SELECT COMMITTEE ON PUBLIC SERVICE: REPORT ON QUALITY SANITATION TO HOUSEHOLDS PROGRESS REPORT ON THE RURAL HOUSEHOLD INFRASTRUCTURE PROGRAMME (RHIP)

Slides:



Advertisements
Similar presentations
1 Presentation to the Portfolio Committee on Water Affairs and Forestry and Select Committee on Land and Environmental Affairs 2005 Department of Water.
Advertisements

BUCKET ERADICATION PROGRESS SELECT COMMITTEE ON LAND AND ENVIRONMENTAL AFFAIRS HEARINGS 22 & 23 February 2007 Presented by Ms. T. Mpotulo Department of.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON COOPERATIVE GOVERNANCE & TRADITIONAL AFFAIRS (CoGTA) Tuesday, 21 August 2012 FUNDING OF WARD COMMITTEES.
SIP 18 WATER AND SANITATION MASTER PLAN Water and Sanitation Master Plan NDHS and DWA Water & Sanitation Master Plan.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
Department of Arts and Culture Presentation to the Select Committee on Appropriations: 08 May 2013 Community Library Services Grant Mr Sibusiso Xaba Director.
1 Water Services to Schools and Clinics Programme 20 June 2007 Presentation to Select Committee on Education and Recreation By DWAF.
Eradication of Mud Schools and other Inappropriate Structures Presentation to Portfolio Committee 22 September 2008.
Total budget for 2014/15 is R33,9 billion growing at an average of 9,3% to R39,4 billion over the MTEF; Of this R30,1 billion or 88,7% are Conditional.
1 2009/10 DIVISION OF REVENUE BILL Presentation to Select Committee on Finance 24 February 2009.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
1 PROGRESS MADE AND RECOMMENDATIONS OF THE PORTFOLIO COMMITTEE ON THE RURAL HOUSING IINFRASTRUCTURE PROGRAMME 09 NOVEMBER 2011.
Department of Arts and Culture Presentation to the Select Committee on Appropriations: 05 June 2012 Community Library Services Grant Mr Sibusiso Xaba Director.
MASIBAMBANE CO-ORDINATING COMMITTEE MEETING PROGRESS REPORT ON THE RURAL HOUSEHOLD INFRASTRUCTURE PROGRAMME (RHIP) 22 nd JUNE 2012 MASIBAMBANE CO-ORDINATING.
Programme 4: Housing Development Finance Purpose: Fund national housing and human settlement development programmes in terms of the Housing Act (1997),
Themba Wakashe Director - General Department of Arts and Culture 2009 / 10 DIVISION OF REVENUE BILL PRESENTATION TO SELECT COMMITTEE ON FINANCE NCOP 3.
Department of Cooperative Governance PRESENTATION TO THE PORTFOLIO COMMITTEE ON ENERGY Program: Free Basic Services Presenter: Chris MALEHASE 10 SEPTEMBER.
Presentation to Portfolio Committee Progress on the Departmental Under-Expenditure and Recovery Plans -Mr. T. Zulu Director-General 1.
Integrated National Electrification Programme (INEP): Overall Performance (End of January 2012) Dr Wolsey Barnard.
Presentation to the Select Committee on Finance 26 FEBRUARY 2006.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
NATIONAL DEPARTMENT OF HEALTH National Health Insurance Grant Select Committee on Appropriations Hearing on 3 rd and 4 th Quarter Expenditure 4 th June.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
1 Overview The Expanded Public Works Programme (EPWP) 17 Aug 2010 EPWP incentive update for Select Committee on Public Services.
Public Hearings on Division of Revenue Bill, 25 February 2009 Presentation by Department of Water Affairs and Forestry 1.
1 Presentation of the Financial Performance of the Department to the Standing Committee on Appropriations 23 March 2011 Presented by Cathy Motsisi Chief.
Financial and Fiscal Commission
Presentation to the Portfolio Committee on Energy
COMMISSION ON RESTITUTION OF LAND RIGHTS ANNUAL REPORT 2012/2013
BUDGET OVERVIEW Total budget for 2014/15 is R33,9 billion growing at an average of 9,3% to R39,4 billion over the MTEF; Of this R30,1 billion or 88,7%
PRESENTATION TO THE PORTFOLIO COMMITTEE
PRESENTATION TO THE TRANSPORT PORTFOLIO COMMITTEE BUS SUBSIDY BUDGET SHORTFALL 2008/09 03 FEBRUARY
Legislation Constitution of the Republic of South Africa, 1996 (Act No. 108 of 1996) Housing Act No.107 of 1997 The Housing Consumers Protection Measures.
Trevor Balzer: Acting CFO Helgard Muller : CD Water Services
PRESENTATION TO SELECT COMMITTEE ON FINANCE
National Department of Health Presentation to the Standing Committee on Appropriations Public Hearings on the Adjustments Appropriation Bill 05 November.
Early Childhood Development Delivery – one year later
PORTFOLIO COMMITTEE ON PUBLIC WORKS VERIFIED GOVERNMENT DEBT OWED TO MUNICIPALITIES AND PAYMENTS Department of Public Works 24 May 2016.
Presentation of the 4th Quarter Financial Performance of the Department to the Standing Committee on Appropriations (SCOA) 24 August
Commission on Restitution of Land Rights Briefing session on Annual Reports to the Portfolio Committee on Rural Development and Land Reform 12.
Presentation of the 2009/10 Annual Report
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
27 November 2018 PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE ON APPROPRIATION 16 MAY 2018 MANCO.
Expanded Public Works Programme (EPWP) for the Social Sector – Conditional Grant Presentation to the Select Committee on Appropriations | National.
GREEN FUND PROJECT PROTFOLIO
Progress Report on Payment of Suppliers
ADD NAME/TITLE HERE Rural Household Infrastructure Programme Presentation to: Human Settlements Portfolio Committee by Chief Director: Ms Tamie Mpotulo.
Select Committee on Finance Water Services Operating and Transfer Subsidy 10 May 2006 Department of Water Affairs and Forestry Jabulani Sindane : DG Trevor.
BUCKET ERADICATION : KWAZULU-NATAL
STRATEGY TO REDUCE CASE BACKLOGS TO THE PORTFOLIO COMMITTEE ON POLICE
1st QUARTER CONDITIONAL GRANTS SPENDING
ADD NAME/TITLE HERE Rural Household Infrastructure Programme Presentation to: Human Settlements Portfolio Committee by Chief Director: Ms Tamie Mpotulo.
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS
Monitoring Structures & Processes to ensure that the pothole reparation project across the 9 Provinces has the necessary delivery impact" 02 August.
Sport and Recreation Infrastructure Programme
Basic Education Supplementary Presentation: National &Provincial Education Expenditure Trends and Projections Presentation by Dept of Basic Education to.
Progress on the Bucket Eradication Programme
PRESENTATION TO THE SELECT COMMITTEE ON EDUCATION & RECREATION
Portfolio Committee on Health Parliament
2011/12 Provincial Business Plans & Outcome 8 Targets Human Settlements Portfolio Committee 29 April 2019.
PROGRESS REPORT ON THE RURAL HOUSEHOLD INFRASTRUCTURE PROGRAMME (RHIP) 17 AUGUST 2012 By MR T ZULU DIRECTOR GENERAL.
SCHOOL INFRASTRUCTURE
EPWP PROGRESS REPORT TO PORTFOLIO COMMITTEE ON PUBLIC WORKS
Water Services Targets
PRESENTATION TO THE PORTFOLIO COMMITTEE ON SPORT & RECREATION
MPUMALANGA 4TH QUARTER EIG PERFOMANCE
EPWP Incentive Grant 4th Quarter 2009/10 performance 18th May 2010
Select Committee on Finance National Council of Provinces
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
PORTFOLIO COMMITTEE 20 FEBRUARY 2019
Presentation transcript:

