@richmond2015 | /richmond2015 TRAFFIC IMPACT BRIEFING.

Slides:



Advertisements
Similar presentations
Every participant in the Scotiabank Toronto Waterfront Marathon, Half Marathon and 5k has their own dream of reaching the finish line. On September 27.
Advertisements

Capital Beltway HOT Lanes Project Project Update April 2009.
January 2012January 2012 SundayMondayTuesdayWednesdayThursdayFridaySaturday 1 Company Holiday 2 Company Holiday 3 Role play good neighboring & street teaming.
Final Four Briefing Public Safety Committee March 24, David O. Brown Chief Of Police.
Spring Break in Hermann Park Traffic Closures, Driving Directions & Communications Strategy 2012.
I-295 Flyover Project Western Henrico County Why is this being built? To improve the flow of traffic on I-64 between Route 288 and I-295 I-64: more than.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
2 Presenter Nancy Lipscomb Director of Employee Relations & Local Government Services.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
U.S. 33 Northern Connector Alternative
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Presentation to Maxwell Place Homeowners Association 1.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Tucson Modern Streetcar Project Overview July 15, 2011.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Florida Gas Transmission Section #2 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Tampa By-Pass Canal to East of Lake Magdalene Hillsborough.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
Becoming a Road Respect Community. WHAT IS ROAD RESPECT?
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
PAPAL VISIT 2015 CITIZEN ADVISORY LOWER PROVIDENCE TOWNSHIP.
Kara Salazar Center for Earth and Environmental Science Indiana University-Purdue University Indianapolis
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
 San Diego is one of only eight iconic international cities to host the World’s highest level of Olympic distance triathlon, and the only stop in North.
Sunday June 19, What is a Gran Fondo? “Gran Fondo” means “Big Ride” in Italian Gran Fondos are NOT a race; they are mass participation bicycling.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Traffic Incident Management at the Big Dig Presenter: Kevin A Duffy- CA/T Manager of Emergency Planning & Response
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Florida Department Of Transportation District IV Office of Modal Development Commuter Choices 2004 Summit 2004 Summit.
1 Some Findings on Public Outreach for Work Zones.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Excel-(1d) Under $50,000 Without a Consultant Iway Project: I-95 South to I-195 East Rhode Island Department of Transportation – Office of Communications.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
Snow and Emergency Weather Policy & Procedures
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
McKellar Park Information Session
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Advanced Simulation and Performance Measurement in the BNMC-CDB North Area.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Downtown Remaining Work November 20, Questions & Answers.
Storm Recap Update June 18, sandyspringsga.gov Timeline: Storm Impact  Tornado warning issued at 8 p.m., Thursday June 13 Sirens activated & EOC.
Union Station Bus Concourse. FasTracks Map As the hub of RTD’s FasTracks program, the redevelopment of Denver Union Station is a crucial component of.
City Manager Report – May, 2016 Presented to: Minot City Council City Manager Report – May, 2016 Presented to: Minot City Council Lee Staab, City Manager.
Evacuation Procedures City Council October 20, 2015.
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test 16-Inch Saint Petersburg Lateral Pipeline From Polk City to Lakeland Polk County.
Arizona Forward Update
100,000 OPPORTUNITIES INITIATIVE
Center City Connector 101.
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Dublin City “Open for Business” Transport Plan
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
M14A/D Select Bus Service
Harbour Island Force Main Replacement
U.S. 20 at State Road 2 New Interchange
Symbols Other Marshal Points Race HQ (Static or flag marshals)
Interstate 95 Corridor Improvement Plan
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

@richmond2015 | /richmond2015 TRAFFIC IMPACT BRIEFING

Event Overview Community Outreach Plan Congestion Mitigation Overview Daily Impact / Plan AGENDA

Test event for the 2015 UCI Road World Championships May collegiate cyclists from 100 universities Saturday races for 300+ non-collegiate cyclists More than a bike race EVENT OVERVIEW

Friday, May 2 - Team & Individual Time Trial Saturday, May 3 - Criterium (Collegiate & ProAm) Sunday, May 4 - Road Race SCHEDULE

PRE-PHASE| BEFORE FEBRUARY 25, 2014 Ongoing effort to excite, engage and inform regional communities –Onsite presence at more than 30 events –Spoke to nearly 100 neighborhood, civic & community groups –Operated Bike Valet at Folk Festival, Redskins Training Camp and more –Visibility through ongoing social and traditional media efforts Direct communications with large organizations and attractions along race route to educate and inform COMMUNITY OUTREACH

3 PHASED PLAN 1.Engaging Community w/ Details 2.Direct Dialogue w/ Impacted Businesses & Residents 3.Traffic Management Plan Outreach & 2 nd Wave of Prologues Ongoing activities across all 3 Phases: Traditional and social media, event presence, speaking opportunities, neighborhood meetings, etc. COMMUNITY OUTREACH

PHASE 1 | FEBRUARY 25 – MARCH 18 Engaging community with route information –Extensive local media coverage –Social media buzz –Direct s (leveraging 3 rd party lists) –2015 Hotline & Website resources –Reverse 911 message to city residents –Community-wide Prologue events COMMUNITY OUTREACH

