HYDROENERGY IN ALBANIA

Slides:



Advertisements
Similar presentations
PROSPECTIVE INVESTMENT IN ALBANIAN POWER SECTOR
Advertisements

THE ALBANIAN ENERGY SECTOR ITS POTENTIAL AND INVESTMENT OPPORTUNITIES
ENERGY SECTOR IN MONTENEGRO
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Introduction to the Albanian Public Procurement System Central Asia Regional Public Procurement.
Albania-EU Energy Efficiency Centre *
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
Audit Committee in Albania Legal framework Law 9226 /2006 “On banks in Republic of Albania” Law 9901/2008 “On entrepreneurs and commercial companies” Corporate.
Informations about Brazilian Auctions Reserve Energy Auction – LER 2013 Date of Occurrence : August 23th, 2013 Date for Supply: September /2015.
„We can together use the power of water”. 73,000 Gorazde, Žilići bb, Bosnia and Herzegovina Goražde Sarajevo 55 km.
Hydropower Development: Experience of Nepal
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
BUSINESS and POLICY BB1: Leading EU markets: achieving the vision Wind Energy in Italy: policy framework, incentives, industry and market development Luciano.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY 9th Public Procurement Knowledge Exchange Platform May, 28-31, 2013 Skopje
The Importance of Hydropower and the Dam of Włoczławek
1 Ongoing strategy of development and reconstruction of electricity sector of Tajikistan Rafika Musaeva Chairman of Association of Energy of Tajikistan.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
-BUSINESS FORUM- MONTENEGRO PROJECTED REAL GROWTH IN 2015 PROJECTED AVERAGE ANNUAL ECONOMIC GROWTH UNTIL ,5%3,8% MACROECONOMIC INDICATORS.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Recent legislation of Ukraine in RE and EE (accepted from July 2014 till now) Georgiy Geletukha, PhD Head of the Board, Bioenergy Association of Ukraine.
RENEWABLE ENERGY IN ALBANIA Tirana, September 22 nd, 2008 NATIONAL AGENCY OF NATURAL RESOURCES.
Innovative projects on renewed energy sources. 2 Main objectives of realization of investment projects in the republic of Belarus The purpose: Increase.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY E-procurement in Albania, up to date…
Milija Čabarkapa NGO Green Home Steps towards sustainable development of small hydropower plants in Montenegro.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December.
EVN’s Wind Power Plan Ho Chi Minh city, 23 November 2015.
1 June 8, 2008 Vienna Economic Forum Tirana – The European Priorities in the Energy Sector for the Development of the Region Drs. Erik Regter.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
CONSTRUCTION PERMITS FOR A COMPETITIVE REGION Mrs. Eglantina Gjermeni Minister of Urban Development, Republic of Albania.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Erdeneburen HPP Project Implementation Unit
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 2– Freedom Movement for Workers Bilateral.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Green Electricity Clearing & Settlement Company Private-Public-Partnership for the Austrian green electricity promotion system Implementation & handling.
Hydropower development of Bulgaria: current state and future outlook Valentin Ivanov Deputy Minister Ministry of Economy and Energy.
Integrated Water Resources Management in Albania and Climate Change Technical Secretariat of National Water Council Ministry of Agriculture, Rural Development.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
Albania Trade and investment opportunities
Opportunities for renewable energy investments in Serbia
Renewable energy support schemes in the Republic of Moldova
Astrit BARDHI Myrteza BRANESHI Thomaq KOBLARA Marjola PUKA
Mini hydro plants in Volta Region Republic of Ghana
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
From: Nuclear Power as a Basis for Future Electricity Generation
STATE LAW OFFICE AND DEPARTMENT OF JUSTICE
Impact of distributed generation on power system: Case study
HPP USTIKOLINA Sarajevo, May 2017.
Prospects for cooperation in the field of energy
On the procedures for the award of concessions for the ports of nautical tourism in the Republic of Croatia – de lege lata et de lege ferenda Dr. Nina.
Lao People Democratic Republic
Simplification and reduction of administrative burden.
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
ENERGY SECTOR IN MONTENEGRO
Highlights of the Ethiopian Energy Sector
HYDROPOWER DEVELOPMENT
General Directorate of Fire and Rescue Service of Albania
Energy Sector Overview
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
THE INTRODUCTION OF NUCLEAR POWER IN EGYPT AN OVERVIEW
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
“Projects and Impementation of Renewable Energy „
Your partner with over 70 years of experience
Technical Guidelines for the Development of International Standards for Small Hydropower Plants   DONG Guofeng ICSHP  7 November, 2018.
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

