The IFR Online Detector Control at the BaBar experiment at SLAC

Slides:



Advertisements
Similar presentations
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
Advertisements

RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Creation Of Control Systems In PVSS For Devices In The ALICE Detector A Large Ion Collider Experiment A dedicated heavy-ion detector at LHC (Large Hadron.
2/10/2000 CHEP2000 Padova Italy The BaBar Online Databases George Zioulas SLAC For the BaBar Computing Group.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
LV and HV status of the RPC system RPC detector and trigger group.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Software Design of Electronics Tests and Data Acquisition for a New Gas Detector ZHAO Dongxu 1, 2 ZHANG Hongyu 2 YUE Xiaobo 1 ZHAO Yubin 2 CHEN Yuanbo.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
BaBar Transition: Computing/Monitoring
Paolo Branchini INFN RomaTre on behalf of the KLOE2 collaboration
The Totem trigger architecture The LONEG firmware archtecture
HADES collaboration meeting XXIII GSI, Darmstadt
CLAS12 DAQ/Trigger/Online Status
DAQ for ATLAS SCT macro-assembly
ATLAS MDT HV – LV Detector Control System (DCS)
Commissioning of the ALICE HLT, TPC and PHOS systems
Magnet Safety System for NA61/Shine
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
The Online Detector Control at the BaBar experiment at SLAC
Pierluigi Paolucci - I.N.F.N. Naples
The LHCb Run Control System
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
BESIII EMC electronics
RPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC Detector Control System
EPICS: Experimental Physics and Industrial Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

The IFR Online Detector Control at the BaBar experiment at SLAC Pierluigi Paolucci Stanford Linear Accelerator Center and I.N.F.N. of Naples 21 November 2018 Pigi Paolucci

Summary Introduction; Software: IFR description; System Overview; Hardware: System Overview; Single Rate; Analog readout; Wiener Crate. Software: System Overview; EPICS; State Machine; Component Proxy; Data Analysis; Conclusions. 21 November 2018 Pigi Paolucci

Introduction I BaBar is a B-factory experiment on the PEP II accelerator at the Stanford Linear Accelerator Center; The goal of this detector is to search for and study possible CP violation in the decay of the B meson; Such studies will require both high statistics and good control of systematics Stable and continuos operation under well-controlled conditions Online Detector Control plays an important role. 21 November 2018 Pigi Paolucci

Introduction II BaBar consists of 5 sub-detectors: Silicon Vertex Tracker; Drift Chamber; Detector of Internally Reflected Cherenkov ; ElectroMagnetic Calorimeter; Instrumented Flux Return. m detection and neutral hadron identification 21 November 2018 Pigi Paolucci

Introduction III The Instrumented Flux Return consists of: 342 RPC chambers in the Barrel region; 432 RPC chambers in the Endcap region; 80 High voltage channels; about 3000 front-end electronic cards; 48 low voltage power supplies; 8 DAQ crates; 21 November 2018 Pigi Paolucci

ODC hardware schema RPC: Single Rate, Dark Current and Gas system. Front-end: Low Voltage and Single Rate. Detector: Trigger, Temperature and DAQ crate. ODC hardware schema 21 November 2018 Pigi Paolucci

IFR Online Detector Control Overview Control and Monitor: hardware software High Voltage 80 800 Low Voltage 48 96 DAQ crate 8 400 Monitor: Single Counting Rate 1608 1608 Dark Current 804 1004 “Iron” Temperature 96 96 Gas system; 32 32 Trigger 16 16 TOTAL 2692 4052 21 November 2018 Pigi Paolucci

Detector Control DAQ system I Master VME crate placed in the electronic room with: CPU MVME 177; HV controller; 2 “CAN-bus” boards; 6 VME Scalers; 3 Gate Generators; 5 Interlock boards. 21 November 2018 Pigi Paolucci

