NEXCOM Next Generation Air/Ground Communications Briefing Presented to

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
Next Generation Air/Ground Communications (NEXCOM)
Joint FAA/Eurocontrol Future Communications Study (FCS)
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
SATELLITE DATA LINK SYSTEM (SDLS)
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 Global Satellite CNS Program. 2 Background/status –Supplemental FY 2002 appropriation provided funding to explore secure global satellite CNS for air.
Future Communications Roadmap
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Future of Surveillance in the National Airspace System
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN Subnetwork Implementation:
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Next Generation Air/Ground Communications (NEXCOM) Program Presented to Airborne Internet Collaboration Group Reston VA April 17, 2003 Dieter Thigpen Integrated.
Data Link Communications
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
NextGen & ADS-B Presentation to Aviation Accreditation Board International (AABI) Industry/Educator Forum July 18, 2013 Kansas City, MO.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Additional aviation spectrum allocation for AM®S
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
NEXCOM Next Generation Air/Ground Communications
Presented by Thales Avionics ATN 2003 London, UK September 2003
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
International Cooperation
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
ATN/VDL Mode 2 Implementation Status
International Civil Aviation Organization
ATN Air-Ground Subnetworks
NEXCOM Next Generation Air/Ground Communications Appendix G
Workshop on preparations for ANConf/12 − ASBU methodology
Data Communications Program
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
NEXCOM by Bruce Eckstein FAA.
NEXCOM by Bruce Eckstein FAA.
Oceanic and International Operations
Oceanic and International Operations
Workshop on preparations for ANConf/12 − ASBU methodology
Oceanic and International Operations
Workshop on preparations for ANConf/12 − ASBU methodology
ATN Subnetwork Implementation:
An Airline Perspective
Joint FAA/Eurocontrol Future Communications Study (FCS)
International Civil Aviation Organization
International Civil Aviation Organization
Presentation transcript:

NEXCOM Next Generation Air/Ground Communications Briefing Presented to              Briefing Presented to AMCP Working Group “M” Montreal, Canada December 16, 2002 James T. Eck Air/Ground Communications Product Team Lead Federal Aviation Administration

NEXCOM Acquisition Program Elements Multimode Digital Radio Analog & digital Digital capability for voice and data VHF T/R RIU GNI Ground System Avionics Analog & digital System Demo Program 01010101001 NEXCOM architecture & commercial avionics

Validation & Inter-Operability Tests with Airborne Avionics NEXCOM Schedule 2001 2002 2003 2004 2005 2006 2007 2008 2009 System Demo Program 10/02 System Demo I 10/03 System Demo II 10/04 Operational Demo Multimode Digital Radio MDR deployment 8-12/02 Ops Testing 7/01 Contract Award 5/03 Begin Deployment 07-12 Implementation Ground System Validation & Inter-Operability Tests with Airborne Avionics 1/05 Full Scale Dev Contract Award 11/02 RPDE Source Selection 10/01 Sys Reqs Doc 10/07 Keysite 10/02 Strawman Characteristics Complete 12/09 Operational 8/03 Notice of Availability TSO 9/03 AEEC Apprvd Char. Avionics 8/03 Notice of Availability TSO 9/03 AEEC Approved Char. 8/04 Certified Aircraft 10/01 MOPS 12/01 GIAs 6/05-12/09 Aircraft equip Rule Making 6/03 Begin Formal Internal Coordination 1/04 NPRM 6/04 Initiate Final Rule 6/05 Rule Published

National Airspace System Transition to Digital Communications Analog Voice, 25 KHz Initial Datalink (VDL-2) Full Operational Evaluation & Exercise of Digital Voice and Datalink (VDL-3) Next 5 years 5-10 years Maintain Terminal Analog Voice Implement VDL-3 Digital Voice Expand Datalink VDL-2 Applications 10-15 years Expand Enroute Digital Voice (VDL-3) Initiate Terminal Digital Voice (VDL-3) Increase Datalink Capacity & Capability (VDL-2 & VDL-3) 15-20 years Expand Digital Voice (VDL-3) to all domains Expand Datalink Capacity in all domains and all applications (VDL-2 & VDL-3) Enroute High Airspace Dem/Val VDL-3 Link 0101010100110010101 0101010100110010101 0101010100110010101 01010101001 VDL-2 Datalink 0101 01010101001 RCAG 10011001011010101 Analog Voice ARTCC 01010 National Airspace AFSS Terminal Airspace

NAS Data Link Transition FAA views VDL Mode 2 and VDL Mode 3 as complementary, not competing technologies CPDLC initially will be fielded on VDL-2 Only viable technology in required time (2005-2006) Stepping stone for data link use in air traffic control FAA pays ATC message charges CPDLC available on VDL-3 in 2012 Potential for other applications (e.g. weather) on VDL-3 Datalink applications still available to VDL-2 service providers Users would pay any associated message charges VDL-2 remains essential for the purpose it was developed AOC and other air traffic management functions FAA does not plan to provide AOC-type information on VDL-3

International Harmonization FAA strongly supports the 1995 ICAO COM/OPS/DIV decision for digital, TDMA-based voice and data link as the future air/ground communications technology