NSTX Centerstack Fabrication James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.

Slides:



Advertisements
Similar presentations
NSTX-U NSTX Upgrade Project – Office of Science Review – February 4, NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade.
Advertisements

PPPL,NFRI Study of Error Field and 3D Plasma Response in KSTAR J.-K. Park 1, Y. M. Jeon 2, In collaboration with J. E. Menard 1, K. Kim 1, J. H. Kim 2,
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTXU Project Update Jim Chrzanowski, Larry Dudek, Erik Perry, Tim Stevenson, Ron Strykowsky and the Project Team October 4th, 2013 NSTX-U Supported by.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
J-W. Ahn 1 K.F. Gan 2, F. Scotti 3, R. Maingi 1, J.M. Canik 1, T.K. Gray 1, J.D. Lore 1, A.G. McLean 4, A.L. Roquemore 3, V.A. Soukhanovskii 4 and the.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX Centerstack Fabrication James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Progress Since Last Review A great deal of work and accomplishments have been achieved since the last review. –TF Conductor Sub-assembly operations are underway –Solder trials for TF conductor have been completed –Centerstack Casing fabrication is underway –Area preparation for Centerstack fabrication has been completed –Tooling fabrication and procurement is underway –OH conductor has been shipped –Outer TF Coils procurement now underway –Final Centerstack Assembly on schedule for October 2013 completion

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd General Arrangement 3 TF Flex Bus and Support Structure Centerstack Assembly Outer TF Coils Major Centerstack Components Umbrella Structure Vacuum Vessel

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd TF Conductor Assembly Major Tool and Edison Welding Institute have successfully delivered to PPPL four (4) TF conductors. The balance of the conductors for first Quadrant will be delivered by mid May. Final development of the Friction Stir Welding (FSW) procedures and the necessary NDT testing has started slowly. However these delays have now ended and production has started.

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd TF Fabrication Sequence Bars shipped to Major Tool Bars shipped back to PPPL Bars are shipped to Major Tool Bars shipped to EWI Leads extensions are FSW to conductors Bars inspected at Major Tool & preliminary machining performed FSW joints are Non Destructively TestedFinal machining of TF Assemblies

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd TF Conductor Production Videos

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd TF Solder Trials Solder Trials: –Trials have been performed with the assistance of Solder Consultant to verify materials and heating processes –Successful heat runs w/actual TF bar Materials: –Solder paste Sn /3.5 Ag w/ GMS based R flux [Glyceryl Mono-stearate, Terigitol (a detergent) and Cyclohexlamine Hydro-bromide] Solder Temperatures: –Liquidus ~221º C (430º F) –Soludus~ 246º C (475ºF) –TF solder temperature~ 270 degrees C to ensure wetting Heating Method: –Power supply w/heating plate –Torch heat to complete process Begin production soldering first week of May

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Centerstack Casing The contract for manufacturing the Inconel casing has been awarded to Martinez & Turliz in California. They have been making good progress in the manufacturing –Raw material has all been received –Main components have been rolled and welded –Flanges have been machined –Inconel forgings for the transition sections will arrive in mid May PPPL team will revisit in May Delivery scheduled

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Area Setup- TF Fabrication VPI Station

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Safety Involvement The fabrication & assembly of the Centerstack will be performed by PPPL personnel at the laboratory. Safety is an important part of the PPPL culture Safety is incorporated in all aspects of the development program- carryover to production Industrial Hygiene (IH) has participated in the planning and setup of the coil area Job Hazard Analysis (JHAs) are being developed for each procedure Procedures: Clearly identify safety precautions for specific operations Personnel protective equipment (PPEs) being used Involvement of all safety groups

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Tooling Fabrication and Procurement Inner TF Bundle- tooling –Soldering station- complete –Grit blasting station complete –Turn insulation station complete –Oven commissioned- complete –Quadrant mold- Delivery 1 st. week of May –Priming station complete –VPI station- complete –Full TF mold- Requisition in system

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Tooling Fabrication and Procurement OH Solenoid- tooling –OH copper conductor has been procured-delivery early May –OH conductor sandblasting & priming will be sub-contracted –October 2012 –Induction braze station has been procured to support OH braze joints- delivery end of May Braze qualification program scheduled for this summer –Aquapour mold fabrication- complete Trials have been scheduled for later this summer –Tension unit & taping machines are scheduled for fabrication this summer –OH Mold has been designed, but will not be procured until October 2012 –OH Winding station- winder delivered

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd OH Solenoid Winding Facility

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Mock TF Bundle with 3x Mold Segments Center Stack Immediately Before Washing Aquapour Rolled Aluminum Cylinder Represents TF Bundle Maintains true TF OD and clearance space at top and bottom Will use actual mold segments and alignment pins Will test: 1. Filling of Aquapour 2. Curing of Aquapour with heating blankets 3. Washing Out of Aquapour T ESTING OF A QUAPOUR FOR C ENTER S TACK F ABRICATION Trials will be performed this summer

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Lehman Review Recommendation dispositon log L02from October 2011 Lehman Review –Item:2.2Evaluate procuring spare key fabrication tooling ( e.g. induction heater) to reduce schedule risk from failures prior to start of fabrication. –Status: The project has procured induction braze unit- delivery end of May –Spare parts: investigated purchase of spare parts. Parts are readily available so only spare work coil procured. A total of 24 production induction brazes are needed for OH solenoid

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plans Forward for Centerstack Components Inner TF Bundle –VPI first Quadrant- July 12, 2012 –VPI Full Bundle- January 15, 2013 OH Solenoid –Begin winding OH solenoid- March 20, 2013 –VPI OH Solenoid- July 1, 2013 Centerstack Casing –Delivery is scheduled for September 2012 Outer TF Coils –Requisition has been submitted to procurement –Delivery two (2) OTF coils- December 2012

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plans Forward- continued Inner Poloidal Field Coils –Place purchase order for PF coils- October 2012 –Delivery spring/summer 2013 TF buss and support components –Place requisitions in procurement- October 2012 –> $946.0 k procurements Centerstack Assembly- –Assembly will occur between May to October 2013 –Developing Assembly procedures Deliver completed Centerstack Assembly October 2013 MT Torque-nut Flex-Bus (Cu-Cr-Zr)

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Conclusion The risks associated with the production of the TF conductors have been addressed and conductors are being delivered The soldering trials have been completed and the first conductor is ready to be soldered The TF bundle manufacturing facility has been setup and ready to begin production –Awaiting delivery of molds and completion of procedures The Inconel casing has been ordered and is on schedule The OH conductor has been shipped Tooling for the OH winding has been developed. Some has been delivered the balance will be ordered this summer The production of the Centerstack Assembly is ready to begin