ISO-9001 Quality Management System

Slides:



Advertisements
Similar presentations
Start With Trust 1 eBrochure.
Advertisements

Department of Environmental Quality Environmental Management System Overview.
ISO 9001 : 2000.
Contractor Management and ISO 14001:2004
The ISO 9002 Quality Assurance Management System
Government of Canada Canadian General Standards Board Gouvernement du Canada Office des normes générales du Canada STANDARDS IN ACTION: HELPING THE PUBLIC.
Quality Management.
Every Solution Consultancy ISO 9001:2008 Certification IMPLEMENTATION Web:
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
A case study of Quality Standards implementation in TASNEE Company ISO 9001: 2000, ISO 14001:2004 & OHSAS By Abdulgader Alharthi.
ISO Quality management International Organization for Standardization International Organization for Standardization It addresses various aspects.
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Basics of OHSAS Occupational Health & Safety Management System
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
Avoid Disputes, Not Complaints Presented by: Stuart Ayres and Derek Pullen Stuart Ayres, Scheme Manager Derek Pullen, Scheme Adjudicator.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
Visit us at E mail: Tele:
QUALITY MANAGEMENT STATEMENT
STS-FRM-003, rev. 1, 12/7/07 April Department of Street Services Management Review April
Q u a l i t y 1 Austin Energy Electric Service Delivery Quality Management System.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Developing a Plan for Accessibility The City of Brandon Accessibility Plan 2016.
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.

UNDERSTANDING ISO 9001:2008.
Account Management Overview
Base Maintenance Contract (BMC) Industry Day Participants
Bureau of Indian Education Tribal Interior Budget Council
The following training presentation is for all subcontract employees and is taken upon joining a contract or task order to which we are the Prime vendor.
Administration of a FIDIC Contract - Project Control
ISO An introduction Part 3
Facility Manager IPM PLAN and Policy
Enhance customer service access options;
Michigan Department of Education
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Group No.2 Sagar 07 Husain 08 Sunil 09 Arup 10 Rahul 11 Saad 12
UNIT V QUALITY SYSTEMS.
OH&S Management System
Building inspections division
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
INTRODUCTION TO ISO 9001:2015 FOR IMPLEMENTATION Varinder Kumar CISA, ISO27001 LA, ISO 9001 LA, ITIL, CEH, MEPGP IT, Certificate course in PII & Privacy.
ENGM 620: Quality Management
Quality Management Systems – Requirements
ISO An introduction Part 3
New Mexico Business Portal Closeout Department of Information Technology Estevan Lujan, Acting Cabinet Secretary September 26, 2018.
SUPPLIER PARTNERSHIP 2.
QUALITY MANAGEMENT SYSTEM
Lockheed Martin Canada’s SMB Mentoring Program
Evaluating Provision for Students with Additional and Special Educational Needs in Post-Primary Schools Briefing for the Education Partners 4th September.
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
UNDERSTANDING FOR STANDARD
Facility Manager IPM PLAN and Policy
ApprenticeshipNC Regional Collaboration and Expansion Project
Seminar Series on Total Quality Management
How to conduct Effective Stage-1 Audit
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
Articulation Manual Faculty Senate Presentation
Evaluating Provision for Students with Additional and Special Educational Needs in Post-Primary Schools Briefing for the Education Partners 4th September.
How to Conduct Effectively
Diversity management system (DMS)
PRESENTATION TO PORTFOLIO COMMITTEE ON DMR 2010/ 11 ANNUAL REPORT
Performance based planning and programming
Presentation transcript:

ISO-9001 Quality Management System Department of Street Services September 28, 2012

Briefing Outline Overview of the Department of Street Services ISO 9001 Quality Management System Certification/implementation process Communication and Awareness Return on Investment Challenges

Department Overview $72M budget with 563 employees Organized into four business units: Street Repair Division Asphalt Concrete Service Maintenance Areas (4) Contracts, Finance, and Inspections Transportation Division

Department Overview (cont.) Responsible for: Street maintenance and repair Right-of-way maintenance Traffic control maintenance and engineering Emergency Response

ISO 9001 certification process 2005: University of Texas at Arlington (UTA)-Texas Manufacturing Assistance Center (TMAC) partnered with Department of Street Services to implement ISO 9001 within the Street Repair Division 2006: Council approved multi-year contract with the UTA -TMAC to implement ISO 9001 Quality Management System entire Department of Street Services other City Departments

