Pasadena Water and Power Authorization to Enter Into a Contract with GE Packaged Power, Inc. to Design, Furnish and Deliver the Power Island Equipment.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Sequential Logic Design
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
Addition and Subtraction Equations
1 When you see… Find the zeros You think…. 2 To find the zeros...
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
2.11.
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
The basics for simulations
2013 Water Rate Study and Proposed Multi-Year Water Rate Adjustments 1.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
MM4A6c: Apply the law of sines and the law of cosines.
CENSUS DATA 1.POPULATION Total population5.437 million9.856 million Female percentage Intercensal growth percentage Growth.
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
MCQ Chapter 07.
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Name of presenter(s) or subtitle Canadian Netizens February 2004.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
& dding ubtracting ractions.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
Advanced Users Training 1 ENTERPRISE REPORTING FINANCIAL REPORTS.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
GLENARM POWER PLANT REPOWERING PROJECT WORKSHOP
Presentation transcript:

Pasadena Water and Power Authorization to Enter Into a Contract with GE Packaged Power, Inc. to Design, Furnish and Deliver the Power Island Equipment for the Glenarm Repowering Project, and an Amendment to the FY2014 Adopted CIP Budget City Council July 29, 2013

Pasadena Water and Power Background Energy IRP recommended replacement of existing Broadway 3 with equivalent size combined cycle unit by 2015 o Need dependable local generation to back up/supplement single line of import o B3 cant be depended on for too long …47 years old, spare parts problems

Pasadena Water and Power Glenarm Repowering Project - GT5 Two key contracts Power Island Equipment (PIE) 15 major power generating equipment including design, furnishing & delivery (gas turbine, steam generator, steam turbine, transformers, gas compressors, etc.) Balance of Plant (BOP) Design and construction (expected to awarded in 1Qtr/2014) 3

Pasadena Water and Power Power Island Equipment RFP issued on June 28, 2012 Six proposals received (GE and Rolls Royce GTs) GE scored highest by Staff & Consultant (POWER Engineers) Evaluation criteria included: Evaluated cost = net present value of capital cost, and 30-year lifetime plant consumable resource costs: natural gas, water and ammonia Demonstrated expertise and experience in performing similar work Bidder conformance with Citys contract terms 4

Pasadena Water and Power Bidders Evaluation 5 BIDDERS EVALUATED SCORE GAS TURBINE MFGR. GE Packaged Power, Inc., Houston, TX82.75GE Abeinsa, Inc., Chesterfield, MO80.25Rolls-Royce Abeinsa, Inc., Chesterfield, MO79.25GE Quanta, Inc., Greenwood Village, CO79GE Lauren, Inc., Abilene, TX78Rolls-Royce ESI, Farmington, CT68Rolls-Royce

Pasadena Water and Power Fiscal Impact 6 It is anticipated that $40.37MM of the total cost will be spent during fiscal year 2014, and that the remaining costs will be spent over the next two fiscal years. Total Expenditure in FY2014FY 2014 FY 2015 & FY 2016 Total Expenditure Base Contract Amount$40,370,000$20,472,000$60,842,000 Contingency (2.2% of the firm bid)$1,328,000 Total$40,370,000$21,800,000$62,170,000

Pasadena Water and Power Repowering Project Budget 7 Initial budget = $ million (2009) Revised budget = $ million Estimated debt service/year = $7.5 to 8 million Estimated rate impact on average customer (500 and1000 KWH/month usage) = $3 to $7/month

