Presented to: DOE/CETC Ottawa 2005 Bob Bechtold Harbec Plastics, Inc.

Slides:



Advertisements
Similar presentations
Recycling Waste Heat – CHP as an alternative
Advertisements

Alternative Sources of Energy Distributed Generation economics, variability factors, capacity contributions, and environmental considerations related to.
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Scottsdale, Arizona May.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Qualified Energy Recovery A Green Power Technology No additional fuel consumption Near zero emissions with air cooled OEC Inside the fence installation.
Recovered Energy Generation
1 2/9/2014 Energy Savings, Power Reliability, Environmental Stewardship The benefits of on-site cooling, heating and power.
Technical & Economic Assessment Grid, Mini-grid & Off-grid Electrification Technologies Chubu Electric Power Co.,Inc. (CEPCO) Toyo Engineering Co. (TOYO)
Technology, Energy Efficiency & Renewable Energy for Emission Reduction John Morrison and Ward Lenz Advanced Energy April 20, 2004.
< C ² Carbon Reduction Technology Ltd A Revolution in Lighting - The e-lamp.
F LORIDA S OLAR E NERGY C ENTER Creating Energy Independence Since 1975 A Research Institute of the University of Central Florida 1 Taking Charge of Our.
Renewable Energy Workshop, January 19, 2007 CHP Combined Heat and Power (Waste Heat Recycling) Dave Dewis Elliott Energy Systems.
ME 416/516 Basic Energy Units, Terms and Calculations War Eagle! Roll Tide!
World energy economy at a glance Uri Barenholz Weizmann institute of science December, 2011.
Your panelists Benefits, Technologies & Services: Mike Carter and Mark Farrell, Energy Engineers.
Presentation Heading Air Source Heat Pumps Jordan Jeewood
Solar Motor Works 90% of the fuel load gone 1)Engine 2)Solar collector 3)Thermal energy storage Solving our energy needs All three together is Engine system.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Federal Reserve Bank of Boston Case Study
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
COST OF COOLING Robert Eppich– Eppich Technologies; AFS Energy Coordinator Rob Lepage– bitCraft Embedded Energy Solutions.
Introduction When you choose a restaurant for a meal, are you concerned with: The price of the meal How long you have to wait to be seated The quality.
1 1 BASICS OF ENERGY MANAGEMENT Section A - Energy Basics.
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
December 1, 2003 Bill Parks Office of Electric Transmission and Distribution U.S. Department of Energy Presentation to the Federal Energy Regulatory Commission.
Heat and Power Sources for Buildings. Overview energy requirements of buildings traditional energy sources carbon emissions calcs LZC energy sources –low-carbon.
Buckeye Wood Energy Converting Waste Wood Into Energy.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Energy Efficient Steam Systems
UK enabling Legislation Renewable Energy Strategy.
Testing Combination Systems CSA P.9 The Not-So Surprising Results CMX- CIPHEX Show Toronto March 22, 2012 Rosalyn Cochrane Senior Standards Engineer Natural.
Solutions for Flaring Reduction Dual-Fuel & Gas Engines
Capacity Planning For Products and Services
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Ottawa Microturbine Application Workshop jan Return of Experience for Microturbines Running on Landfill Gas // waste water gas in Europe
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
First Solar FuelSmart™: Powering Energy Security
Investing in Energy Efficiency in your Business. Who we are What we do Resources on the back table… Contact information later…
Renewable Energy in New Zealand. Introduction NZ’s energy supply NZ’s renewable energy supply NZ’s renewable electricity supply NZ’s renewable energy.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
LONE STAR TECHNOLOGIES, INC. IPAA Annual Meeting October 25, 2005.
DIRECTION DE LA RECHERCHE Marc FLORETTE Jeudi 29 mai 2008 The advantage of mCHP as a high efficiency gas solution for the residential market Gas industry.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Installing Generation - Behind the Meter Chris Rogers Sega, Inc. November 6, KMEA Annual Conference.
Elliott Microturbines Absorption Chiller Integrated System Development
Co-generation Cogeneration is an attractive option for facilities with high electric rates and buildings that consume large amounts of hot water and electricity.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
The Potential for CHP in the Northeast Provided by the Industrial Energy Consumers Group, 1/18/07 Source: Energy and Environmental Analysis, Inc.
September 24, 2003Forester’s Co-Op Introduction and Overview of Washington Ridge Youth Conservation Camp Project - 3 year MOU & Team Building Biomass Fueled.
Over 60,000 Honda MCHP Units at work in Japan
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Final Project Renewable Energy System : Biomass Iberian Partnership for Technician Excellence, Summer 2012.
1 Microturbine CHP Application in the Hotel Business DOE Microturbine Application Workshop Embassy Suites Brea January 20, 2004.
Central PA Chapter: Association of Energy Engineers Americas Operation Services: CCHP Presentation & Tour March 26, 2015 Doug Ferguson.
A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY.
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Air Emission Benefits of CHP Air Innovations Conference August 10, 2004 Joel Bluestein Energy and Environmental Analysis, Inc. Prepared under contract.
Phoenix Convention Center Phoenix, Arizona Combined Heat & Power – The Basics Integrated Energy Combined Heat & Power (Making a Comeback) Bob Albertini.
Introduction to EMC.  Data Centre physical infrastructure specialist  Technical environment M&E.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Exquisite Heat For Steam Boilers. Time based system  Thermostat Demand Analysis over time will determine the length of burner fire time of the boiler.
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
ERGA'S HYBRID BAKU
Elliott Microturbines Absorption Chiller Integrated System Development
ENERGY SAVING Product Offering
Utility Owned Generation? (UOG)
Presentation transcript:

Presented to: DOE/CETC Ottawa 2005 Bob Bechtold Harbec Plastics, Inc. Microturbine Applications - …4 Years of Experience later… Ottawa, Canada 2005 Presented to: DOE/CETC Ottawa 2005 Bob Bechtold Harbec Plastics, Inc.

