Construction of Balkhashskaya TPS

Slides:



Advertisements
Similar presentations
Astana - November 2008 “Break Through Projects of the National Company “KazMunayGas”
Advertisements

Annual Report 2003 Bank van de Nederlandse Antillen Willemstad, July 5, 2004.
2012 Investment project of cement plant construction in Soligalich municipal district of the Kostroma region.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
1 Ongoing strategy of development and reconstruction of electricity sector of Tajikistan Rafika Musaeva Chairman of Association of Energy of Tajikistan.
EBRD: Financing opportunities for Natural Resources projects in Central Asia MINEX Central Asia 2015, Astana, Kazakhstan 19 March 2015.
1 City of Astana City of Astana is located in the North Kazakhstan. As of January 1, 2012 the area is 0.7 thousand square kilometers, the region's population.
JSC Kazakhtelecom 30 November 2006Almaty. 2 Kazakh Economy Kazakhstan is Central Asia's largest economy Rapid growth over the last three years, buoyed.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
RUSSIAN POWER. IN ANTICIPATION OF NEW PACES LONDON, INNOVATIONS IN THE RUSSIAN ELECTRIC POWER INDUSTRY. HOW TO ATTRACT INVESTMENTS? Pavel.
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
2010 December Kazyna Capital Management Kazakhstan fund of funds Corporate presentation.
Mosenergo June 2002 Mosenergo A Leader In The Russian Electricity Sector.
ENERGY MIX IN SENEGAL WHICH ONE TO CHOOSE? General Directorate APUA CONGRESS. LUANDA 2014 Safiétou DIALLO Technical Adviser.
Technical and economic indicators of industrial productivity expansion. Student: Hotovets D. Scientific supervisor: Zborovska E. Language consultant: Lypska.
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
1 Pavlodar Region The region is located in the north of the country. As of January 1, 2012, the area is thousand square kilometers, the region's.
April, Investor presentation.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Financing Innovation March 25, 2004 Knowledge Economy Forum III Budapest, Hungary NATIONAL INNOVATION FUND KAZAKHSTAN.
1 Slovak Policy in the area of RE and EE Juraj Valach Ministry of Economy Slovak Republic July 3-4, 2003, Szentendre.
MRSK of the Centre and Privolzhye OJSC geographical location Currently, the ‘Interregional Distribution Grid Company of the Centre.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
1 CONFIDENTIAL Madi Kanafin Senior specialist at Sectorial department on transport and logistics infrastructure, KAZNEX INVEST, JSC Mob:
Energy Strategy of Russia for the Year 2030 Oil & Gas Outlook Russia 2009 December, 8, 2009 Moscow Alexey Gromov PhD in Economic Geography Deputy General.
1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
© «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March «Samruk-Green Energy» LLP Bagdat Oral Project Manager.
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
KEGOC's performance in 2015 KEGOC. Functions of the System Operator  Provision of system services for:  Transmission of electricity in the National.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Republic of Kazakhstan Kim Violetta, Graduate of Kazakh National University Republic of Kazakhstan Kim Violetta, graduate of the Kazakh National University.
ASTANA BENCHMARKING: International experts opinion and recommendations ,700 TWh According to international experts global energy resources.
ГММ -1( а ) Li Jianfei. By 2040, the world and, in particular, countries which have large and technologically advanced economies – such as the USA,
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
DSM financial cost and modelling
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Investment Opportunity
Russia for investors: the key points 2016.
Operations to Manage Balances in the Treasury Single Account
Functions of the System Operator
OGK-2 Group 9M 2016 IFRS Results
Feasibility Study for Thermoforming Production Plant
OGK-2 Group FY2016 IFRS Results
GEORGIAN ELECTRICITY MARKET OPERATOR
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
SUMMARY Of project of deep processing of red pepper seeds to give water soluble oil with capsaicin 2700 tons capacity / year * *resume has familiarization.
Construction of a new international terminal in Shymkent
Modern Russia’s Approach to Energy Cooperation in Northeast Asia
Cross-border Infrastructure Projects
AB “Energijos skirstymo operatorius” Financial results for 6 months of
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
GIE Annual Conference Bratislava, September 2006
Energy Sector Overview
Ministry of Finance of the Republic of Tajikistan
EBRD: Financing opportunities for Natural Resources projects in Central Asia MINEX Central Asia 2015, Astana, Kazakhstan 19 March 2015.
TGC-1 9М 2018 IFRS Results 9 November, 2018.
Annual report on the regulated services provided in 2018 by KEGOC
Presentation transcript:

