LB8 Summary Report LB8 opened 9Feb01 12am EST, closed11Mar01 12am EST.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /124r0 Submission November 1999 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks Liaison.
Advertisements

Doc.: IEEE Submission November 2004 Robert F. HeileSlide 1 Forward P REVa-D6 to RevCom Robert F. Heile Chair
Doc.: IEEE /xxxr0 Submission November 2000 Ian Gifford, M/A-COM, Inc.Slide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Project: IEEE Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [eWEEK Bluetooth™ eSeminar, 9Nov00] Date Submitted: [6Nov00]
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /012r3 Submission January 2000 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Doc.: IEEE /119r0 Submission May 2000 Ian Gifford, M/A-COM, Inc.Slide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /177r0 Submission January 2000 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Doc.: IEEE /094r0 Submission March 2002 Ian Gifford, ConsultantSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Bluetooth™-IEEE Working Group and IEEE P Working Group for WPANs Liaison Meeting Ian Gifford P Vice Chairman December 8, 1999.
Doc.: IEEE /037r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /224r3 Submission May 2001 Tom Siep, TMS ConsultantsSlide 1 TG3 Review Procedure Proposal NOTE: All of these recommendations do not.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /462r1 Submission May 2001 Ian Gifford, ConsultantSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /132r0 Submission November 1999 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Project: IEEE Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 1 Closing Report for Session #12/Orlando]
IEEE Working Group for Wireless Personal Area Networks™
IEEE Working Group for Wireless Personal Area Networks™
IEEE Working Group for Wireless Personal Area Networks™
IEEE Working Group for Wireless Personal Area Networks™
IEEE Working Group for Wireless Personal Area Networks™
IEEE Working Group for Wireless Personal Area Networks™
Submission Title: [Task Group 1 Opening Report]
Submission Title: [Task Group 1 Opening Report]
IEEE P Working Group for Wireless Personal Area Networks
IEEE P Motions at the July Plenary EC Meeting
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE White Space Radio Status Report
July 2001 doc.: IEEE /365r1 July 2001 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WPAN.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d Vancouver March 2017 Closing Plenary.
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Working Group for Wireless Personal Area Networks
Motion IEEE Standards withdrawals to RevCom
d 100G to Sponsor Ballot (unconditional)
Hilton Hotel, Sonoma County
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Working Group for Wireless Personal Area Networks
Nov 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, Nov.
Task Group G Report March 10, 2003
IEEE Motions at the November Plenary EC Meeting
Motion IEEE Standards withdrawals to RevCom
Submission Title: [TG1 Working Agenda] Date Submitted: [6Mar00]
TG3 Review Procedure Proposal
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group,
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Closing IEEE 802 EC Friday 15th March 2019
IEEE P Working Group for Wireless Personal Area Networks
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Closing IEEE 802 EC Friday 15th March 2019
IEEE Working Group for Wireless Personal Area Networks (WPAN™)
IEEE MEDIA INDEPENDENT HANDOVER
IEEE P Working Group for Wireless Personal Area Networks
IEEE P Working Group for Wireless Personal Area Networks
IEEE Working Group for Wireless Personal Area Networks (WPAN™)
doc.: IEEE <doc#>
IEEE P Working Group for Wireless Personal Area Networks
IEEE P Working Group for Wireless Personal Area Networks
Submission Title: [Task Group 1 Report] Date Submitted: [8May00]
IEEE P Wireless RANs Date:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
IEEE P Motions at the July Plenary EC Meeting
Submission Title: [Task Group 1 Report] Date Submitted: [6Mar00]
IEEE MEDIA INDEPENDENT HANDOVER
IEEE P Wireless Personal Area Network
IEEE P Motions at the July Plenary EC Meeting
July 2014 doc.: IEEE /21/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
P802.11j Sponsor Ballot Procedure 10
Motion IEEE Standards withdrawals to RevCom
Nov 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, Nov.
Presentation transcript:

LB8 Summary Report LB8 opened 9Feb01 12am EST, closed11Mar01 12am EST. March 2001 doc.: IEEE 802.15-01/xxxr0 March 2001 LB8 Summary Report LB8 opened 9Feb01 12am EST, closed11Mar01 12am EST. Motion: To submit the contents of document IEEE P802.15.1/D0.8.0 to Sponsor Ballot LB8 Summary There were 74 Voting members. 51 submitted their vote. The return ratio is 51/74 = 69 % (50 % is required) and the abstention rate was less than 30% of those voting. The ballot is valid. 23 failed to vote. Motion passed with 46/4/1 or 92 %. VERBAL CONFIRMATION – 2 (Kinney/Watanabe) of the 4 No’s will be changed to Yes. Likely, that a third (Ling) will too. The remaining no Voter has 37 rejected comments. We will continue the resolution and editing of the IEEE Draft P802.15.1/D0.9.0 in March and early April to maximize consensus. The official opening date of the re-circulation ballot is April 9, 2001. Robert F. Heile/Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

LB8 Summary Report (cont.) March 2001 LB8 Summary Report (cont.) Comment Status/Response Status Next Steps Accepted/Closed (AC): 183 Distribute report -01/117r8 from the LB8 Ballot Review Committee. Accepted/Open (AO): 135 Apply edits and then distribute report from the LB8 Ballot Review Committee. Rejected/Closed (RC): 51 Submit decline letters; request possible withdrawal of the objection via an affirmation or change the objection to an abstention. Accepted/Unsatisfied (AU): 8 Submit Bluetooth Errata; request and follow up response. Total Comments 377 Source: -01/117r8 Robert F. Heile/Ian Gifford, M/A-COM, Inc.