Detector Control DAQ system II 8 Slave custom crate placed on the detector 8 digital multiplxers: 32 ECL input channels; Reset and Clock (NIM); 2 ECL/NIM output signals; 8 analog boards(CAN-bus); 1 controller: opto-coupled DMUX input and output signals. 21 November 2018 Pigi Paolucci

Single Counting Rate The 1608 fast-OR signals, generated by the front-end cards connected to the longitudinal strips, are used to monitor the Single Counting Rate of each RPC chamber. A digital multiplexer with 32 ECL input channels is used in order to reduce the number of channels to acquire. Using 8 Slave Crates 64 DMUXs 2048 channels the whole RPC system is monitored with 4 scaler boards. 21 November 2018 Pigi Paolucci

More hardware subsystems The Slave crate contains also 8 General Monitor Boards used in BaBar to monitor analog information: RPC dark current, low voltage and temperature The HV system consists of 5 CAEN SY127 mainframes. Each HV channel is split in 36 using an HV box placed on the detector. This box provides also 36 analog signals proportional to the RPC dark current. 21 November 2018 Pigi Paolucci

Slave Crate HV system Detector Electronic house Fast-OR signals Analog signals CaenNET CAN-bus Electronic house 21 November 2018 Pigi Paolucci

21 November 2018 Pigi Paolucci

Software Overview (EPICS) The BaBar/IFR Online Detector Control use VxWorks and EPICS to implement slow control data flow and to develop part of the readout module. 21 November 2018 Pigi Paolucci

EPICS structure IFR software package has been developed starting from the EPICS database: 2600 hardware records + 1400 software records used to summarize the results and the status of each IFR subsystem/sector. Each record contains information as: scan period, alarm limit, alarm severity Hardware units, precision, conversion, link Software alarm/database/monitor dead-bands EPICS tools All the EPICS tools have access to the records. 21 November 2018 Pigi Paolucci

Software Overview (EPICS) Some EPICS tools are used in the BaBar experiment as the Alarm Handler. It display the Alarm Status of all the EPICS records, organized in “logical” threes. 21 November 2018 Pigi Paolucci

Component Proxy Is a special software layer above EPICS structure; It fill the gap between EPICS and the BaBar Online; It also bridges the semantic gap between the C-language EPICS part and the Object-Oriented-C++ parts (Run Control, Archiving and Analysis. 21 November 2018 Pigi Paolucci

EPICS is interfaced with the BaBar Run Control through the Component Proxy and with the BaBar Database through the Archiver and KeyLookup processes. Java is used to analyze the data retrieved from the db and to produce a set of histograms used during the data tacking. 21 November 2018 Pigi Paolucci

BaBar Alarm Structure Each EPICS channel has 2 alarm limits: The first one is just a warning (color code is yellow); The second one is a real alarm (color code is red). The alarms are sent from the EPICS database to the EPICS Screen, Alarm Handler, Java Browser and Database. 21 November 2018 Pigi Paolucci

Single Rate Monitor EPICS Proxy database ntupla 21 November 2018 Pigi Paolucci

IFR State Machine BaBar has 3 different operating States, runnable, injectable and calibration corresponding at different hardware/software configuration of each subsystem. An EPICS State Machine (sequencer) receives the State key from the Run Control and set the IFR configuration (HV, LV and DAQ). It can work in Local mode (from the IFR console) or in Global mode (from the PEPII or BaBar console). It calculates also the status of each IFR hardware subsystems. 21 November 2018 Pigi Paolucci

IFR Console 21 November 2018 Pigi Paolucci

Wiener Crate Monitor 21 November 2018 Pigi Paolucci

HV Console 21 November 2018 Pigi Paolucci

Conclusions The IFR Detector Control is working since January 1999. The data collected up to now have been used to study the performances of the detector during the Cosmic Run and to monitor it during the Data tacking. All the ODC information are stored into the BaBar database permitting to use the detector conditions in the offline analysis. EPICS proved to be a very powerful, reliable and friendly system to control and monitor both BaBar and PEP II. 21 November 2018 Pigi Paolucci