Construction of Balkhashskaya TPS “САМҰРЫҚ” МЕМЛЕКЕТТIК АКТИВТЕРДI БАСҚАРУ ЖӨНIНДЕГI ҚАЗАҚСТАНДЫҚ ХОЛДИНГI“ АҚ JSC “KAZAKHSTAN HOLDING FOR MANAGEMENT OF STATE ASSETS “SAMRUK” АО “КАЗАХСТАНСКИЙ ХОЛДИНГ ПО УПРАВЛЕНИЮ ГОСУДАРСТВЕННЫМИ АКТИВАМИ “САМРУК” Construction of Balkhashskaya TPS Investment Forum of Kazakhstan 2008, July Seoul, Korea

The Project is included to the List of breakthrough projects Construction of Balkhashskaya TPS Actuality Program for development of Unified energy system of the Republic of Kazakhstan until 2010 with perspective to 2015. approved by Ministry of energy and mineral resources of the Republic of Kazakhstan (MEMR RK) 07.07.04, №150 The Project is included to the List of breakthrough projects approved by Protocol of the State commission on economy modernization issues of the Republic of Kazakhstan №7 dated 04.06.07. Correction of forecasting balances of power energy and power capacity within the regions, oblasts and territory of the Republic of Kazakhstan approved by MEMR RK 22.05.06, №160. Deficit of power energy in South region

Construction of Balkhashskaya TPS

mlln.USD (currency 120,7KZT/1$) Construction of Balkhashskaya TPS Project costs mlln.USD (currency 120,7KZT/1$) Construction of the 1st module 2 411 Construction of the 2nd module 2 086 Other expenses, excluded from estimated costs, comprising maintenance of direction and technical personnel of the Balkhashskaya TPS 203 Total capital costs 4 700 Scheme of financing: Share capital – 30% from the total volume of investments 1 410 Loan capital – 70% from the total volume of investments 3 290

Reach of rated capacity Construction of Balkhashskaya TPS Key performance figures № Figures Units of measurement Reach of rated capacity 1 Total cost of construction (at the prices of 2008-2013), total including VAT mln. USD 4 497 2 Specific capital investments including VAT USD/kWt 1 704 3 Average unit prime cost of product for project exploitation period (with discounting) USD/KWth 0,046 4 Net profit (mid-annual for billing period ) mlln. USD 434,357 5 Net present Value (NPV) for billing period (rate 10%) 75,542 6 Simple capital investments payback period years 9 7 Discount payback period 28 8 Internal rate of Return (IRR) % 10,27

Reach of rated capacity Construction of Balkhashskaya TPS Key performance figures № Figures Units of measurement Reach of rated capacity 1 Established electric power output МWt 2 640 2 Annual electric power production mln.kWth 17 160 3 Annual electric power supply 15 444 4 Annual reference fuel consumption thousand tons of r.f. 4 942 5 Annual natural fuel consumption - coal - fuel oil thousand tons 8 649 36 6 Specific reference fuel consumption for electric power supply Gramm/kWth 320 7 Total number of employees person 800 8 Construction period month 102

Kazakhstan South region Construction of Balkhashskaya TPS Kazakhstan South region The South region of the Republic of Kazakhstan includes Almatinskaya, Zhambylskaya, Kyzylordinskaya, Yujno-Kazakhstanskaya and the largest city of the country – Almaty city. Existing deficit is covered by cross-flows from North of Kazakhstan and Central Asia

the main power generator in the region, there is a need in Construction of Balkhashskaya TPS Kazakhstan South region Taking into account loading and depreciation of Zhambylskaya GRES (oil-fired) – the main power generator in the region, there is a need in Construction of power station, which can cover the increasing demand of electricity in the region.

