Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.

Slides:



Advertisements
Similar presentations
Tree Jack Copyright by B&B Oilfield Services, Inc
Advertisements

Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Dual Casing Running for deep water spud in
Well Design PE 413 Surface Equipments and Placement Techniques
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Well Design PE 413 Introduction and API Standards of Casing
PETE 411 Well Drilling Lesson 17 Casing Design.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
Health and Safety Executive Health and Safety Executive Dropped Objects Update September 2013 Donald Dobson Health & Safety Executive Offshore Division.
Chapter 3 Casing design.
Present Procedure for cutting stuck casing on Drilling PLATFORM
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Wellhead Recovery System The wellhead system that fits the application. (Patent Pending)
Drilling Engineering – PE311 Circulating System
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Instrumented Surface Sub DOE Project (DE-FC26-03NT41782)
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
Trouble in the Gulf Deepwater Horizon
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
"AIR COOLER" Heat Exchanger
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
BASIC MUD LOGGING.
ISO Wellhead Integrity
ADNOC Petroleum Institute Quantitative Risk Assessment in Petroleum Engineering Vision/Mission: Internationally recognized and accredited graduate petroleum.
Lesson 8 Offshore Drilling
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Petroleum Engineering 406 Floating Drilling
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
“ Where SERVICE is everything, but SAFETY is first ”
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Casing Design.
Artificial Lift Systems
Isolation Valve Installation Readiness Trevor Smith/Mark Nichols 11 May 2010 MC 252 Incident Response.
Petroleum Engineering 406 Floating Drilling
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Introduction to Well Completions
oil Housing Drilling Floor Derrick Conductor 30” (or 36”) (Jet Cleaning.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
OIL WELL DRILLING GUIDED BY Miss. SUMA K Lecturer PRESENTED BY SHALIN P M NO : 48 S7 CHEMICAL.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Valve Types Gate valves, Ball valves, & Choke valves. Gate valve: used on oil producer wellhead tree. (2 manufacturers Gray & Cameron). Ball valve: only.
DOWNHOLE EQUIPMENT FOR CONPLICATED CONDITIONS
Pistons and piston rings
Oil-Field Hydraulics Chapter 2 Production Equipment
CASING.
Chapter 2: Casing Design Introduction and API Standards of Casings
Cementing How it is Done
SUSTAINABLE DRILLING OF OIL & GAS WELLS
A PROPOSAL TO TRANSPORT FLUIDS FROM WELLHEAD TO FLOW STATION USING A GAS DISPLACEMENT PUMP. Juan Carlos Brown, 6th July 2017.
OFFSHORE CONSTRUCTION
Petro Data Mgt II- Drilling and Production
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
Artificial Lift System And Sucker Rod Pumps
Well Design - PE 413 Surface Equipments and Placement Techniques
Content Introduction Salient Points Offset well Analysis
Oil & Gas drilling.
Running & Landing Casing
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Casing Design Workshop
Design Calculations Combination Strings
Cryomodule Assembly Plan
WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Presentation transcript:

Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below the rig floor. When drilling offshore, from a floating vessel, the wellhead is installed at the seabed. The wellhead on a land or platform well is made up of a series of spools, stacked up, one on top of the other.

Parts Wellhead Surface wellhead spools have four functions: To suspend the weight of the casing string; To seal off the annulus between successive casing strings at the surface; To allow access to the annulus between casing strings; To act as an interface between the casing string and BOP stack.

Parts Wellhead

Parts Wellhead

Parts Wellhead Slip Type Casing Hangers: This type of hanger is wrapped around the casing and then lowered until it sits inside the casing spool. The slips are automatically set when the casing is lowered. This type of hanger can be used if the casing stands up on a ledge and cannot reach its required setting depth. These types of hanger are also used when tension has to be applied in order to avoid casing buckling when the well is brought into production.

Parts Wellhead Mandrel Type Casing Hangers: is screwed onto the top of the casing string so that it lands in the casing housing when the casing shoe reaches the required depth. Although this is the most common type of hanger it cannot be used if there is a risk that the casing will not reach bottom and therefore that the hanger will not land in the wellhead.

Parts Wellhead Casing spool is a well head component used in flanged wellhead assemblies to secure the upper end of a casing string. Casing spools or bowls are available in a wide range of sizes and pressure ratings and are selected to suit the specific conditions.

Parts Wellhead The procedure for installing a spool type wellhead system can be outlined as follows Conductor (20’’) is run and cemented in place Surface casing (13 5/8’’) is run and cemented in place. A casing head housing is welded onto the top of the surface casing. BOP is connected to the upper flange of the housing. Intermediate casing (8 5/8’’) is run and cemented in place. BOP is disconnected and a casing spool is flanged up on the top of the surface casing. Casing hanger is run into the casing housing. The BOPs made up on the top of the spool. The process continues with a new spool being installed for each casing string Finally the Christmas tree is installed on the top of the wellhead.

Parts Wellhead

Parts Wellhead Christmas tree (NOT a wellhead) is an assembly of valves, spools, and fittings used for an oil, gas wells, water injection well, water disposal well, and gas injection well. It is installed on the top of the wellhead. The primary function of a tree is to control the flow of oil or gas. A tree often provides numerous additional functions including: Chemical injection Well intervention means Pressure relief means Monitoring points: pressure, temperature, corrosion, erosion, … Connection points for devices: down-hole pressure and temperature