Lessons Learnt from Past Disaster David Evans Chief Technical Advisor

Slides:



Advertisements
Similar presentations
Disaster Risk Reduction in Education Sector Lessons Learned 15 years experience of ADPC in Asia Presentation at the Special Event on DRR in Education.
Advertisements

Community Based Care for children affected by HIV and AIDS 9 th ICAAP – Bali August 2009 Carol KIDU DBE MP Minister For Community Development Papua New.
1 The AU-ECA-AfDB Land Policy Initiative Progress Made & Way Forward Joan Kagwanja UNECA Land Governance in Support of the MDGs: Responding to New Challenges.
Workshop B NGOs and the Cluster Roll-Out Strengths and Suggestions for the Future.
Session 281 Comparative Emergency Management Session 28 Slide Deck.
Remote Housing in the Northern Territory DEPARTMENT OF LOCAL GOVERNMENT, HOUSING AND SPORT.
Uganda Child Protection Sub Cluster Transition: Experiences & Reflections Presented by: Agnes M.Wasike National Coordinator – CPWG.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE. 2 Implemented in 12 countries of Africa, Asia, Latin America and the Middle East, through IUCN regional.
RE BUILDING VILLAGES IN 30 DAYS BY PETER ROBERTS.
1 Disaster Management and Environment Concepts. 2 Session Objectives We will discuss Disaster management (DM) vocabulary DM process and sequence Actors.
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session discusses the assistance methods and mechanisms for.
Shelter Training Château de Penthes, Geneva, 12th – 14th May 2008 based on content developed by This workshop explores the assistance methods and mechanisms.
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
1.Humanitarian Library 2.Humanitarian Training 3.Humanitarian Meeting 4.Policy Development Shelter Centre Current Activities Shelter Centre is an NGO that.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session identifies the six transitional reconstruction.
UN Roundtable on Older Persons in the 2004 Tsunami February 13-14, 2006 Recommendations.
National Disaster Risk Management Program NDRMP Belgrade, March
Einstitute.worldbank.org The Great East Japan earthquake and tsunami Lessons learnt and recommendations for developing countries January, | 10:00.
Evaluation of OCHA’s Role in Humanitarian Civil-Military Coordination Findings and Recommendations Seminar on Evaluation of UN Support for Conflict Affected.
Working Group 4: Urban Governance for Risk Reduction: Mainstreaming Adaptation into Urban Planning and Development Chair: Prof. Shabbir Cheema Rapporteurs:
May 6-7, 2011 Academy House, Seoul. Ecumenical Challenge 1. Immensity of disaster 2. Need for capacity building and training due to insufficient experience.
Humanitarian coordination S3.1 session day 5 3 training delivered by lead partners Habitat for Humanity, RedR and Shelter Centre on 2 nd to 9 th July 2011.
CONTRIBUTING TO FUND THE GLOBAL HUMANITARIAN SHELTER RESPONSE THE HAITI EXPERIENCE.
1 Presentation On Disaster and preparedness situation in Uganda At SILVER SPRINGS HOTEL, UGANDA 16 th -SEPTEMBER-2011 BY LAZARUS OCIRA
Kyoto University Graduate School of Global Environmental Studies Community Based Recovery Process: Lessons and Challenges Rajib Shaw Associate Professor.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Regional Livelihoods Fisheries Programme for South and Southeast Asia (RFLP) An Introduction for CTFF, Bali Funded by The Kingdom of Spain through the.
GLOBAL SHELTER CLUSTER Update May GLOBAL SHELTER CLUSTER IASC members & standing invitees GSC active participants UNHCR, IFRC – co leads/conveners.
Day 1 agenda by 15th - 16th of November 2007 | Geneva | hosted by NRC 09:00 – 09:30 09:30 – 09:45 09:45 – 10:00 10:00 – 10:30 10:30 – 11:15 11:15 – 11:30.
Green Recovery And Reconstruction: Training Toolkit For Humanitarian Aid Livelihoods Session 1: Livelihoods, Disasters and Ecosystems.
Special Session II Increasing Investment for Disaster Risk Reduction.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p Title of session Short one-sentence description of session.
Reconstruction following a disaster. 1.What is Habitat for Humanity? 2. HFH History in disaster reconstruction 3. A picture of disaster trends 4. HFH.
QATAR SHELTER INITIATIVE Overview and Background.
The IASC Humanitarian Cluster Approach Angelika Planitz UNDP BCPR Developing Surge Capacity for Early Recovery March 2006.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This workshop discusses implementing a strategy for supporting.
CLUSTER UPDATE Shelter Meeting 12a 24 May CCCM Goals improving living conditions, monitor standards, identify gaps and advocate for service provision.
International Federation of Red Cross and Red Crescent Societies Tore Svenning International Federation of Red Cross and Red Crescent Societies The Federation.
Day 1 09:00 – 09:30 09:30 – 09:45 09:45 – 10:00 10:00 – 10:30 10:30 – 11:00 11:00 – 11:30 11:30 – 12:00 12:00 – 12:30 12:30 – 13:00 13:00 – 14:00 14:00.
Housing, Land and Property Working Group Housing, Land and Property (HLP) Shelter Meeting 2012 Geneva 24 May 2012.
Shelter Meeting 09a, Geneva Topic:Urban Displaced Objectives:to know about 1) the status quo of current initiatives 2) the project “guidelines.
Tsunami Disaster Response Encouraging effective material giving and citizen action The Habitat for Humanity experience…
Natural Third Session of the COP 1 Disasters and Disability Emerging Issues Global Partnership for Disability and Development.
Mario C. Flores Director, Disaster Response Field Operations Habitat for Humanity International Shelter Meeting 10b Palais des Nations, Geneva 2-3 December.
Housing as a Process, Not a Product
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session introduces the six transitional settlement options.
Humanitarian Context: Current trends and expectations Session
Cash for Repair & Reconstruction Project, Sri Lanka 1 November 16 / 2006 Cash for Rehabilitation Home owner driven housing reconstruction project in Sri.
Strengthening national capacities for coordination and implementation of disaster risk reduction United Nations Development Programme Regional Centre in.
IFRC Shelter Coordination Workshop Environmental Issues C. Kelly Env. Reference Group ProAct Network.
Responsive Innovation for Disaster Mitigation Gordon A. Gow University of Alberta.
Saving lives, changing minds. Shelter cluster workshop The Shelter Cluster Approach.
CARE in Emergency Shelter and Reconstruction. 1. What is Our commitment to Shelter? 2. What impact does Shelter have? 3. What are the programming options.
Gender Affairs Programme
Recovery and Reconstruction in India: Future Directions
Development Partners Roundtable
Greening Reconstruction: experience of WWF’s EDM Program
Shelter Working Group Meeting Monday 16 June, 10AM
Housing, Land and Property (HLP) Rights in Shelter:
Peacebuilding Priority Plan Heads of Mission
ERF Briefing for WASH Cluster
The Islamic University of Gaza- Higher Studies Deanery
Presented by Jianping YAN UNDP/ BCPR/ GRIP On behalf of
Local Based Programing
Shelter and reconstruction options
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Shelter and settlement options
Developing a shelter strategy
133 Implementing settlement programmes
Presentation transcript:

