th, 2016
Troy School District Bond Program – Series 1 Construction Update
Primary Longman Elect 2A Chapter 1 There is Is there …?
Where …? Unit 2 Open Day.
Building for the Future of Johnston Schools
BY HERBER.
Woodbridge Middle School Renovation Referendum
Troy School District Bond Program – Series 1 Construction Update
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
Model presentation How to do it.
Bensalem Township School District Feasibility Study
A. Write the correct numbers !
Presentation transcript:

Woodbridge Middle School Renovation Referendum

Woodbridge MS History 1910: Woodbridge HS construction begins Sept. 11, 1911: WHS opens on Barron Ave Additions in 1924, 1926, 1932, 1962, 1970, included the gym, café, auditorium, music rooms/shops, library, 5 classroom annex Sept 1956: WHS opens on Kelly St. ($3.125 million) Woodbridge Junior HS established for grades 6-8. Sept 1959: Grade 9 transferred to WJrHS 1981: Grade 9 transferred back to WHS

WMS Existing

Woodbridge MS Proposed 1. Twenty-two (22) new or renovated classrooms and 6 new science rooms with prep rooms. 2. A new full-size gymnasium with bleachers. 3. New male and female locker rooms and PE office. 4. New instrumental music room and a vocal music room. 5. New art room. 6. The new addition will be air conditioned. 7. New elevator. 8. New nurse’s suite. 9. New main offices and renovated guidance suites. 10. Renovated and expanded toilet rooms. 11. Renovate select areas of the existing building. 12. Fire Sprinklers throughout. 13. Increase student capacity by about 100.

The New Woodbridge Middle School

WMS Ground Floor

WMS Main Floor

WMS Top Floor

Tax increase: $0 WMS Funding Project Costs: $20,960,266 State Aid: $8,398,350 Pilot Payments: $12,561,916 Tax increase: $0

Referendum Info Date: March 14, 2017 Time: 2:00-8:00 pm Location: Local polling sites: Woodbridge MS Mawbey St School #1 Fords MS Port Reading School #9