Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.

Slides:



Advertisements
Similar presentations
New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
NOTICE SUBMISSIONS Requirements and Procedures 1.
Residential Building Codes and Preferences For the Designer Sleeping Area Architectural Design.
Floor-Plan Dimensions and Notes
Type III Legacy Buildings Prosser Fire District 3 - Officer Development.
Bronze Award: Library/Media Center
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Fire Tax Remains at.505 Mills 2013 Fire Tax Remains at.505 Mills 2014 Fire Tax Increases to.655 Mills Increase of.15 Mills on the Fire Tax ($15.
Safety Officer State Practical Skill Final Exam. Create a Incident Safety Plan State Practical Skill Exam Using the Structure Fire Safety Report complete.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
City of Petaluma Fire Station/ Headquarters Building August 30, 2006 Workshop.
United States Fire Administration Chief Officer Training Curriculum Operations Module 16: Dormitory Simulation Exercise.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
CITY OF YORK, PENNSYLVANIA DEPARTMENT OF FIRE/RESCUE SERVICES.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Fairview Fire District Geographic Information System (GIS) Fire Suppression and Emergency Medical Services Response Capabilities Analysis.
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Create Harmony and Balance in Your Home and Office
Atlanta Fire Rescue Field Operations Furlough Plan & Impacts.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
U NIVERSITY O F K HARTOUM C ONSULTANCY C ORPORATION Dec STARS HOTEL PROJECT 5 STARS HOTEL project UNIVERSITY OF KHAERTOUM.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Perinton Community Center Room and Gym Rentals
Church Administrators & Emergency Planning
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Data to Deployment Clark County Fire Department IAFF 2007 EMS Conference.
Building Codes and Interior Design
How can we do it? Hmong has scattered around Wisconsin and has classify into 12 communities: Milwaukee, Madison, Sheboygan, Manitowoc, Green Bay, Fox Cities,
Fire Rescue FY Budget Worksession July 16, 2012.
City of Leon Valley Town Hall Meeting. Background Since 1972, when the original City Hall was built, the City of Leon Valley has grown by over 8,900 residents.
West Skagit Regional Fire Authority Planning Committee.
Site Plan Review 8 May 2013 Jeff Shaw, AIA Principal-in-charge Newton Fire Station #10.
SIZE-UP The systematic process consisting of the rapid, yet deliberate, consideration of all critical fire ground factors that leads to the development.
COUNCIL ON ACCREDITATION/DoD FITNESS CENTER STANDARDS DEVELOPMENT.
Affordable housing project
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
MOUNT HOLLY FIRE DISTRICT Fire Station Renovation Referendum December 12, 2015 Relief Fire Company 17 Pine Street, Mount Holly 2PM – 9PM.
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
Research on Lot #ID Proposed Demolition Parking Lot for “The Wherehouse?”
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
Brian Ward Founder FireServiceSLT.  I, nor any of the organizers, involved in the production of this conference are liable for personal injuries that.
Newtown Police Department Facility Needs Assessment A comparison of our facility with newer facilities of similar makeup. By Lieutenant David Kullgren.
BOND PLANNING FIRE STATION, EMERGENCY RESPONSE, AND COMMUNITY SAFETY IMPROVEMENTS.
Site & Building Assessment Study Conducted by: Caolo & Bieniek Associates, Inc. Fire Station Study Committee Report to Select Board September 18, 2006.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
SUTTON POLICE DEPARTMENT
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
INDOOR BASEBALL / SOFTBALL FACILITY
John Wood John Reed Mark Purple (Town Admin)
Town of Newbury Proposed New Fire Station
MIDLAND FIRE DEPARTMENT OPERATIONAL COVERAGE
Newbury Safety Services Facility June 2017 Public Forum
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
Atlanta FF Fatality November 23, 2006.
1 Semester Project Design A Multi Story Office Building
Facilities and Layout Planning
FOR SALE 110 Butterworth St Mankato MN SALE PRICE: $450,000
TUESDAY, APRIL 3rd.
Existing Fire District Buildings
River Front Place 283 W. Front Street
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
Presentation transcript:

Williamstown Fire Department Fire Station Feasibility Study

Existing Station Location 34 Water Street Built 1950 Extended the building front forward 15 in Sq ft 1 story building 1/3 Acre site River bank on one side Masonry walls Wood framed roof

Apparatus Bay Existing – 2,422 sq. ft. – 3 bays wide – 2 Overhead doors: x 11& x 11 – 4 trucks total =1,320 sq. ft. – Other miscellaneous equipment

Existing Conditions Cant open doorsTight quarters Isle ObstructionsFirefighter to close to Trucks

Existing Spaces Training Meeting Space Kitchen Office

Existing Parking

Space Needs Program Outlined By McGuire Group 2008 Staffing and Parking Space Allocations Apparatus and Support Public Lobby/Dispatch Administration Firefighters Headquarters Indoor Training Building Support and Mechanical

Operational Issues Overhead doors too narrow and too low Apparatus bays too narrow and too low Administrative spaces inadequate No Day Room for firefighters Air-Pak filling station in apparatus bay is a hazard No Decontamination area for Gear and Equipment Male/ Female Shower rooms non-existent Kitchen is too small for current staff

Space Deficiencies Only one office No room for new construction print review No office for Asst. Chiefs / Training, Pre- Planning fires, Truck & Equipment maintenance records No area for code enforcement information Not adequate space for firefighters – Locker room – Shower room

Apparatus Bay Comparison Williamstown FD Existing 2242 Sq./Ft Modern Fire Station 6100 Sq./Ft

Apparatus Bay Space Needs Williamstown FD ExistingModern Fire Station

Administrative Space Present Conference RmPresent Office Modern

Training Modern Existing

New Apparatus Area

Apparatus Williamstown 1975Williamstown 2012

Proposed New Site Main St

Aerial View of Proposed Site

Size Comparison Existing Station

Thank You Anytime Anywhere Anything Well Be There! Any Questions?