PHASE 2 | MARCH 19 – EARLY APRIL Direct outreach to impacted businesses, organizations and residents –Door-to-door outreach with leave-behind to businesses –Direct mail / door-hanger to residents along routes –Detailed planning with major employers along routes COMMUNITY OUTREACH

PHASE 3 | APRIL – MAY, 2 Announcement of traffic management plan & 2 nd wave of community Prologue events –Announce traffic management plan (road closures & alternatives) –Media Campaign: paid media, PR, PSAs, social media, Reverse 911, etc. –Direct outreach via direct mail and –2 nd Wave of Prologue events focused on downtown areas COMMUNITY OUTREACH

@richmond2015 | /richmond2015 TRAFFIC MITIGATION PLAN

A Focus On: Safety – Event participants, event attendees, citizens, commuters, emergency response, prevention of event related events and incidents. Efficiency – Effective utilization of transportation grid given limitations imposed by course, identify and correct grid deficiencies prior to event. Predictability – Clearly define affected area and distribute clear instructions on area access and event footprint. Utilize same planning methods for 2015 for familiarity. Emergency Response –Specialized emergency response services. CONGESTION MITIGATION

Coordinated process between partner agencies, businesses and organizers to minimize disruption and maximize potential of event. Provide bridges into the race island that allows traffic movement Real time traffic signal timing adjustments Strategic Spectator Experience Parking Fan areas Maximize existing traffic grid via specialized instructions and regulations. Communication of detour plans prior to and during event. Begins at I95/I295 in north, I64/I295 in east, I95/I295 in south and I64/288 in West. Inner Loop CONGESTION MITIGATION

Start/finish line buildout Registration/package pickup Rider/Team Meetings Location affected:Broad Street in area of 5 th Street Street Closures:Broad Street between 3 rd and 7 th Street 5 th street between Marshall and Grace 3 rd street between Clay and Broad Closures begin approximately 7 PM THURSDAY, MAY 1 BUILD-OUT

Morning: Team Time Trial Afternoon:Individual Time Trial Location affected:Downtown, Fan Street Closures:Time Trial Circuit Course Special Consideration Areas: 8 th and 9 th Street/Manchester Bridge, Broad Street and Main Street,14 th Street/Mayo Bridge, Interstate Exit ramps VCUMC area Altria Theatre, CenterStage, State Offices, VCU Academic Campus, Downtown Expressway Street closures and tow routes to begin approximately 3 AM with traffic worked through until 30 minutes prior to start at 9 AM. Full course closure for duration of event with access only occurring at designated locations. Event end time approximate 4:30 PM, road reopening and clearing of personnel expected to take additional 1 hour for full reopen. FRIDAY, MAY 2 TIME TRIALS

Morning/Afternoon: Criterium Location affected:Business District Collegiate Criterium Course West Boundary 1 st Street East Boundary8 th Street North BoundaryMarshall Street South BoundaryMain Street In-Bound Access & Out-Bound Access The Criterium is an island course located in the Business District, there are no major impacts to In-Bound or Out-Bound Arteries. Street closures and tow routes to begin approximately 4 AM with traffic worked through until 30 minutes prior to start at 8 AM and will reopen at approximately 10 PM. Traffic issues are limited to local traffic flow around the course and the interior island portion of the course. SATURDAY, MAY 3 CRITERIUM

Road Race, all divisions Location Affected: Fan, Downtown, Shockoe Bottom Street Closures: Richmond Road Race Course Special Consideration Areas: Federal Courthouse, Libbie Terrace, Dock Street Apartments, Altria Theatre, VCU academic Campus Street closures and tow routes to begin approximately 2 AM with traffic worked through until 30 minutes prior to start at 7 AM. Full course closure for duration of event with access only occurring at designated locations. Event end time is approximately 6:30 PM, road reopening and clearing of personnel expected to take additional 1.5 hours for full reopen. SUNDAY, MAY 4 ROAD RACE

SPECTATOR EXPERIENCES Friday, May 2 Prime Viewing Spots: Start/Finish at Convention Center Monroe Park Monument Avenue Special Events/Attractions: Afternoon Block Party (2-6 at Convention Center) Annual Collegiate Awards Banquet* Saturday, May 3 Prime Viewing Spots: Start/Finish at Convention Center Entire 0.9 Mile Circuit Special Events/Attractions: Family Friendly Expo (All day at Convention Center) Course-Side VIP Hospitality (Start/Finish area)* *Requires paid ticket, which can be purchased at

SPECTATOR EXPERIENCES Sunday, May 4 Prime Viewing Spots: Start/Finish at Convention Center Monroe Park Monument Avenue Libbie Hill Special Events/Attractions: Family Friendly Expo (All day at Convention Center) Course-Side VIP Hospitality (Start/Finish area)* *Requires paid ticket, which can be purchased at

UPCOMING PROLOGUE EVENTS Need details FOR MORE INFORMATION PLEASE VISIT: Need details