ISO 9001 certification process (cont.) TMAC in conjunction with Street Services Developed process maps for each service provided by Department Developed work instructions to standardize work processes Established measurable objectives to serve as guiding principles for each business unit

ISO 9001 certification process (cont.) TMAC in conjunction with Street Services Conducted a series of internal audits to identify opportunities for improvement Implemented monthly management reviews to monitor progress foster decision making Developed a quality manual that outlines StreetWorks way of doing business

ISO 9001 certification process (cont.) Pre-Assessment conducted on January, 2007 Final audit completed February-March, 2007 ISO 9001 Certification Awarded March, 2007

ISO 9001 certification process (cont.) Dallas became first major city in the US to achieve ISO 9001 certification for an entire city department Department of Street Services became first major department to implement an Internal Inspection Program to monitor Quality Control.

Return on Investment Initial Return on Investment A documented quality management system Improved internal communication Consistent and repeatable processes Customer feedback showing signs of increased customer satisfaction Corrective and preventative action systems to facilitate continual improvement Employee buy-in through training and involvement

Challenges satisfying ISO-9001 requirements Multiple & non-integrated audits Competency requirements Document control Mapping process Intelex license

Conclusion Questions/Comments

Appendix

Measurable Objectives Developed for each business unit to address: Delivery of service Efficiency Quality Customer feedback

Objectives for Service Maintenance Areas Measurement Source 1. Delivery of Service / Efficiency Respond to 98% of 3-1-1 service requests in accordance with the Service Level Agreement (SLA). The total number of service requests completed compared to the total number received Customer Response Management System / 311 2. Quality Achieve a 90% pass rate for all SMA Quality inspections The number of passed inspections compared to the total number of inspections STS Inspection Program 3. Customer Satisfaction Actively review positive and negative feedback from currently available resources The number of complaints and commendations per quarter Witness Outstanding Work (W.O.W) http://cod/WOW/

Objective 1 for Service Maintenance Areas

Objective 2 for Service Maintenance Areas

Objectives for Street Repair Division (SRD) Measurement Source 1. Delivery of Service / Efficiency To ensure 92% of service requests for major asphalt street repairs and 80% of service requests for major concrete street repairs are completed within the Service Level Agreement (SLA). The number of service requests completed on time compared to the number received Customer Response Management System / 311 2. Delivery of Service / Efficiency Perform maintenance work planned projects in accordance with FY 2011/12 program goals The number of lane miles completed per goal Performancesoft 3. Quality Achieve a 98% pass rate for all Quality inspections The number of passed inspections compared to the total number of inspections STS Inspection Program 4. Customer Satisfaction Actively review positive and negative feedback from currently available resources The number of complaints and commendations per quarter Witness Outstanding Work (W.O.W) http://cod/WOW/ Street Services Customer Service Questionnaire

Objective 3 for Street Repair Division

Objectives for Contracts, Finance, and Inspections Measurement Source 1. Delivery of Service / Efficiency / Quality Process 99% of payments for goods and services within 21 days from the date received The number of payments processed within 21 days divided by the total number of payments processed monthly Accounts Payable Log (sys-copy) 2. Quality Measure the percentage of mowing and sweeping work performed by the contractor that is accepted according to the City’s specifications the first time The number of passed inspections compared to the total number of inspections Performancesoft 3. Customer Satisfaction Actively review positive and negative feedback from currently available resources The number of complaints and commendations per quarter Witness Outstanding Work (W.O.W) http://cod/WOW/ Customer Response Management System / 311

Objective 1 for Contracts Finance & Inspection

Objectives for Transportation Measurement Source 1. Delivery of Service / Efficiency / Quality To ensure 95% of service requests for traffic sign emergencies are completed within the Service Level Agreement. The number of service requests completed on time compared to the number received Customer Response Management System / 311 2. Quality To ensure 80% of streets have acceptable levels of visible striping The number of streets inventoried compared to the total number of streets with less than acceptable levels of visible striping Performancesoft 3. Customer Satisfaction Actively review positive and negative feedback from currently available resources The number of complaints and commendations per quarter Witness Outstanding Work (W.O.W) http://cod/WOW/ Street Services Customer Service Questionnaire

Objective: Respond to Traffic Sign Maintenance - Emergency Calls in accordance with the SLA. 117 108 88 124 88 68 121 108 92 117 152

Example of a work instruction Internal Inspection Program

Communication Door-hangers Project signs

1-Stop Shop for Document Control Quality, Environmental and Occupational Health & Safety Management System http://www.4eval.com/Dallas/STS/Streets.htm