ISO 17078 Task Group Update Wayne Mabry.

Slides:



Advertisements
Similar presentations
Update on ISO Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group
Advertisements

SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
ISO Process Summary for SEDRIS Dick Puk ISO/IEC SC24 SEDRIS Editor WG8 Meeting, October 1, 1999 ISO/IEC JTC1/SC24/WG8 N4.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Vote Center Regional Meeting April Today’s Discussion 1.Why vote centers 2.How to become a vote center county 3.Vote Center Clerk experiences 4.Questions.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
Provenance and Context Content Standard (Emerging) – Status of Activities H. K. Ramapriyan Science Systems and Applications, Inc. & ESDIS Project, Code.
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
UtilityAMI HAN Task Force Erich W. Gunther – Chairman Jan 25, 2008 – Tampa, FL.
Meeting No.LocationDateHostGeneral Topics to be Addressed 1Houston02/05/98CamcoOrganize ISO Gas-Lift Committee 2Houston05/04/98CamcoDraft Outline for ISO.
1. 2 TX SET Version Release Schedule RMS Assignment /Action Item Form Discussion Topic.
In-session workshop on safety standards Vienna, 19 July 2016 Page 1 /13.
Changes and Challenges of 52.2 and ISO Update
Informal document GRE-77-21
Task Group API 19SS Sand Screens
TG 1 March Session Closing Report
ISO/IEC Software Testing
ISO TC 108 SC3 Liaison to CCAUV
Updates from SC18 Summer Meeting
WG Technical Editor’s Report
Status Report November 2007
Submission Title: Sydney e/ Liaison Report.
P802.11s report to EC on request for approval to proceed to RevCom
ISO Gas-Lift Work Task Session Fall 2003 Gas-Lift Workshop
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
P802.11n report to EC on request for approval to proceed to RevCom
P802.11n report to EC on request for approval to proceed to RevCom
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
Submission Title: [WG-TG3 Opening Report May03]
Status Update on API 16Q / 16R / 16F
ISO TC64/SC4/WG2 June 2010 status
TGaf Waikoloa Closing Report
TC Process Specification Flow
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
ISO TC67/SC4 Annual Meeting
Utility Meters Working Group
API SC 10, Work Group 3 Update:
WG Technical Editor’s Report
API 17H TASK GROUP January 15, 2013.
Standards Break Out Session
Task Group G Report March 10, 2003
Presented to the CEOS WGISS October 22, 2018
ISO TC67/SC4 Annual Meeting
January 2010 Joint 11/19/22 TVWS Meeting
WS-RX TC Process for Specification Development
WS-RX TC Process for Specification Development
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
Motion – P Rev/D2 to Sponsor Ballot
802.16m Opening (Final) Report
Submission Title: [WG-TG3 Closing Report Nov02]
GUIDANCE ON PLANNING PROCESS GUIDANCE ON PLANNING PROCESS
ISO TC67/SC4 Annual Meeting
Specification on float equipment
Gas Lift Workshop – 2003 ISO Update
TGaf Waikoloa Closing Report
Submission Title: [WG-TG3 Opening Report Nov02]
WG Technical Editor’s Report
November 2018 Opening Report
Action points Who When WG GES 31 March March 2017
Motion – P Rev/D2 to Sponsor Ballot
Task Group G Report January 17, 2003
DRAFT ISO 10015:20XX Revision Overview Quality management - Guidelines for competence management and people development ISO/TC176 TG 01.
DRAFT ISO Revision Overview Quality management systems — Guidelines for the application of ISO 9001 in local government ISO/TC176 TG 01.
Mesh Study Group (MES SG) Report IEEE , Jan 12-16, 2004
TGg Report to the IEEE Working Group
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP June 26, 2013.
Presented to the CEOS WGISS October 10, 2019
Presentation transcript:

ISO 17078 Task Group Update Wayne Mabry

Introduction Comparison of ISO to API gas lift standards Status of ISO standard in process 2 wjm

Comparison of ISO to API 3 wjm

Status of ISO 17078.1 17078.1 (mandrels) Released to FDIS (Final draft international standard) Must incorporate editorial changes from work group 4. Projected completion March 2004 Send out for up or down vote by member nations. If approved, standard available in 1 to 1-1/2 years. 4 wjm

Status of ISO 17078.2 17078.2 (flow control devices) Released to CD (Committee draft) Incorporate editorial changes from work group 4. Projected completion March 2004 Review by work group 4 Incorporate wg4 comments 5 wjm

Status of ISO 17078.2 (continued) 17078.2 (flow control devices) Release to DIS (draft international standard) Send out for comments Review and incorporate comments Released to FDIS (Final draft international standard) Send out for up or down vote by member nations. If approved, standard available in 2 to 2-1/2 years. 6 wjm

Status of ISO 17078.3 and 17078.4 17078.3 (down hole equipment) Working document (WD) Work just beginning (est completion – 2-1/2 to 3 years) 17078.4 (reconditioning and other topics) Work just beginning (est completion – 3 to 3-1/2 years) 7 wjm