SELECT COMMITTEE ON PUBLIC SERVICE: REPORT ON QUALITY SANITATION TO HOUSEHOLDS PROGRESS REPORT ON THE RURAL HOUSEHOLD INFRASTRUCTURE PROGRAMME (RHIP) 28 AUGUST 2012 By MR T ZULU DIRECTOR GENERAL

PRESENTATION OUTLINE Background RHIP Overview RHIP Objectives Roles and Responsibilities Progress per Province – 2010/11 Challenges – 2010/11 Progress per Province – 2011/12 Financial Performance – 2011/12 Job Creation – 2011/12 Challenges – 2011/12 Way Forward – 2012/13 & 2013/14

Draft and Confidential Background In May 2009 State President announced the transfer of sanitation function from DWA to NDHS Programme was formally transferred on 1 Nov 2009 Staff transferred were component dealing with basic sanitation - high level of sanitation remained with DWA Draft and Confidential

RHIP OVERVIEW The Rural Household Infrastructure Programme is a special four year programme to provide basic sanitation to rural communities. The budget allocation at R1.2 billion over four year period as a schedule 7 Grant . NDHS appoints Implementation Agents & enters into SLAs with Water Services Authorities. The budget split over 4 year lifespan: 2010/11: R100 million; 2011/12: R231,5 million; 2012/13: R479,5 million and 2013/14: R389 million.

