Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.

Similar presentations


Presentation on theme: "1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period."— Presentation transcript:

1 1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 114 mln. Location: Almaty region Implementation period: 2015-2016 Project scope: Construction of Solar Electric Power Plant with 50 MWt in Almaty Region to supply electricity. Finished product: Electricity Production capacity: Annual Electricity Output – up to 73,9 million KWt*h per year Potential markets: Republic of Kazakhstan Provision of land and premises: Possibility of communication connection (electric power, water, canalization and other): The Line 220 KWt will be projected. No Project for Water Supply. Availability of transport infrastructure (existing Road Kapshagay – Bakanas). Required financing: USD 114 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name JSC “Reliable High Technology” Year of establishment 2005 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: JSC “Reliable High Technology” Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

2 2 CONFIDENTIAL Project information Contact Construction and operation of Wind Power Plant 300 MW in the Shelek wind соrridor Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 420 mln. Location: Almaty region Implementation period: 2015-2017 Project scope: Almaty region (3,5 mln. population, 0,225 mln sq. km). During 30 years suffers from deficit of 4 bln. kW-hour per year. Power is supplied and distributed from the north of Kazakhstan, by distance 1500 km with large losses ( 30%). Finished product: Electricity Production capacity: 300 MW WPP, output of 960 mln. kW-hour per year. Potential markets: RK, Almaty region Provision of land and premises: Possibilities of formation of the minimum authorized capital by Kazakhstani companies (30% from total cost of project) for attraction of financing. There is a rail way on a distance of 10 km from the WPP site and international high way on a distance of 14 km. There are two local roads for WT delivery on site. Required financing: USD 420 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «EcoWatt» LLP Year of establishment 2009 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «EcoWatt» LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

3 3 CONFIDENTIAL Project information Contact Construction of 48 MW wind power station nearby Arkalyk city in Kostanay region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 115 mln. Location: Kostanay region Implementation period: 2015-2018 Project scope: Construction of a wind power plant with the capacity of 48 MW using wind potential nearby Arkalyk city. Finished product: Electricity Production capacity: According to preliminary project data the following parameters can be defined: annual power output is 143 million kW/h, number of hours of set capacity use is 2,483MW WPP. Potential markets: RK, Kostanay region. Provision of land and premises: Company is ready to co-invest up to 35% from the total cost of the project. Required financing: USD 75 mln. Required investor type: Payback Period72 months Payback Period disc. PI Project capex Project NPV Project IRR27.6 Company name "Kaz Wind Energy" LLC Year of establishment - Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: "Kaz Wind Energy" LLC Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

4 4 CONFIDENTIAL Project information Contact Construction of hydro power station in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 2 mln. Location: South - Kazakhstan region Implementation period: 2018 Project scope: Use of renewable energy sources and reducing the deficit of electric power in region. Finished product: Electricity Production capacity: 1.8 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: We have all required materials. Required financing: USD 2 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «Kelesgidro- stroy» LLC MHES «Mamyt» Year of establishment -2013 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «Kelesgidro-stroy» LLC MHES «Mamyt» Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

5 5 CONFIDENTIAL Project information Contact Construction of hydro power station in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 3 mln. Location: South - Kazakhstan region Implementation period: 2017 Project scope: Use of renewable energy sources and reducing the deficit of electric power in region. Finished product: Electricity Production capacity: 3 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Required financing: USD 3 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «Kelesgidro- stroy» LLC MHES «Shanyshkyly» Year of establishment -2013 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «Kelesgidro-stroy» LLC MHES «Shanyshkyly» Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

6 6 CONFIDENTIAL Project information Contact Construction of hydro power station in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 2 mln. Location: South - Kazakhstan region Implementation period: 2016 Project scope: Use of renewable energy sources and reducing the deficit of electric power in region. Finished product: Electricity Production capacity: 3 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Required financing: USD 2 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «Kelesgidro- stroy» LLC MHES «Azamat» Year of establishment -2013 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «Kelesgidro-stroy» LLC MHES «Azamat» Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

7 7 CONFIDENTIAL Project information Contact Construction of the cascade of Chazinskiy HPP-1,2,3,4 station Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 88 mln. Location: Almaty region Implementation period: 2015 - 2017 Project scope: Production of electricity using renewable energy sources for electricity consumers of Almaty region. Finished product: Electricity Production capacity: 206,8 mln. Kw/h Potential markets: RK, Almaty region. Provision of land and premises: - Company is ready to co-invest up to 20% from the total cost of the project. Required financing: USD 70.4 mln. Required investor type: Payback Period 100 months Payback Period disc. 170 months PI Project capex Project NPV 4250815 Project IRR13% Company name "ASPMK-519" LLP Year of establishment -2000 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: "ASPMK-519" LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

8 8 CONFIDENTIAL Project information Contact Construction of solid waste processing plant in Kostanay city Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 46.8 mln. Location: Kostanay region Implementation period: 2015 - 2017 Project scope: - Finished product: - Production capacity: - Potential markets: RK, Local garbage collector and recycling Tazalyk-2012 LLC, Kostanay city. Provision of land and premises: - Required financing: USD 46.8 mln. Required investor type: Payback Period 6 months Payback Period disc. PI Project capex Project NPV 3500000 Project IRR22.1% Company name "LBM" LLC Year of establishment -2000 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: "LBM" LLC Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

9 9 CONFIDENTIAL Project information Contact Solar farm construction in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 50 mln. Location: South - Kazakhstan region Implementation period: 2013 - 2014 Project scope: - Construction of a solar farm with the capacity nearby Shymkent city. Finished product: - Electricity Production capacity: 20 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Company is ready to co-invest up to 30% from the total cost of the project. Required financing: USD 35 mln. Required investor type: Payback Period 120 months Payback Period disc. PI Project capex Project NPV Project IRR Company name Promondis Каzakhstan LLP Year of establishment - Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: Promondis Каzakhstan LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz

10 1010 CONFIDENTIAL Project information Contact Construction of Kiyat small hydro power station Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 2.33 mln. Location: South - Kazakhstan region Implementation period: 2019 Project scope: - Use of renewable energy sources and reduction of electrical power deficit. Finished product: - Electricity Production capacity: 1.8 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Company is ready to co-invest up to 20% from the total cost of the project. Required financing: USD 1.86 mln. Required investor type: Payback Period 84 months Payback Period disc. PI Project capex Project NPV Project IRR Company name Кelesgidrostroy LLP Year of establishment 2013 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: Кelesgidrostroy LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: +7 7172 91 90 40 (ext. 1072) E-mail: Dzhumagaliyev@kaznexinvest.kz


Download ppt "1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period."

Similar presentations


Ads by Google