Water Science-Policy Interface (CIS-SPI)

Slides:



Advertisements
Similar presentations
The Operational P The Operational Programme adopted by the European Commission The ESPON 2013 Programme EUROPEAN UNION Part-financed by the European Regional.
Advertisements

ESPON 2020 Cooperation Programme EU Stakeholder consultation 27 March 2013 ESPON renewal, refocus and upgrade: Mission, Priority Axes, Specific Objectives,
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
European Commission, DG Environment Unit D.2: Water and Marine Amsterdam, 2/3 December 2004 Slide 1 Item 5.4 RTD / LIFE & Science-Policy Interface Water.
Future outlook and next steps for ESPON The ESPON 2013 Programme OPEN DAYS Bruxelles, 10 October 2007.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
The French National Agency on Water and Aquatic Environments
- Progress and planning- European Commission
SPI activity ( ) – Final phase (Avril to June 2012)
DG Environment, Unit D.2 Marine Environment and Water Industry
MAES Working Group Meeting Brussels
Science Policy Acitivity at the WG E; 22th June 2011
Marine Strategy Framework Directive (MSFD)
14th meeting of Working Group F on Floods
WG 2.B Integrated River Basin Management
Project Coordination Group (PCG) for the implementation of the MSFD
By 2010, IWRM.Net will be established as : 1. THE source for knowledge about IWRM-research being undertaken in Europe, with a focus on the WFD.
Overview of working draft v. 29 January 2018
Mandate and working principles Prep-SCG 13 September 2013
Chemical Monitoring mandate
CRUE – The Way Forward Vicki Jackson
Improving the SCG added value : Food for thoughts
SSG on WFD and agriculture
Science-Policy Interface (SPI) Activities
WG 2.9 Best Practices in River Basin Planning
Two main areas identified
SPI activities update 22nd WORKING GROUP C PLENARY MEETING
Outcome and Perspectives Pilot River Basin Workshop
Improving information exchange:
European Innovation Partnership on Water
Water Science-Policy Interface (CIS-SPI) Progress report
WFD, Common Implementation Strategy   Water Scarcity and Droughts Expert Network Brussels, July 2, 2009.
Lesson from SPI activities 2010
CIS progress June-November 2011: main highlights
IMPROVING PUBLIC INFORMATION
Update on progress since last WG meeting (13-14 June 2002)
Management of Natura 2000 Sites
Natural water Retention Measures
Information on projects
Christos Fragakis (EC DG RTD) Frédérique Martini (France, Onema)
Marie-Perrine Miossec
- Progress and planning- European Commission
Harmoni-CA initiative
Harmoni-CA initiative
Green Paper on Adaptation and
8-c) Expert Group & River Basin Network on WFD & Agriculture
Water Framework Directive 2000/60/EC
Fitness Check EU Water Policy
Strong needs for coordination at EU level
Pilot River Basin Water Framework Directive.
Fitness Check of EU Freshwater Policy
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
EU Water Framework Directive
Science-Policy Briefs in support of Water Scarcity and Drought Policy An attempt to improve knowledge transfer Philippe QUEVAUVILLER Thierry DAVY.
Water Science-Policy Interface (CIS-SPI)
Item 11. Overview of EG activities
Sylvia Barova Unit B.3 – Nature DG Environment, European Commission
WG Integrated Testing in Pilot River Basins
“Water Science meets Policy” Event - 30th September – Brussels
European Commission activities
Proposal for a workshop on monitoring EURO-INBO 2013
WORKSHOP “Emerging environmental pollutants: key issues and challenges” Stresa, Italy June 2006.
Water Science-Policy Interface (CIS-SPI) Progress report
The approved ESPON 2013 Programme
Brussels – 20 April 2007 European Commission - DG Environment
WFD Expert Group on agriculture A new mandate for
Research on Climate Change on Water, including Natural Hazards Contribution to SSG discussions and science-policy interfacing Philippe QUEVAUVILLER European.
Date and venue: 23 September, MSFD PCG, DG Environment, Brussels
Water Director's Meeting December 2013, Vilnius DG Environment
River basin management plans in Europe
Presentation transcript:

Water Science-Policy Interface (CIS-SPI) EUROPEAN COMMISSION RESEARCH DIRECTORATE-GENERAL Directorate I – Environment Water Science-Policy Interface (CIS-SPI) or why SPI Main responsibility: Frederique.Martini@onema.fr - ONEMA Michel.Schouppe@ec.europa.eu – DG RTD Presented by: Robert Kase as SPI correspondent for the WG E contact: robert.kase@oekotoxzentrum.ch 15th WG E meeting at the 14th March 2012, Brussels