RHIP OBJECTIVES To support municipalities to address rural basic sanitation backlogs. To improve the quality of life in rural communities. To contribute to the rural development priority of government. To contribute to job creation and Local Economic Development. To contribute towards meeting the sanitation MDG targets of South Africa. To accelerate delivery of sanitation to meet the 2014 target.

Roles and Responsibilities of Implementing RHIP Grant being gazetted as a Schedule 7 Grant: Even though funds are gazetted against municipalities, it is transferred to the National Department for management /implementation in particular municipalities National Department is responsible for identifying mechanisms for implementation - Implementing Agents which could be NGOs, CBOs, Public Entities or Managing Contractors. National Department needs to agree with municipalities on the scope of the work to be done. This is for the purpose of aligning the RHIP projects to municipal IDPs. This necessitates identification of specific areas of operation up to ward level. National Department needs to agree with municipalities on issues of operation and maintenance of infrastructure

Roles and Responsibilities of Implementing RHIP (cont…) Municipalities are to ensure that RHIP projects appear in their IDPs. All parties attend site meetings to monitor progress and identify means of interventions should there be obstacles during implementation.

Demographic Profile (National Perspective)   Population estimate % of total population households Eastern Cape 6 829 958 13,50 1 623 448 Free State 2 759 644 5,46 888 536 Gauteng 11 328 203 22,39 2 658 402 KwaZulu-Natal 10 819 130 21,39 1 754 348 Limpopo 5 554 657 10,98 1 358 087 Mpumalanga 3 657 181 7,23 1 060 026 Northern Cape 1 096 731 2,17 962 663 North West 3 253 390 6,43 230 878 Western Cape 5 287 863 10,45 1 711 439 Total 50 586 757 100,00 12 247 827 The current population of 50.5 million (2011) can be split into more than 68 000 settlements, of which: ~21.2 million people (or 42% of the population) live in large metropolitan areas ~9.1 million people (or 18% of the population) live in medium-sized cities and towns ~4.5 million people (or 9% of the population) live in small towns in rural areas ~15.5 million people (or 31% of population) live in small rural villages and scattered settlements 2018/11/20

SANITATION STAUTS QUO: Households National Sanitation Backlog Profile from the Period 1994 to 2011. (Source: Water Services National Information System (WS/NIS April 2011). Table 1. Province Households with no access to basic Sanitation - April 1994 Households with no access to basic Sanitation - Oct 2001 Households with no access to basic Sanitation - April 2011 Households Served 2009/2010 Eastern Cape 1,001,327 899,487 288,346 49,371 Free State 399,780 348,433 236,647 9,104 Gauteng 621,394 522,836 406,054 33,667 KwaZulu-Natal 939,542 1,063,336 348,629 92,149 Limpopo 800,352 840,257 464,257 37,151 Mpumalanga 421,757 434,306 296,169 13,420 North West 368,290 411,760 236,577 17,845 Northern Cape 143,068 85,530 47,909 2,958 Western Cape 388,745 153,239 80,743 4,707 National 5,084,255 4,759,184 2,405,331 260,372

PROGRESS PER PROVINCE - 2010/11 Allocation: 2010/2011 (R’000) Number of Benefiting Municipalities Target Number of VIP Toilets VIP Toilets completed at 31 March 2012 % Completion Eastern Cape R18,000 5 2,559 100% Free State R3,000 1 300 Limpopo R27,000 9 3,600 3,376 94% KwaZulu-Natal 7 3,674 Mpumalanga R4,000 515 Northern Cape 400 North West R6,000 2 828 National Prog. Management R12,000 Grand Total R100,000 26 11,876 11,652 98%

CHALLENGES - 2010/11 Programme started in Oct 2010 (procurement delays). Some WSAs did not fully grasp the nature of Schedule 7 Grant and delayed signing SLAs with NDHS as they wanted to implement the programme themselves. Excessive rainfall was experienced during December 2010 and January 2011 which caused delays. Implementing Agents struggled to source building material and have it delivered on site. Some contractors struggled with difficult ground conditions i.e. hard rock and high water table.