HYDROENERGY IN ALBANIA NATIONAL AGENCY OF NATURAL RESOURCES HYDROENERGY IN ALBANIA Tirana, September 22nd, 2008

HYDROGRAPHIC AREA The hydrographic territory of Albania has a surface of 44,000 km2 or 57% more than the national area of our country The average height of the hydrographic territory of Albania is very large, about 700 m above sea level The average perennial total inflow of Albanian rivers is about 1,245 m3/s All our rivers running to the sea about 40 billion water cubic meter/year

HYDRO RESERVES IN ALBANIA River Length km Catchment area km2 Average flow. m3/s Buna 41 5.187 320 Drini 285 14.173 352 Mati 115 2.441 103 Ishmi 74 673 20,9 Erzeni 109 760 18,1 Shkumbini 181 61,5 Semani 281 5.649 95,7 Vjosa 272 6.706 195

PHASES OF ELECTRICITY DEVELOPMENT During the years 1945-1951, it was produced in average 10 KWH per resident. In 1952, was put in operation the Hydropower Plant (HPP) of Selita, with installed power 5 MW. In January 1958, was put in operation the HPP of Ulza, with installed power 25 MW. In 1970, were put in operation HPP of Shkopeti, HPP of Bistrica I and HPP Bistrica II, with installed power 51.5 MW. In 1971-1978, were put in operation HPP of Vau i Dejës and Fierza, 750 MW. In 1985, was put in operation HPP of Koman, 600 MW.

ELECTRICITY DEVELOPMENT PHASES Actual situation 6 big HPP: 1426.5 MW 36 small HPP: 33.9 MW Main generation base Cascade on Drini river: 1350 MW Cascade on Mati river: 49 MW Cascade on Bistrica river: 27.5 MW Possibilities for water potentials utilization Theoretical potential energy: 4500 MW Exploited potential: 1465.5 MW

POWER GENERATION AND INSTALLED CAPACITIES CHART OF BIG SCALE HYDRO POWER PLANTS

MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN ALBANIA DRINI RIVER Drini river derives from Ohri lake of Macedonia running to Adriatic Sea Hydropower potential : 1750 MW On Drini river are actually constructed : Vau i Dejes HPP, with installed capacity: 250 MW Fierza HPP, with installed capacity: 500 MW Komani HPP, with installed capacity: 600 MW Project-proposals under the concession issue procedure: Skavica HPP, with installed capacity 350 MW. It is an unsolicited proposal of TGK & Kinglor consortium. They are actually preparing Terms of Reference and standard documents for Skavica HPP bid. Ashta HPP, with installed capacity 50 MW, is at the end of concession contract negotiations to the Austrian Verbund Company. VAU I DEJES HPP FIERZA HPP KOMAN HPP

MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN ALBANIA MATI RIVER Mati river derives from Burreli and Peshkopia areas running to the Adriatic sea. Hydropower potential: 112 MW On Mati river, actually, are constructed: Ulza HPP, with installed capacity 25 MW Shkopeti HPP, with installed capacity 24 MW

MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN ALBANIA DEVOLLI RIVER Devolli river derives from Devolli and Korca areas running to Adriatic Sea after its bundling with Osum river. Hydropower potential: 350 MW On Devolli river, actually, is constructed Banja HPP, with projected capacity 60 MW. It is not finished yet. There are only performed 40% of works before the year 1990. Project-proposals under the concession issue procedure: Concession obtaining of HPP’s cascade on Devolli river by Austrian EVN AG Company.

MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN ALBANIA OSUMI RIVER Osumi river is the main branch of Semani one. Its total length is 161 km. The water-accumulation surface is 2150 sq km and 828 m above the sea level. Project-proposals under the concession issue procedure: It is under way working on technical and economic feasibility study of projects for HPP’s construction on Osumi river, which will be notified from the Albanian Government as solicited proposals.

MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN ALBANIA VJOSA RIVER Vjosa River derives from Pindi mountains of Greece. Hydropower potential:  400 MW On Vjosa river actually is constructed Kalivaçi HPP, with installed capacity 90 MW, that has obtained the concession by BEG-Energy Company and Deutch-Bank. Project-proposals under the concession issue procedure: It’s under way working on technical and economic feasibility study of projects for HPP’s construction on Vjosa river, which will be notified from the Albanian Government as solicited proposals.

MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN ALBANIA BISTRICA RIVER Bistrica River derives from Delvina (Saranda), area and Blue Eye Spring Source running to Jonian Sea On Bistrica river actually are constructed: Bistrica 1 HPP, with installed capacity 20 MW Bistrica 2 HPP, with installed capacity 5 MW

SMALL HYDRO POWER PLANTS IN ALBANIA There are 90 SHPP in Albania, with installed capacity from 20 kW to 9200 kW, which are constructed before the year 1990. Among them, are put in operation only 36 SHPP. The average long life of SHPP is about 25 years. SHPP’s equipment are made in Austria, Germany, China, Hungary and Italy. Some spare parts of them are made in Albania. Type of turbines are: Frencis, Pelton and Banki. From all SHPP results: 32 HPP, with installed capacity 24.4 MW have obtained the concession issue procedure. 16 HPP, with installed capacity 2 MW are owned by private companies 42 HPP, with installed capacity 12.5 MW are owned by state.

ACTUAL ADMINISTRATIVE STATUS OF SHPP 36% 18% 46% With Concession Private State

ACTUAL ADMINISTRATIVE STATUS OF SHPP SHPP with Concession 81% 19% working out of working State SHPP 5% 95% working out of working Private SHPP 56% 44% working out of working

LEGAL FRAMEWORK Law No. 9663 dated on 18/12/2006 “On concessions”; Ministers Council Decision No.27, dated on 19/1/2007 “On approval of rules for evaluation and concession procedures”, changed with MCD No. 87 dated on 16.01.2008 Ministers Council Decision No.150, dated on 22/03/2007 “For the organization and function of Concession’s Treated Agency” (ATRAKO). Minister decision No.536, dated on 27/07/2007 “On regulations approval for the administration of the documents and requests for concessionary agreements and “Bonus evaluation criteria” Law No.8987, dated on 24.12.2002 “On facilitating conditions establishment for new power generation resources construction” Law No.7970, dated on 20.07.1995 “On Arrangement of Electricity Sector”, changed with Law No.9072, dated on 22.05.2003 changed recently with the Law No. 9913, dated on 05.05.2008 “ For some adding and changes in Law No. 9072 … ” Law No. 7764, dated on 02.11.1993 “On foreign investments” Law No 8093 dated on 21.03.1996 “On water reserves”

IMPLEMENTATION OF THE LAW “ON CONCESSIONS” IN HYDROPOWER SECTOR 120 are unsolicited proposals 27 are concessionary contracts approved by Ministers Council Decision, with total installed capacity 125 MW and power generation of 602 GWh/year It is under way negotiating the concession contract of HPP’s construction on Devolli river, with installed capacity 350 MW It is almost finished negotiating the concession contract of Ashta HPP, with installed capacity 44 MW-70 MW

THANK YOU FOR YOUR ATTENTION Marjana Çoku HYDROPOWER DEPARTMENT Marjana.coku@akbn.gov.al www.akbn.gov.al