DMAIC Analyze, Improve, Control

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project leaders will keep track of team progress using an A3 Report.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
 Individually  Given your sample of M&Ms, build a Pareto diagram by color  Before you destroy the evidence, be sure you have an accurate count.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
What is Business Analysis Planning & Monitoring?
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
TTMG 5103 Module Techniques and Tools for problem diagnosis and improvement prior to commercialization Shiva Biradar TIM Program, Carleton University.
Welcome to Lean Six Sigma Green Belt Training
Analyze Opportunity Part 1
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
DMAIC: Control Robert Setaputra. Objective Maintain the changes made in the X’s in order to sustain the improvements in the Y’s.
An Agile Requirements Approach 1. Step 1: Get Organized  Meet with your team and agree on the basic software processes you will employ.  Decide how.
Failure Mode & Effect Analysis FMEA Lecture 11. What is FMEA? Failure mode and effect analysis is an Advanced Quality Planning tool that: examines potential.
Failure Modes and Effects Analysis (FMEA)
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
March 16, 2016 CanadianClinicalDiagnostics.com ©Canadian Clinical Diagnostics.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
Six Sigma Greenbelt Training
Continuous Improvement Project (A Guideline For Sponsors)
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template
The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Continuous Improvement Projects
Project Management BBA & MBA
Control Phase Wrap Up and Action Items
CHAPTER11 Project Risk Management
Improvement Selection:
Failure mode and effect analysis
Eight principles of quality management.
Practical Assessment Project Template
Description of Revision
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
CMMI – Staged Representation
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Framework for Success: DMAIC
Certification Project Template
Analyze Fishbone Diagram
GE 6757 TOTAL QUALITY MANAGEMENT
Software Project Management (SPM)
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
Tools for Implementation
Certification Resources Workbook
Failure Mode and Effect Analysis
Tools for Implementation
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
Managing Project Work, Scope, Schedules, and Cost
{Project Name} Organizational Chart, Roles and Responsibilities
PFMEA Summary Process Steps
QMS, ISO and Six Sigma It’s all related…..
Presentation transcript:

DMAIC Analyze, Improve, Control 6 DMAIC Analyze, Improve, Control GEOP 4316

Analyze The third phase of the DMAIC process Identify types and relevance of problems Identify and classify casues Many tools to perform root cause analysis Based on the results obtained in the measure phase Note DMAIC is not a purely linear approach Define items/elements are revised during the measure and analyze phases Measure items/elements are part of the define and analyze phases

Analyze SIPOC: Suppliers- Inputs-Process-Outputs-Customers S: Sources of materials and information I:The materials and information P: Main steps to create the Output O: Product or Service C: Who wants/uses the product suppliers inputs process outputs customers metrics Supplier 1 Supplier 2 Output 1 Output 2 Output 3 Customer 1 Customer 2 Input 1 Input 2 Input 3 metric 1 metric 2 Step 1 Step 2 Step 3 Step 4

Analyze Cause and Effect Matrix Use to relate two sets of information for example: a) inputs to process, b) process to outputs, c) outputs to customer requirements. Process Assy Cost Part Rel. Rework Transp. Cost Base Assy H L -- Electronic Assy Seal & Epoxy Test and Verify Packaging

Analyze Failure Modes Effect Analysis (FMEA) What can fail? What is the probability? Can we know the failure is about to occur? When do we know? What is the effect? In a process or product the following must be identified. Possible failures Probability of the failure (codes for likelihood) Impact of the failure (codes for severity) Likelihood of detection [causes that lead to the failure] (codes for higher likelihood) RISK PRIORITY NUMBER : Pr x Im x Det http://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis

Analyze FMEA Prioritize high probability, high impact, highly detectable failures, then: Reduce probability Mitigate impact Plans for quick reaction when causes detected For failures, also quantify potential impacts ($ lost, customers lost, cost of rework) Consider “Worst case scenarios” For non-detectable but high impact, high risk – work on how to detect

Analyze Multiple other tools Design of Experiments Multiple X’s Cannot do all possible tests. Develop a testing process to understand the relationships. Discrete event simulation Process model of a system that includes variability.

Improve This phase deals with developing a solution to the problem in order to reduce variability and meet desired targets. Could include evaluation investments in technology, training or human resources. This involves brainstorming potential solutions, selection solutions to test and evaluating the results of the implemented solutions. Often a pilot implementation is conducted prior to a full-scale rollout of improvements. http://www.brighthub.com/office/project-management/ articles/25328.aspx#ixzz1SJD0JIfJ

Improve Brainstorming ideas Important to include the people who are involved in performing the process. A variety of techniques are used to brainstorm potential solutions to counter the root cause(s) identified in Analyze. Encouraging participants to challenge rules and assumptions, ban excuses and think like small children can be very effective. Ideas should not be eliminated prematurely. Even an outlandish idea that couldn't possibly be implemented as first suggested may lead to a related idea that is an ideal solution.

Improve Selection of solution Good idea to involve the people who work on the process that is being improved, be included in the decisions regarding which potential improvements to implement. Need to establish criteria for evaluating the proposed improvements in an objective manner. Criteria usually include time line for implementation, financial cost, the extent to which root causes are likely to be countered and the overall ease of implementation.

Improve Selection of solution Weights should be assigned to each criterion prior to evaluating the proposed solutions. Tools to assist with the evaluation include a priority matrix and a Pugh matrix, both of which use basic calculations and ratings to compare the solutions against each other or against a standard. Computer simulation can be beneficial in the evaluation process. Weight Alt 1 Alt 2 Alt 3 Time to develop 8 - 1 (long) + 2 (short) Improvement in value 4 + 2 (high) + 1 Investment level 3 - 1 (significant $) Add New Customers 6 + 2 + 4 (many!) - 1 score 12 21 14

Control The primary objective of the DMAIC Control phase is to ensure that the gains obtained during Improve are maintained long after the project has ended. Focus is to standardize and document procedures, make sure all employees are trained and communicate the project’s results. The project team needs to create a plan for ongoing monitoring of the process and for reacting to any problems that arise. http://www.brighthub.com/office/project-management/articles/27134.aspx#ixzz1SJGhPqDW

Control Review and update process maps. Development of a user guide which spells out the steps of the process and provides rationale. Establish a plan to monitor the new process and act when results are not up to spec, so that the project gains will be maintained. Monitoring plan specifies the metrics that will be tracked to summarize process performance, as well as specifying how and how often they will be tracked.

Control The metrics to be monitored will be directly related to the Critical To Quality (CTQ) measures determined during the Define phase The monitoring plan also indicates what constitutes satisfactory performance and what should be considered a red flag indicating possible problems. Monitoring plan must assign responsibilities. Control charts are used by the process owner. To watch for process shifts or other signs that there may be a problem with process performance.