Improve WFD Implementation with an ad hoc activity on water Science-Policy Interface (SPI) Organisational structure of CIS: Main objectives of the SPI Interface: Ensure a dynamic interface between researchers, policy makers and water managers To identify research needs and to boost usability of available (or to be produced) results to support WFD implementation or short: to bring need-oriented research into regulation / or to bridge the gap between science and policy The implementation of the Water Framework Directive raises challenges, which are widely shared by Member States. These include: • an extremely demanding timetable ; • the complexity of the text and the diversity of possible solutions to scientific, technical and practical questions; • the problem of capacity building and an incomplete technical and scientific basis with a large number of fundamental issues, which need further elaboration and substantiation to make the transition from principles and general definitions to practical implementation successful; Established in 2001, the CIS aims to allow, as far as possible, a coherent and harmonious implementation of the framework directive : most of the challenges and difficulties arising are inevitably common to all Member States, especially in transboundary river basins where a common understanding and approach is crucial to successful and effective implementation ; a common strategy could limit the risks of bad application of the Directive and subsequent dispute ; Focus is on methodological questions related to a common understanding of the technical and scientific implications of the WFD. The aim is to clarify and develop, where appropriate, supporting technical and scientific information to assist in the practical implementation of the Directive (supporting documents such as guidance documents providing advice on operational methods are developed for this purpose).

The Science-Policy Interface (SPI) is based on: A mandate from Water Directors with 3 tasks: Task 1 : Inventory of research and implementation needs from CIS groups Task 2 : Identify available research and research gaps Task 3 : Improving transfer and usability of research Since 2000 technical milestones of WFD have called for scientific support, technical knowledge, practical experiences and availability of various tools. In this context attempt has been made to establish working relationships among research projects and WFD implementers. From the experience gathered over the last years it appeared that the transfer of knowledge resulting from these projects was not satisfactory enough as only a few projects could contribute effectively and timely to wfd policy milestones. With the aim to improve this situation the water directors of the European Union established in december 2009 the ad-hoc activity on water science-policy interface under the common implementation strategy. This activity has got the objective to link the research needs of relevant WFD end-users with scientific research outputs. In this perspective SPI has got a 3-year mandate 2010-2012 including 3 tasks: this activity is co-led by DG RTD and France

National Water Research MS Participation R&D EU Water research Task 2: Available research EU Task 3: Improved dissemination Water science meets policy Science-Policy Interface Task 1: research needs Common Implementation Strategy (CIS) EU The CIS-SPI activity is divided in three tasks aiming at facilitating water science-policy interface by involving European union and member states at every stages task1: the inventory of research and implementation needs is the basis to evaluate the needs of WFD implementers. The CIS is the place where these needs are expressed task2 aims at inventorying available research and research gaps and at establishing a list of priority research for the attention of relevant funding organisations to ensure that research gaps are known and possibly taken up in research programming activities Task 3: to improve transfer and usability of research SPI acts as a facilitating buffer between the two communities WFD implementation Participation MS National Policy Makers, Managers, « Stakeholders »

increasing specificity of needs? Timetable of SPI May 2010 - Questionnaire #1 (Raphaël Guillet) Initial list of needs (incomplete, not validated) Sept. 2010 - 1st SPI event (10 round tables) Preliminary list of needs discussed Not enough on Priority, Urgency, Knowledge (PUK) Dec. 2010 – call for SPI correspondents nominations by each working group Some delays January 2011 – Questionnaire to FP6/FP7 coordinators July 2011 – Questionnaire #2 (Marie-Perrine Durot), was done during October to January in the WG E Revised list of needs, more on PUK February 2012 – workshop of SPI correspondents to improve networking and share experiences increasing specificity of needs? The questionnaire evaluation will be presented today

Objective and motivation of SPI Overarching objective: to influence research programmes with policy needs for information Report in 2012 to the water Directors: Needs from the CIS working groups and expert groups and related research gaps Indication of main knowledge available Suggestions for developing an operational science-policy interface Within the CIS Within Europe across levels down to local level Proposal for a second mandate from 2013 Iterative process

Thank you for your attention Any urgent questions? Now it is time to identify your needs for later questions, please contact: Frederique.Martini@onema.fr – ONEMA Michel.Schouppe@ec.europa.eu – DG RTD or for simple questions: robert.kase@oekotoxzentrum.ch Any urgent questions?