Lessons Learnt from Past Disaster David Evans Chief Technical Advisor UN-HABITAT Lessons Learnt from Past Disaster David Evans Chief Technical Advisor Sri Lanka

Asian Tsunami: Indonesia; Sri Lanka; Thailand; India; etc USA: Katrina The last ten disasters up to Haiti (not comprehensive list)…… India: Gujarat Iran: Bam Asian Tsunami: Indonesia; Sri Lanka; Thailand; India; etc USA: Katrina Pakistan: 30,000 sq km of destruction/inhospitable terrain Indonesia: Jogyakarta Myanmar (Burma): Nargis China: Sichuan Italy: L’Aquilar Haiti (Chili) How quickly we start to forget….. First photos

Pakistan

Pakistan

Contractor built houses that nobody wants (roof?)

Integrate housing + drainage/WASH

New urban apartments Sri Lanka

Home Owner Driven houses Sri Lanka: UN-HABITAT/IFRC

International Response Sri Lanka US$10,000 per Family

International Response Myanmar US$23 per family (thatch repair)

Myanmar One Year after! 26th March 2009

Tin sheets (‘Flying razor blades’) waiting to be missiles in the first storm

HOW TO GET INTO TROUBLE Not listening to the affected people Not knowing the right things to do Lacking experience Underestimating technical difficulty Confusion over who has Authority/Responsibility Not getting or developing clear statements of requirements (How many, where?) Too many changes in personnel in Governmnet ‘Project Managementteam and Ad Hoc institutions

Things to know Consultation with families. Bottom up Strong committed engagement from government essential to coordination mechanism, particularly around data collection and enforcement of standards. Shelter Cluster should be chaired by government and supported by co-chairs made up of a UN-Agency and a NGO (continuity ensured between UN and NGO). Strong coordination at hub or township level required. The ‘Centre’ must be responsive to the issues raised from the hubs. Danger that the centre just ‘takes’ and does not ‘give’.

Unambiguous shelter standards are required Unambiguous shelter standards are required. There should be no confusion between emergency standards and ER Shelter standards Compliance with standards, agreed by the Shelter Cluster Technical Working Group, is essential. Donors have influence over their implementing partners. Shelter Coordinator should brief donors to ensure that donors insist on compliance. Donors should be aware that shelter coordination requires funding for approximately two years after a major disaster to ensure best practices are followed and value for money is achieved.

Shelter provision is one of the most effective direct and indirect livelihood generators and shelter provision should feature in donor livelihoods strategies. There is no ‘one-fit’ shelter solution. Cash grants, materials provision, full construction are all valid initiatives. However, using large contractors has globally and locally resulted in less consultation, less engagement of affected families and more expensive construction. Focus on funding must be maintained through the transition from Humanitarian response to Early Recovery. The transition is a ‘danger period’ for loss of focus and momentum and once lost, it may not be possible to regain.

There is a clear need for Public Information campaigns to explain eligibility. This is essential to avoid frustration, jealousy and negative rumours spreading which can result in equity related social conflict. Grievance/Dispute mechanism required Policy uncertainty = Loss of momentum NGOs and Donors driven by large budgets. Not good programmatic sense. Beware, the relationship can quickly deteriorate! Absence of integrated planning and land allocation led to almost 20% non-occupation of contractor built Promote low-cost insurance

Training artisans essential: invest in training Last slide Reconstruction takes time. Not just about money more about ‘absorbative’ capacity Disaster as Opportunity: Design-out Vulnerability and Design-in Sustainability Local Solutions and Foreign Architects -Not ‘listening’= Inappropriate design Training artisans essential: invest in training National policy issues need to be developed quickly and consultatively Provide what people need, not what your agency has to offer! Get people out of camps ASAP . Reduce dependency increase self –help/sustainability HLP/ Land Titles: mechanism to resolve disputes/blockages Owner Driven Versus Contractor driven: Speed; Cost; Quality; Satisfaction levels Learn from past: TEC and Clinton NGO Initiative - READ(at least the exec summaries)!!! End

Thank You David Evans UN-HABITAT Email: david@unhabitat.lk Tel:+94722265003 June 4th 2010