Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Energy24 limited Modification Proposal 0502: Amendment to Gas Quality NTS Entry Specification at the px Teesside System Entry Point.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Colette Baldwin – E.ON Panel Date: 21 st August A: Mod Title: Inclusion of as a valid UNC communication.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Proposer: insert Panel Date: insert 0XXX: Mod Title: insert title Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Environmental Standing Group. 2 Background  Ofgem issued an open letter on 15 th April 2008 to consider issues associated with carbon assessment for.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Transmission Workstream 6 January 2011
Modification 0607S: National Grid NTS Actions Update
Proposer: Matthew Hatch Panel Date: 20/10/16
Entry Capacity Overrun price calculation
An alternative approach…..
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
Transmission Workstream 4th July 2007
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
UNC 0407 Analysis Scope - Update
Proposer: National Grid NTS Panel Date: 17th April 2014
Richard Fairholme, E.ON UK
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
Assignment Workshop 2 16th September 09, Solihull.
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Exit Capacity Substitution and Revision
UNC 0621L: Amendments to Gas Transmission Charging Regime
UNC 0XXX: Mod Title: insert title
Transmission Workgroup June 7th 2012
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Rebecca Hailes For 15 March 2018
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Proposer: Penny Garner Panel Date: 19 April 2018
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Joint Office Presentation for Modification 0678
QSEC auction timetable
Flow Swaps at NTS / LDZ offtakes
Proposer: Marie Clark, ScottishPower Panel Date: 7 February 2014
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream 1st September 2005
UNC 0621L: Amendments to Gas Transmission Charging Regime
Richard Fairholme Transmission Workstream 4th September 2008
Assured Pressures Proposal
Entry Overrun Calculation
CUSC “Alternate” Proposal process
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Richard Fairholme E.ON UK
EU Codes: Implementation Issues
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Proposer: Colette Baldwin – E.ON Energy Solutions Ltd
Transmission Workstream 6th November 2008
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Offtake Workstream : 19 March 2012
Assignment of NTS Entry Capacity – Work currently being Undertaken
Enabling Large Scale Utilisation of Class 3
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
DSG Governance Group Recommendations.
Capacity Access Review
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014 0498: Mod Title: Amendment to Gas Quality NTS Entry Specification at BP Teesside System Entry Point Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014

Why change? The carbon dioxide limit specified in the Network Entry Agreement between National Grid and BP Teesside terminal is incompatible with new potential offshore developments Initial analysis shows that an increase in the carbon dioxide limit at this ASEP would allow additional deliveries of gas without compromising safe or efficient operation of the NTS UNC modification process is the preferred route, to facilitate the proposed change and also ensures an open, inclusive and transparent process.

Options Offshore or onshore gas processing plant is being considered to reduce the carbon dioxide content, but represents a high cost option and would reduce economic delivery for at least some production.

Solution Change the carbon dioxide limit from 2.9% to 4.0% in the Network Entry Agreement between National Grid and BP Teesside

Recommended Steps The Proposer recommends that this modification should be: Sent to Workgroup assessment to Develop the modification Discuss the results of National Grid work conducted to pre-assess the impact of a higher carbon dioxide limit on the network and consumers Consider with stakeholders other impacts not evaluated so far