March 2001 doc.: IEEE 802.15-01/xxxr0 March 2001 Motion to the 802 SEC Move that the ExCom forward IEEE Draft 802.15.1/D1.0 to Sponsor ballot, based on a successful completion of a WG re-circulation ballot. Conditional approval to expire at the beginning of the Portland Plenary Meeting Non Technical 50% (Procedural) Moved: Bob Heile Second: Stuart J. Kerry Y/N/A: 11/0/0 Again, there were a total of 412 comments and we believe that 122 are directly related to Bluetooth's Specifications. 3 kinds of comments: 53 Yellow = Technical [these are important e.g., technical peer review commentary and IEEE P802.15 would like the Bluetooth SIG to review and advise on their ability to include these into the errata process to be considered for inclusion to the v1.0B Bluetooth Specification?] 26 White = Protocol Implementation Conformance Statement (PICS) [these are important but relate to separate Bluetooth documents and *not* the Core & Profiles Specifications. I believe that the following BSIG Promoter/IEEE 802.15 Members Dr. Fujio Watanabe <fwatanabe@ieee.org> and Mr. Arto Palin <arto.palin@nokia.com> are dealing directly with these comments in terms of the Bluetooth Test Specifications.] 43 Blue = Editorial [these are less important e.g., grammar, typo's, etc. but should be considered in the errata process too.] Note: They are provided sequentially in these colors on the Worksheet. Note: The conditional approval expires at the opening of the next plenary; 9Jul01. Robert F. Heile/Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

March 2001 Robert F. Heile/Ian Gifford, M/A-COM, Inc.

Motion to the 802.15 Working Group March 2001 doc.: IEEE 802.15-01/xxxr0 March 2001 Motion to the 802.15 Working Group I move that the 802.15 WG Chair seek ExCom approval for forwarding IEEE Draft 802.15.1/D1.0 to LMSC letter ballot, based on a successful completion of a WG re-circulation ballot. Non Technical 50% (Procedural) Moved: Ian Gifford Second: Tom Siep Y/N/A: 18/4/11, Passed Again, there were a total of 412 comments and we believe that 122 are directly related to Bluetooth's Specifications. 3 kinds of comments: 53 Yellow = Technical [these are important e.g., technical peer review commentary and IEEE P802.15 would like the Bluetooth SIG to review and advise on their ability to include these into the errata process to be considered for inclusion to the v1.0B Bluetooth Specification?] 26 White = Protocol Implementation Conformance Statement (PICS) [these are important but relate to separate Bluetooth documents and *not* the Core & Profiles Specifications. I believe that the following BSIG Promoter/IEEE 802.15 Members Dr. Fujio Watanabe <fwatanabe@ieee.org> and Mr. Arto Palin <arto.palin@nokia.com> are dealing directly with these comments in terms of the Bluetooth Test Specifications.] 43 Blue = Editorial [these are less important e.g., grammar, typo's, etc. but should be considered in the errata process too.] Note: They are provided sequentially in these colors on the Worksheet. Note: The conditional approval expires at the opening of the next plenary; 9Jul01. Robert F. Heile/Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

LB8 Summary Report (cont.) March 2001 LB8 Summary Report (cont.) Draft: 802.15.1 Std D0.8.0/resolution approval; Date Closed: 11Mar01 Ballots Sent 74 Ballots Returned: Affirmatives 46 Negatives 4 Abstentions 1 Total 51 No Response 23 Total Ballots 74 Percent Returned (46 + 4 + 1) / 74 = 69 % Percent Affirmative 46 / (46 + 4) = 92 % Percent Abstentions 1 / 51 = 2 % Robert F. Heile/Ian Gifford, M/A-COM, Inc.

Comment Status Comment Status Response Status X/received March 2001 Comment Status Comment Status X/received D/dispatched for consideration A/accepted R/rejected Response Status O/open W/written C/closed U/unstatisfied Z/withdrawn Robert F. Heile/Ian Gifford, M/A-COM, Inc.

LB8 Summary Report (cont.) March 2001 LB8 Summary Report (cont.) Robert F. Heile/Ian Gifford, M/A-COM, Inc.

LB8 Summary Report (cont.) March 2001 LB8 Summary Report (cont.) Robert F. Heile/Ian Gifford, M/A-COM, Inc.

LB8 Summary Report (cont.) March 2001 LB8 Summary Report (cont.) Robert F. Heile/Ian Gifford, M/A-COM, Inc.

