Assembly instructions for M-K all bolt together hoppercone kit.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
RockOn! Canister Integration RockOn! 2009.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Materials QtyLWHDescription 28’X4’X15/16”Plywood (15/16” is also known as ¾”) 88’X2”X1”Lumber – Pine 16Home Depot 5 Gal Bucket 48’Rolls of hook and tie.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Assembly instructions Part 5 Covers 19 January 2014 Sunrider II.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Installation. Indoor Unit Installation Typical Installation.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Installation. Indoor Unit Installation Typical Installation.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
1. b. Rip Saw 2. d. Used for cutting with the grain.
Peregrine the Martian Lander Assembly Instructions Mission to Mars 2008.
The 2 reinforcement plates are made from a piece of 2” dia stainless tube. Read on for how this is done. 14.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
RockOn! RockOn! Structure Build RockOn! 2009.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Rotating Compost Barrel Construction
Assembly of steering.
Mezzanine Build Plans.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Automotive Engines Theory and Servicing
5 3 2 Based on Roland’s ARES and launch pad model. 7 1.
Hand-cranked Windmill Assembly Instructions
Step-by-step assembly instructions
MACHINE PARTS (FOR DCE / DIT)
Module 6 Antenna Assembly and Look up Angles
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Louisiana Tech University
Mounting a BalanceBox®650 to a brick wall
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
The Victorian Gazebo II Assembly Instruction
Step-by-step assembly instructions
Step-by-step assembly instructions
4 shelf shoe rack assembly instructions
Automotive Engines Theory and Servicing
Presentation transcript:

Assembly instructions for M-K all bolt together hoppercone kit. M-K Industries 800-345-8293 Assembly instructions for M-K all bolt together hoppercone kit. M-K Industries 800-345-8293

Install strap plate with 2 bolts on each side, do not tighten. Step 1: Place section 1 and 2 together, upside down and counter clockwise (sections are numbered for assembly). Install strap plate with 2 bolts on each side, do not tighten. Step 2: Put 4 each 5/16x1 bin bolts in seam Bottom, Middle and 3rd hole from the top. Bolt head and washer will be inside the cone. Do not tighten. Continue with Steps 1 and 2 until all sections are together. If you have 2 part sheets put the bottom row up first and then put on the small sheet. The small sheet fits over the outside of the bottom sheet. Use 3-4 bolts in the seam. Do not tighten. Step 2: Put 4 bin bolts in seam. Bottom, Middle and 3 holes from the top. Do not tighten. Continue with Step 1 and 2 until all sections are together.

Step 4: Continue installing all legs. Step 3: Slide leg into sleeve with the angle cut end turned same as sleeve. Tighten set bolts to hold leg in place. Step 4: Continue installing all legs. Step 4: Continue installing all legs.

Continue placing angle iron leg braces until all are in place. Step 5: Place gate ring over the cone sheets. Line up one of the tabs with the 2nd hole in the sheet seam. Be sure tabs line up with legs. You may need to drill the balance of the holes for the gate ring to fit properly. Our current ring is different from one shown. Step 6: Place angle iron leg brace under the tab on the leg and bolt into place with 2 each 3/8x1 grade 8 bolts with 3/8 lock nut. Then attach the other end to tab on gate ring also with 2 each 3/8x1 grade 8 bolts with 3/8 lock nut. Continue placing angle iron leg braces until all are in place. Step 6: Place angle iron leg brace under the tab on the leg and bolt into place with 2 each 3/8x1 grade 8 bolts with 3/8 lock nut. Then attach the other end to tab on gate ring also with 2 each 3/8x1 grade 8 bolts with 3/8 lock nut. Continue placing angle iron leg braces until all are in place.

Be sure to block up the center if you stand in halves. Step 7: Rolling the completed unit. You can leave 2 seams open and roll 1 section at a time or you can assemble in 1 piece and have the crane flip your cone into place when they are there to set your grain bin. Be sure to block up the center if you stand in halves. The unit can be assembled upright. Assemble 3 sections upside down and then raise the 3 sections, add the remaining sections 1 at a time.

The unit can be assembled upright The unit can be assembled upright. Assemble 3 sections upside down and then raise the remaining sections 1 at a time. When all sections are in place tighten all bolts. Set bin over top of cone and bolt bin to the top of the cone. You are now ready for years of trouble free, maintenance free grain unloading.

Aeration Installation The flange ring is already installed on the outside of one cone sheet. Place 6ft cover 2ft up from gate opening on inside of hoppercone. Drill holes in cone and use 3/8 x1 bolts with lock nuts to secure the tunnel to cone wall. Put bolts in top and sides, you will need to bend down the bottom to fit the curve of the cone wall before you can add bolts. The flange ring is already installed on the outside of one cone sheet. Place 6ft cover 2ft up from gate opening on inside of hoppercone. Drill holes in cone and use 3/8 x1 bolts with lock nuts to secure the tunnel to cone wall. Put bolts in top and sides, you will need to bend down the bottom to fit the curve of the cone and then you can also put bolts there.