Organization Project Manager - Bob Bechtold, Harbec Plastics Funding Partners - HSBC plus 3 economic development lenders Engineer - Bruce Keeley, Energy Concepts Engineering Project Plan Vs Actual dates: Equipment Delivery- Plan 6-2000 Actual 6-2000 This was after 2 other companies failed to be able to deliver as promised and more than one year was wasted System Commissioned- Plan 7-2000 Actual 9-2000 This was because of other components in the system that were not delivered on time Monitoring Underway- Plan basic system monitoring 9-2000 Current real time monitoring and internet presentation 11-2004 Real time reporting Historical data Work in progress

Harbec CHP Schematic

Harbec CHP Website www.northerndevelopment.com

Harbec Site Photos

CHP Improvements from NYSERDA Grant

In Retrospect with 100% Hindsight We would have built the project with 15 turbines instead of 25 with expansion potential to handle future business growth. We would have purchased different brand of heat exchangers. We would not have purchased gas compressors. Initially we thought it was a mistake to put the turbines inside of the building but since we learned to control ambient heat, we generally agree that being inside has advantages in the Northern climates.

Project Cost Table in US$ Item Actual Cost Hindsight Cost 25 microturbines 30 kW each c. $800,000 c. $500,000 200/100 ton Chiller & Heat Exchangers c. $200,000 c. $250,000 Electromechanical, Engineering, Proj.Mgr. c. $100,000 c. $ 80,000 TOTALS c. $1,100,000 c. $880,000

Electrical Performance Hours of operation to December 31, 2004 541,000 total microturbine hours (=21,600/turbine avr.) Maximum hours of operation on one unit is 27,500 Average Electrical Performance 20-24% Power Delivered to Load/LHV Fuel Estimated Parasitic Losses in kW 50 kW Cooling mode 18 kW Heating mode Power Quality Report on any Power Quality Tests Done or Issues found No power quality issues when in stand alone mode Only power quality issues that exist in grid connect mode are those that come from Utility Power Source

Thermal Performance Thermal Output measured in kW(MMBtu/hr) 200,000 Btu/hr per unit per hour recovered Average water return temperatures and Delta T across HX 100* F to 200* F with 15* Delta T (new heat exchanger) 100* F to 170*F with 10* Delta T (old heat exchanger) CHP Efficiency( we suggest the use of HHV) 70% Total not recondensing Expected Peak Total System Efficiency 70% until we get associated with low grade heat user (Intensive Ag, etc. then 80 to 90 % is believed to be obtainable) (Electrical + Thermal) state which fuel heating value used Due to high gas cost we have developed price point relative to cost of gas and cost of electricity currently $7.85 per DThm. So for the last 4 months we have been thermal load following. Cooling system performance COP About 0.5 Coefficient Of Performance

Emission Performance Report on any emission testing done. Unable to test emissions and it’s not required NOx,CO, THC in ppm and gm/kWh NOx = 9 ppm .223 gm/kWh published CO = 40 ppm .603 gm/kWh “ HC = 9 ppm .078 gm/kWh “ Are emissions in line with equipment suppliers estimates? Unable to answer

O&M Performance Availability? Due to redundancy, we never have a time when our generating system is down due to equipment failure What would be the current estimate of annual O&M costs excluding (including) major hot end replacement in total annual US$ and c/kWh? 2 Year Extended Warranty is c.$65,000 total and covers all parts for all 25 turbines

Institutional Experience Due to low emissions, no EPA/DEC permits were required. We were required to use certified Mechanical Contractors and a P.E. Our electrical interconnection was simple as Capstone turbines were approved by utility, but gas connection was very difficult. Utility would only allow 20 psi. even though 55 to 60 was available. This added significantly to project cost due to need for three 10 hp gas compressors.

Supplier Support General Information that would be useful to suppliers in regard to product support: All our equipment suppliers have been reasonable and fair except for one which was our original heat exchanger manufacturer. That product has now been replaced by a superior one and we no longer deal with the original company. Adequacy of Technical Support and factory after sales support: We sent all (4) of our servicing technicians to be certified by Capstone. We have been able to provide 100% of our actual maintenance as a result with occasional phone assistance. Supply and Costs of Spare parts: We currently have an annual parts warranty which covers all microturbine parts. Warranty Issues: Our original microturbine warranty was extended to over 3 years due to unique and mutually beneficial learning opportunity.

General Experience What areas need to be improved for future installations? Better control of ambient cabinet air on indoor applications Better sealing dampers to prevent blow back of hot exhaust Single unit dispatching capability What is the opinion of the future market opportunities? We think that the microturbine offers a potential for low maintenance, reliable, environmentally friendly CHP. Experience has shown us that everything works best in Grid Connect with no load following and no Dispatching Are there any R&D or development areas that should be looked at? We think that efforts should be made to increase operating electrical efficiency and that alternatives to use waste heat better should be developed to offer customers a more complete solution. Potentials like Rankine Cycle, Hot Oil Heat Exchangers, etc. to enhance opportunities to take thermal potential to process requirements and other beneficial applications. We would also like to see efforts toward using Hythane as a minimum or full hydrogen if possible to encourage renewable energy hybrid systems as hydrogen could be an excellent energy storage medium to allow renewable energy to be dispatchable.

Future Directions and Developments

Q & A ? Thank You. Bob Bechtold bxb@harbec.com Harbec Plastics, Inc. 369 Route 104 Ontario, NY 14519 bxb@harbec.com www.harbec.com 1-888-521-4416 Fax 1-585-265-1306