LB8 Summary Report (cont.) March 2001 LB8 Summary Report (cont.) The LB8 Ballot Resolution Group Deemed unassigned Comment Types As “e” Robert F. Heile/Ian Gifford, M/A-COM, Inc.

WG Motion Overview Motion #1 – TG1 Motion #2 – WG Y/N/A: 4/0/0, PASSED March 2001 WG Motion Overview Motion #1 – TG1 Y/N/A: 4/0/0, PASSED Motion #2 – WG Y/N/A: 18/4/11, PASSED Robert F. Heile/Ian Gifford, M/A-COM, Inc.

Motion to the 802.15.1 Task Group March 2001 doc.: IEEE 802.15-01/xxxr0 March 2001 Motion to the 802.15.1 Task Group I move that the 802.15.1 TG1 approve the submission of a motion to the WG to request that the WG Chair seek ExCom approval for forwarding IEEE Draft 802.15.1/D1.0 to LMSC letter ballot, based on a successful completion of a WG re-circulation ballot. Non Technical 50% (Procedural) Moved: Tom Siep Second: Michael Camp Y/N/A: 4/0/0, PASSED Again, there were a total of 412 comments and we believe that 122 are directly related to Bluetooth's Specifications. 3 kinds of comments: 53 Yellow = Technical [these are important e.g., technical peer review commentary and IEEE P802.15 would like the Bluetooth SIG to review and advise on their ability to include these into the errata process to be considered for inclusion to the v1.0B Bluetooth Specification?] 26 White = Protocol Implementation Conformance Statement (PICS) [these are important but relate to separate Bluetooth documents and *not* the Core & Profiles Specifications. I believe that the following BSIG Promoter/IEEE 802.15 Members Dr. Fujio Watanabe <fwatanabe@ieee.org> and Mr. Arto Palin <arto.palin@nokia.com> are dealing directly with these comments in terms of the Bluetooth Test Specifications.] 43 Blue = Editorial [these are less important e.g., grammar, typo's, etc. but should be considered in the errata process too.] Note: They are provided sequentially in these colors on the Worksheet. Note: The conditional approval expires at the opening of the next plenary; 9Jul01. Robert F. Heile/Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

IEEE 802.15.1 Current Project Planning March 2001 IEEE 802.15.1 Current Project Planning Jul99 Initial Discussion on Proposals. Nov99 Initial draft ready for WG ballot. Jan00 First Ballot complete, second ballot kicked off. Mar01 Draft ready for IEEE sponsor ballot. Jul01 Sep01 Approval by IEEE Standards Board Nov01 Dec01 802.15.1 Project Target 802 Sponsor Expectation Robert F. Heile/Ian Gifford, M/A-COM, Inc.

Current Draft - Actual AU (8) 802.15.1/ D0.9.1 LB(9) 9Apr01 -01/117r8 March 2001 Current Draft - Actual AU (8) 802.15.1/ D0.9.1 LB(9) 9Apr01 -01/117r8 + SDL It took awhile for the TG1 to synchronize the IEEE editing phase with the BSIG derivative source editing phase. Today we are in synch. This issue will need to be monitored going forward. Robert F. Heile/Ian Gifford, M/A-COM, Inc.

Current Draft - Planning March 2001 doc.: IEEE 802.15-01/xxxr0 March 2001 Current Draft - Planning Approval by StB Today 1999 2000 2001 LB1/D0.6 LB3/D0.7.2 LB8 D8.0 IEEE 802.15 WG Balloting LB2 LB6 LB (9) -99/173r5a -00/159r16 -01/117r8 IEEE Sponsor Balloting SB (1) D1.00 SB (2) D1.01 SB (3) D1.02 D1.1= BT v1.1 Jul99 Jan00 Jul00 Sep01 Jan01 Jul01 Sep01 Jan02 The IEEE Std 802.15.1/D1.1, 2001 Edition will be derived from BT v1.1;  D1.1 = BT v1.1 Robert F. Heile/Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

Current Ballot Planning March 2001 doc.: IEEE 802.15-01/xxxr0 March 2001 You are here Current Ballot Planning + Rev 1.0 B spec - FM Source 3Dec99 + Rev 1.1 spec - FM Source ~22Feb01 + Rev 1.x specs 2000 2001 ? Copyright Addendum Signed J F M A M J J A S O N D J F M A M J J A S O N D + LB3 Failed -24May00 – 6Nov00 + SB(1) -16Apr – 27May Draft Deadline 3Aug01 Draft Deadline 26Oct01 + LB6 Passed -01Dec – 15Dec00 + SB(2) -11Jun – 26Jun + SB(3) Optional -9Jul – 25Jul + LB(8) D0.8.0 -9Feb01 – 11Mar StB 11-13Sep01 Working Group Sponsor StB 4-6Dec01 BSIG-IEEE have been discussing how IEEE would maintain a spec after accreditation. (This may determine whether the IEEE should accredit BT 1.1 or a more stable version) Robert F. Heile/Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.