Pasadena Water and Power Reasons for Budget Change 8 Scope of Work Previous Estimate Current Estimate Difference ($) Explanation Power Island Equipment Equipment Subtotal $ 39,482,381 $ 48,303,504 $ 8,821,123Increased Scope, noise control, flexibility, emissions compliance Delivery $ 2,104,000 $ 2,525,388 $ 421,388Commensurate with equipment scope Taxes $ 3,553,414 $ 4,347,315 $ 793,901Commensurate with equipment scope Maintenance Contract, Spare Parts, Options $ - $ 5,206,655 Newer design, efficiency enhancements, lessons learned 10% Contingency $ - $ 5,358,248 Material escalation, scope, foreign exchange, overseas shipment Power Island Equipment $ 45,139,795 $ 65,741,110 $ 20,601,315 Balance of the Plant Equipment - Engineering and construction Design, Construction, Permitting $ 51,000,000 $ -Various increases and decreases, but no net change Contingency (14% / 20%) $ 7,020,000 $ 9,424,958 $ 2,404,958Increased uncertainty & risk - Glenarm site, escalation, delays Project and Construction Management $ - $ 3,325,800 Added project controls measures to assure cost/schedule/budget Engineering & Construction $ 58,020,000 $ 63,750,758 $ 5,730,758 Air Permit Fee Proposed AQMD Fee $ - $ 1,500,000 AQMD revised PR on 7/25/13 to make it effective for permits issued after 9/6/2013- proposed date for rule adoption by their Board Glenarm Building - control room and offices Control room and other offices $ 12,000,000 $ - $ (12,000,000)Removed from project due to expense Modular Building for control room/offices $ - $ 830,183 Alternative to Glenarm Building Glenarm Building - control room and offices $ 12,000,000 $ 830,183 $ (11,169,817) Total Repowering Project $ 115,159,795 $ 131,822,051 $ 16,662,256

Pasadena Water and Power Energy Cost Comparison- Fossil fuel 9 Major Assumptions: A.Variable costs for market and owned/contracted plants assumed to escalate at 5% annually B.Natural gas price in FY 2014 $4.39/mmBtu and annually C.Major assumptions for GT5 cost: 1.Debt service = $8 million/year 2.Capacity factor = 20% 3.Depreciation = 30 years Resource Name/Type Projected Energy Price by Calendar Year ($/MWh) Market Forecast (brown power) IPP (coal) Magnolia Power Project (MPP) GT5 (estimated) Not in operation

Pasadena Water and Power Recommended Actions 1.Find that the proposed contract to design, furnish and deliver the Power Island Equipment (PIE), as part of the Glenarm Repowering Project, was subject to adequate environmental review as part of the Glenarm Repowering Project Final Environmental Impact Report Findings adopted by City Council on April 8, 2013; 2.Find that the proposed contract with GE Packaged Power, Inc. (GE) is exempt from competitive bidding pursuant to City Charter Section 1002 (f), contracts for professional or unique services, and that there are no changed circumstances or new information that would trigger further environmental review; 3.Authorize the City Manager to enter into a contract with GE to design, furnish and deliver the Power Island Equipment for the Glenarm Repowering Project in an amount not to exceed $62,170,000, conditional upon receipt of South Coast Air Quality Management District (SCAQMD) permit to construct; and 4.Amend the Fiscal Year 2014 Adopted Capital Improvement Budget by appropriating $25.0 million from the unappropriated Power Fund balance to the Power Fund Capital Improvement Budget Number 3194-Local Generation Repowering Project Phase II. 10

Pasadena Water and Power Back Up Slides 11

Pasadena Water and Power Appendix – Price Comparison 12 Resource Name/Type Contract Execution Contract Energy Price 1 by Calendar Year ($/MWh) Proposed Alpine II2013--$81.50 $85.22$91.81 Silverado Solar2012-$77.34$78.50$79.68$83.32$89.76 WM Biomethane2011$ Sequent Biomethane2011$ EDF Biomethane2011$ Milford Wind2009$70.94$72.19$73.45$74.74$78.73$85.86 Ormat Geothermal Phase 22008$82.01$83.24$84.49$85.76$89.67$96.60 Chiquita Canyon LFG2006$65.25 Ormat Geothermal Phase 12005$64.77$65.74$66.73$67.73$70.83$76.30 Iberdrola Renewables2003$ Renewable Energy Contracts Price Comparison [1] Contract prices exclude costs of transmission, losses, and integration fees

Pasadena Water and Power Fiscal Impact – Cont. 13 Fiscal Impact: The cost of the Power Island Equipment Contract will be $ million. Following approval of the recommendation to authorize an additional $25.0 million in appropriations, there will be sufficient appropriations in the Power Capital Project Fund 411, Capital Improvement Program #3194 – Local Generation Repowering Project – Phase II. Funding for this action will be addressed by the use revenue bonds which will be issued later this year. Pending the issuance of the revenue bonds, funds from the unreserved Power Fund account will be used to pay for project costs based on the reimbursement resolution that was approved by the City Council for this project in January The Power Fund will be made whole upon the issuance of the revenue bonds.