PROGRESS PER PROVINCE - 2011/12 Allocation: 2011/2012 (R’000) Number of Benefiting Municipalities Number of VIP Toilets targeted VIP Toilets completed as at 31 May 2012 % Completion Eastern Cape R65,000 13 7,462 7,185 96% Free State R10,000 3 1,297 1,198 92% Limpopo R48,000 12 5,864 4,081 70% KwaZulu-Natal R68,000 15 7,967 7,137 90% Mpumalanga R8,000 2 1,038 1,023 99% Northern Cape 1 507 486 North West R28,000 7 3,551 2,979 84% Grand Total R231,500 53 27,686 24,089 87%

FINANCIAL PERFORMANCE - 2011/12 (WITH ROLL-OVERS) Province 2011/12 Allocation & 2010/11 Rollover Expenditure at 31 March 2012 Work in Progress KwaZulu-Natal R80,487,091 R63,207,997 R17, 279,094 Eastern Cape R65,000,000 R55,868,072 R9,131,928 Limpopo R54,552,091 R26,688,032 R27,864,059 North West R30,063,533 R22,711,497 R7,352,036 Free State R12,924,676 R8,548,344 R4,376,332 Mpumalanga R10,086,447 R7,943,553 R2,142,894 Northern Cape R4,394,162 R2,298,425 R2,095,737 Grand Total R257,508,000 R187,265,920 R70,242,080

2010/11 Roll-overs PROVINCE AMOUNT LP R9 m FS R3 m MP R2 m KZN R12m TOTAL R26 m

RHIP 2012/13 Expected Delivery Province Allocation: 2012/2013 (R’000) Number of Benefiting Municipalities Estimated Target Number of VIP Toilets Eastern Cape 136 500 15 15,165 Free State 18 000 2 2,000 Limpopo 88 000 12 9,775 KwaZulu-Natal 147 000 17 16,328 Mpumalanga 24 000 2,666 Northern Cape 9 000 1 1,000 North West 57 000 7 6,332 Grand Total 479 500 56 53266

No of Benefiting Municipalities Estimated Target No. of VIP Toilets TEMP. JOB CREATION - 2011/12 Province No of Benefiting Municipalities Estimated Target No. of VIP Toilets Jobs Created as at 31 May 2012 Eastern Cape 13 7,462 1,372 Free State 3 1,297 181 KwaZulu-Natal 15 7,967 1,254 Limpopo 12 5,864 867 Mpumalanga 2 1,038 324 Northern Cape 1 507 70 North West 7 3,551 658 Grand Total 53 27,686 4,726

CHALLENGES - 2011/12 The 2 appointed Implementing Agents (Mvula Trust and IDT) could not implement such a programme at scale and achieve the outcomes set. The existing SLAs between the NDHS and the Programme Management Support Team (Maxima Global/TranSpace) on one hand and Mvula Trust and IDT on the other were not consistent with each other. The process of handling claims of the Implementing Agents needed to be restructured to assist them with improved cash-flow management.

CHALLENGES - 2011/12 cont… The recovery plans submitted in Sept 2011 by the 2 Implementing Agents were too optimistic. The IAs ability to procure building materials from suppliers in large quantities posed a serious challenge to the outcomes of the programme. The scope of work approved for the IDT was at high risk of not being completed by end of the 2011/12 financial year. In December 2011 NDHS re-allocated 7,098 units from IDT and negotiated with Mvula Trust to complete these units by the end of the 2011/12 financial year.

Operations and Maintenance Challenges 2012 Division of Revenue Act: Basic Service component of the Equitable Share, breaks down the allocation between water, sanitation and refuse removal. These funds are for operation and maintenance which include emptying of full pits and septic tanks. Draft and Confidential

WAY FORWARD - 2012/13 & 2013/14 NDHS has reduced the previous allocations to IDT and Mvula Trust to approximately 60% of the 2012/13 budget (in line with NDHS Portfolio Committee recommendations). NDHS is currently in process of allocating approx 40% balance of the 2012/13 budget to tender for additional Implementing Agents to be added to the programme. The SLA of the Programme Management Support PSP is to be aligned to the performance of the IAs. In 2012/13 both machinery & manual labour will be used in difficult ground conditions where needed.

Draft and Confidential Thank you Draft and Confidential