The 1st SPI event 30 Sept. 2010, Brussels background information: The 1st SPI event 30 Sept. 2010, Brussels Objective: to connect scientists and WFD end-users on research needs & gaps and to improve SPI & dissemination 150 participants from 15 MS and Switzerland 35% from the scientific community, 65% from WFD “end-users” (policy makers & implementers) Nine interactive parallel round tables. « Vertical » as well as « cross-cutting » issues expressed in several roundtables Outcomes: 59 research areas 180 specific research issues Available on CIRCA Move away from sectoral vision ; adopt holistic approach 8 main cross-cutting issues Report sent to EU and national research programming agencies Helped to update research needs from CIS groups with indication of priorities The first “water science meets policy” event was held on 30 September 2010 at DG Research in Brussels and was attended by 150 participants from 15 Members-States and Switzerland as well as Non-Governmental Organisations (NGOs), stakeholder groups, DG Research, JRC and DG Environment. A balanced representation between researchers and WFD end-users was ensured: 35% of representatives were from the scientific community and 65% of representatives were from knowledge end-users. Thanks to nine interactive parallel round tables and plenary sessions this event has helped us to draw the scene in terms of research needs for WFD implementation. It rose in total 59 research areas including together about 180 specific research issues. Overall, the discussions conducted during this session stressed out the need to move away from a sectoral vision and adopt a more holistic approach. Eight main cross-cutting issues were highlighted Research needs discussed at the 1st SPI event (30/09/2010) available through the WFD CIRCA website (under “workshops and conferences”). Report sent to EU and national research programming agencies (ongoing JPI “water challenges”). Panorama of FP6/7 projects relevant to CIS research themes and issues + Ongoing survey to selected projects to identify available knowledge relevant to the CIS research issues On this basis, update of research needs from CIS groups with indication of priorities Nomination of a SPI correspondent in each CIS group

SPI Mandate: 3 Tasks over 2010-2012 Compile feedback from users and future research needs Ensure efficient transfer and uptake of scientific knowledge Task 1 Inventory of research and implementation needs from CIS groups - Inventory of the needs for each CIS WG (based on a questionnaire followed by discussion within or back to back with regular meetings of the WGs) Compilation of the needs from the different WGs Task 2 Available research and research gaps Inventory of available research results relevant to CIS research and implementation needs. Discussion of research gaps on a yearly basis within each CIS Working Group or Activity A list of priority research topics to be communicated to the CIS Strategic Coordination Group once a year, as well as to relevant funding organisations (DG RTD, JPIs, ERA-NETs, others) Task 3 Improving transfer and usability of research outputs Organisation of Water Science meets Policy events (possibly linked to a Water ERA-NET), Compilation of synthesis (2 pages) to translate results from existing RTD projects into “Science-Policy Briefs” (posted on website and CIRCA) Contributing to demonstration of applicability (pilot zones) How does this activity work? Task 1: Inventory of research and implementation needs from CIS groups Each CIS-group makes an inventory of the needs on their field of activity based on their mandates. This can be based on a questionnaire within each WG followed by discussion within or back to back with regular meetings of the WGs. The SPI-group compiles the needs from the different WGs, and ensures that information on existing knowledge is transferred (Task 2), or that gaps are relayed to relevant funding organisations (Task 3). Task 2: Available research and research gaps Inventory of available research results relevant to CIS research and implementation needs. Discussion of research gaps on a yearly basis within each CIS Working Group or Activity A list of priority research topics to be communicated to the CIS Strategic Coordination Group once a year, as well as to relevant funding agencies (DG RTD, JPIs, ERA-NETs, others) Task 3: Improving transfer and usability of research outputs Organisation of Water Science meets Policy events (possibly linked to a Water ERA-NET), Guidance in compilation of synthesis (2 pages) for policy-makers To translate results from existing local/national and EU RTD projects into “Science-Policy Briefs” of relevance to CIS needs To highlight key scientific outputs supporting technical water policy milestones, To be posted on the WFD europa website and CIRCA, and possibly translated in different EU languages to widen taken-up by MS. Contributing to demonstration of applicability : encouraging science-policy networking at most appropriate level (from EU to catchment level). Particular attention is paid to transferring information at the most appropriate timing so that it can be taken up by DG RTD for the yearly programming of the FP work programme (e.g. in March every year) and similarly for the ERANET