Key figures of the TPS TPS capacity Construction period Fuel Construction of Balkhashskaya TPS Key figures of the TPS TPS capacity Determined electric capacity of the station is 2 640 WВт; Annual power production is 17 160 mlln. kWt·h; Assembly – modular – installation of 2 modules per 2 power blocks; Energy block capacity – 660 МВт. Construction period 1st module 2 х 660 MWт (1320 MWт) – 2008 - 2013 (66 months); 2nd module 2 х 660 МWт (1320 МWт) – 2011 - 2016 (72 months). Fuel The coal of Ekibastuz Coal Basin according to the “Conceptions for fuel complex development of the Republic of Kazakhstan” Consumption: after running the 1st module – 4 324 000 tons/year; after running the 2nd module – 8 648 000 tons/year. Feasibility study Elaborated by “KazNIPIEnergoprom” Institute, LLP and approved by corresponding government bodies.

Location of the Project realization Construction of Balkhashskaya TPS Location of the Project realization Republic of Kazakhstan; South-west of Balkhash lake shore on the border of Almatinskaya and Zhambylskaya oblasts; Earlier specified and partly completed construction site of Yujno-Kazakhstanskaya GRES (YuK GRES). Reasons of choice: The central part of electric power transit “North-South” of Kazakhstan – are power lines with voltage 500÷220kV. Creation of power output in this region will significantly increase the capacity of existing and under construction high voltage lines; Enhancement of the reliability of power supply in south of Kazakhstan during the construction of Balkhashskaya TPS; Prevention of unacceptable growth in prices for power energy in South region of Kazakhstan (cheap coal instead of expensive oil fuel and gas) Availability of large water source – Balkhash lake allows to organize a process of water supply for TPS. Within the project implementation for construction the Yujno-Kazakhstanskaya GRES on the estimated site a range of preparatory works have been implemented.

Realization of the Project Construction of Balkhashskaya TPS Realization of the Project SPV shall be created as Balkhashskaya TPS, JSC, which will perform as project company with following functions: Attraction and organization of financing the Project; Project administration; Conclusion of EPC contract (Engineering, Procurement and Construction Contract – «turn-key» contract); Exploitation and assets operation, built up as a result of Project realization. Conclusion of contracts with KEGOC, JSC – the national (100% state owned) electric grid operator of RK and other consumers to supply electric power. Проверить насчет обеспечения гос гарантией Possible involvement of state guarantee in the project realization as a security for attracted loans.

Strategic or portfolio Construction of Balkhashskaya TPS Financial structure Samruk-Energo, JSC 25% from share capital of BTPS, JSC Strategic or portfolio Investors 75% from share capital of BTPS, JSC Lenders Share capital Balkhashskaya TPS, JSC 30% from Project cost [1 410 mlln USD] Loan proceeds 70% from Project cost [3 290 mlln. USD] guarantee cash flows from the Project PROJECT ЕРС contract

Construction of Balkhashskaya TPS Financial structure In order to realization a capital intensive Project from power energy sector a long term financing is required, when capital investments generate stable and predictable cash flows. Project financing increases investment profit in virtue of high financial instrument, it allows to attract strategic investors. Existence of sound possibilities to use a mechanism of public-private partnership.

Contracts for electric power purchase Construction of Balkhashskaya TPS Financing traffic pattern INVESTORS LENDERS FINANCING Equity capital Loan capital ЕРС contract Balkhashskaya TPS Contracts for electric power purchase Power consumers Balkhashskaya TPS, JSC Debt return Profits

Effects from the project realization Construction of Balkhashskaya TPS Effects from the project realization Construction of Balkhashskaya TPS: will insure the coverage of future burdens in the region, will increase reliability of electric power supply, will create a necessary reserve of power energy, will allow to realize the export potential of the Republic of Kazakhstan.

Holding Samruk, JSC tel: +7 7172 976 551 fax: +7 7172 790 400 www.samruk.gov.kz Samruk Invest LLP tel: +7 7172 790 851 fax: +7 7172 790 851