WILLIAM PENN HIGH SCHOOL NEW CASTLE, DE

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects May 2009.
Advertisements

BIM EXECUTION PLANNING PROCESS
A PROJECT MANAGEMENT OVERVIEW Maritime Place PMI EMERALD COAST FLORIDA CHAPTER JANUARY 21, 2014.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
Tower 4 Residence Hall Building Renovation & Asbestos Abatement IBC Engineering, P.C.
WHEELOCK COLLEGE CAMPUS CENTER AND STUDENT RESIDENCE courtesy of william rawn associates anne k cheney lighting | electrical option advisors: kevin houser,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.
Lory Student Center Theatre Renovation. PROJECT OVERVIEW  LSC Master Plan, Phase II - Student, Stakeholder, & Staff Involvement (completed March 2010)
“What are some of our moving targets?”. FSD1 Building Program Growth Ken Stevenson’s original program called for all three elementary schools to be a.
Current Electricity - Symbols Identify the Symbol.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
Schematic Design Proposal Bahen Centre for Information Technology University of Toronto Toronto, Ontario, Canada Rebecca Ho Lighting/Electrical Option.
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
Throw Pole Throw Pole nc no. Electric symbols Single pole single throw normally open Single pole single throw normally closed double pole single throw.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Paul Roberts Senior Thesis 2010 Construction Management.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Department of Public Works Proposed Underground Utility District 10-1 Mountain Street Lake Avenue to Hill Avenue.
The Montgomery County Conference Center and Hotel 5701 Marinelli Road, Rockville, MD.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
DAVIS SR. HIGH SCHOOL ALL-STUDENT CENTER (MULTIPURPOSE BUILDING) PROGRAMMING OPTIONS August 6, 2015.
-Basic Circuits -Power Distribution -Fusing/Protection.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
Chapter 15 Electrical – HW #10
Bond Oversight Committee
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Bensalem Township School District Business Affairs Committee Meeting
BIM EXECUTION PLANNING PROCESS
PIMPRI CHINCHWAD POLYTECHNIC
David Anderson Mechanical Option
Electricity and Electric Circuits
Introduction to Agriculture
Bensalem Township School District Business Affairs Committee Meeting
Council Rock High School South
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Designers’ Manual Appendix Contents
BIM EXECUTION PLANNING PROCESS
Feasibility of Ice Storage
The Bond Street Wharf Baltimore, Maryland
Cryoplant Installation Design Summary
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Lehigh Valley Heritage Center
Construction Management Option
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
Dan Packer CM Option Introduction Existing Buildings and Systems
Rucker Elementary School
Sandy Grove Middle School
M E A S U R E ‘G’ P R O G R A M U P D A T E
RIDDLE If you screw a light bulb into a lamp socket by turning the bulb towards the right with your right hand, which way would you turn the socket with.
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Huntsville High School Softball Program Upgrades
Ward Park Restroom Timeline
Street Lighting and Electric System Undergrounding
Presentation transcript:

WILLIAM PENN HIGH SCHOOL NEW CASTLE, DE Existing Project Conditions: Location: New Castle, DE Total Building Size: 2 Floors, 556,200 sq ft Project Cost: Phase I - $6,330,272 Phase II - $2,766,58 Phase III - $3,874,341 Construction Dates: Phase I – June ’02-August ’02 Phase II – June ’03-August ’03 Phase III – June ’04-August ’04 Owner – Colonial School District Architect – Tetra Tech, Inc. MEP Engineers – Furlow Associates General Contractor – Ernest DiSabatino & Sons Mechanical Contractor – I.D. Griffith Electrical Contractor – Creedon Controls Asbestos Abatement Alternatives Schedule Acceleration Temporary Lighting Design Materials: 60 Total 20A Circuit Breakers 571 200W Lamps X 2 (Original + 1 Change) 571 Total Lamp Guards 571 Total Pig Tail Sockets 12,000’ Total Romex 1,142 Total Wire Connectors Total Cost Materials & Labor: $71,937 Total Cost Power for Temp Lighting: $7,171 Andrew J. Hickey The Pennsylvania State University Construction Management Option www.arche.psu.edu/thesis/ajh203