Standardization activities in ITU:

Slides:



Advertisements
Similar presentations
GSC: Standardization Advancing Global Communications ITU-R Developments on Emergency Communications B. Gracie, Chairman, RAG/ITU-R SOURCE:ITU-R TITLE:ITU-R.
Advertisements

World Meteorological Organisation Use of Radio Spectrum for Meteorology: Weather, Water and Climate Monitoring and Prediction Jean-Michel Rainer.
World Meteorological Organisation Use of Radio Frequency bands for meteorological systems Jean-Michel Rainer.
ITU-R activities related to TDR Colin Langtry Counsellor Radiocommunication Study Group 8 Workshop on Telecommunications for Disaster Relief, February.
Nairobi, Kenya, 26 – 27July 2010 Role of ITU-T & ITU-R Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU-T Workshop on Delivering Good.
Committed to Connecting the World International Telecommunication Union ITU activity for Space Science Accra, Ghana 8 July 2011 Vadim Nozdrin, Counselor,
Vientiane, Lao Peoples Democratic Republic, July 2012 Standardization for disasters Takashi Egawa, Vice chair of FG-disaster NEC Corporation
International Telecommunication Union ITU/WMO Seminar on: Use of Radio Spectrum for Meteorology: Weather, Water and Climate Monitoring and Prediction Geneva,
Workshop: The Role of Remote Sensing in Disaster Management, ITU, Geneva, December ITU Activities in Remote Sensing International Telecommunication.
13th Meeting of the Regional Interagency Working Group on ICT, 20 November 2009, Bangkok, Thailand 13th Meeting of the Regional Interagency Working Group.
World Meteorological Organization Working together in weather, climate and water Assistance for Haïti Side meeting 9 March 2010 RA IV Hurricane Committee.
RECENT WORK IN ITU ON DISASTER RELIEF & EMERGENCY COMMUNICATION Reinhard Scholl, ITU GSC-18 Meeting, July 2014, Sophia Antipolis, France Document.
Fabio Leite, IMT-2000 Project Manager International Telecommunication Union (ITU) Emergency Telecommunications Workshop February.
Telecommunications Technology Association 29/04/2003GSC-8, OTTAWASlide 1 Identification of Agenda items of WRC that are of interest to PSO As of April,
Review of ITU-R Study Group Activities Kevin A. Hughes Radiocommunication Bureau.
GSC Global Standards Collaboration GSC#10 28 August – 2 September 2005 Sophia Antipolis, France 1 ITU-R activities on Public Protection & Disaster Relief.
© 2005 Oak Ridge Technology Connection, LLC 1 Global Emergency Communications: The Near-Term Challenge Dr. Eric J. Novotny Senior vice President Oak Ridge.
International Telecommunication Union Dr. Leo Lehmann Vice chairman FG-DR&NRR Introduction to Focus Group on Disaster Relief Systems, Network Resilience.
REPORT FROM SESSION #3, CRITICAL COMMUNICATION Jonas Sundborg, ETSI Board Chairman, ETSI GSC-18 Meeting, July 2014, Sophia Antipolis, France Document.
Phuket, Thailand, 20 May 2013 Roles of NBTC in Disaster Relief Atiwat Aimdilokwong Division Director, NBTC ITU Workshop on “Disaster.
GSC-19 Meeting, July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.
ITU Focal Point for Emergency Telecommunications
Leeds University Business School New & Emergent ICTs, Climate Change & Developing Countries Stan Karanasios AIMTech Research Group Leeds University Business.
DOCUMENT #:GSC15-PLEN-09 FOR:Presentation SOURCE:ITU AGENDA ITEM:4.6 CONTACT(S):Malcolm Johnson ITU Update since GSC-14 Malcolm Johnson Director, Telecommunication.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
DOCUMENT #:GSC15-PLEN-21 FOR:Presentation SOURCE:ITU AGENDA ITEM:6.2 CONTACT(S):Colin Langtry; Reinhard Scholl ITU activities for Emergency Communications.
RADIO FREQUENCY SPECTRUM POLICY NOVEMBER Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development 2 WHAT IS SPECTRUM?
Key results of World Radiocommunication Conference (WRC-07) DOCUMENT #:GSC13-GRSC6-12 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:GRSC 8 CONTACT(S):Kevin.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
Workshop: “The Role of Remote Sensing in Disaster Management”, ITU, Geneva, December Radiocommunication Sector and Remote Sensing International.
Vientiane, Lao People’s Democratic Republic, July 2012 ITU-R Standardization Activities Colin Langtry, Chief, BR Study groups Department
ICTs FOR SMART SUSTAINABLE ASIA PACIFIC ITU Asia & the Pacific Regional Development Forum Sofitel Philippine Plaza Manila, Philippines June 2016.
Activities of the Radiocommunication Sector Arab Regional Development Forum on Broadband in the Arab Region: Challenges and Opportunities Tunis-Tunisia,
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
11 S I A M E M B E R C O M P A N I E S Satellite Industry Response to 2005 Hurricanes Satellites = Redundancy, Ubiquity, Interoperability.
Regulatory Measures and Crises Management Dr. M. Yaseen Pakistan Telecom Authority.
Delivering the standards and spectrum to fuel 5G
ITU-R activities on WRC-19 AI 1.12
Dr. Cosmas L. Zavazava, PhD. HEAD, Emergency Telecommunications,
ICAO Position for ITU WRC-15
broadband applications, in accordance with Resolution 233 (WRC-12)
Satellites = Redundancy, Ubiquity, Interoperability
Mario Maniewicz Deputy Director, Radiocommunication Bureau
Disaster and it’s management
ITU activities for Emergency Communications and Disaster Relief
SADC WRC-15 Preparatory Meeting
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
THURAYA Proprietary Information
Recent work in ITU on disaster relief & emergency communication
Report from STRATEGIC Session #3, Critical communication
Telecommunications for Disaster Relief
Doriana Guiducci, European Communications Office
GRSC Chair: Cheryl Blum (TIA)
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
بسم الله الرحمن الرحيم Palestine Initiative on The Use of Telecommunications  in Disaster and Emergency Situations Regional Conference on “Disaster:
ITU Update since GSC-15 Bilel Jamoussi
Asok Chatterjee, GRSC-6 Chair Jackie Voss, ATIS Staff
Draft ICAO Position for ITU WRC-19
Annual Report 2010 CITEL March, 2011.
Draft ICAO Position for ITU WRC-15
Status report from ITU-R WP 5A on ITS activities
DISASTER RESPONSE PLANNING IN SAMOA
Possible Future Agenda Items
Draft ICAO Position for ITU WRC-15
ITU Update since GSC-13 Global Standards Collaboration (GSC) 14
Presentation transcript:

Standardization activities in ITU: Document No: GSC-19_109 Source: ITU Contact: Dr Leo Lehmann, Colin Langtry Agenda Item: 3.9 Standardization activities in ITU: ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR) ITU-R: Disaster prediction, detection, mitigation, relief Dr Leo Lehmann, Chairman ITU-T Study Group 13, former vice-chairman ITU-T FG- DR&NRR Colin Langtry, Chief, ITU-R Study Group Department

FG DR&NRR deliverables Deliverabales Title Transferred SGs Relevant SGs (Information sharing) FG-Overview Overview of disaster relief systems, network resilience and recovery Continue to be examined by ITU-T SG2 ITU-T SG13, SG16, SG17, JCA-AHF, ITU-D Q5/2, ITU-R SG5 FG-Frame Disaster Relief Systems, Network Resilience and Recovery (DR&NRR): Promising technologies and use cases FG-Gap Gap Analysis of Disaster Relief Systems, Network Resilience and Recovery  FG-Term Terms and Definitions for disaster relief systems, network resilience and recovery Transferred to ITU-T SG2 with the aim of making new Recommendations FG-DR Requirements for disaster relief systems FG-NRR Requirements for network resilience and Recovery Transferred to ITU-T SG15 with the aim of making new Recommendations FG-MDRU Requirements on the improvement of network resilience and recovery with movable and deployable ICT resource units (MRDU) FG-TR Technical report on telecommunications and disaster mitigation Transferred to SG2 http://www.itu.int/en/ITU-T/focusgroups/drnrr/Pages/default.aspx Note: all the deliverables above are published at http://www.itu.int/pub/T-FG/e

Arising activities in ITU-T Study Group 2 Requirements for Disaster Relief Mobile Message Service (text/voice) Determined E.108 Requirements for Disaster Relief Systems (draft E.RDR, under study) Terms and definitions for DR&NRR (draft E.TD-DR, under study) Requirements for Safety Confirmation and Broadcast Message Service for Disaster Relief (draft E.RDR-SCBM under study)

Arising activities in ITU-T Study Group 15 Disaster management for improving network resilience and recovery with movable and deployable ICT resource units (L.dm-nrr-mdru under study) Framework of disaster management for network resilience and recovery (L.nrr-frm under study)

Overview of work in ITU-R Study Groups Disaster phases Major radiocommunication services involved Major tasks of radiocommunication services Studies carried out by Radiocommunication Prediction & Detection Meteorological services (meteorological aids and meteorological-satellite service) Earth exploration-satellite service Weather and climate prediction. Detection and tracking of earthquakes, tsunamis hurricanes, typhoons, forest fires, oil leaks etc. Providing warning information Study Group 7 Alerting Amateur services Receiving and distributing alert messages Study Group 5 Broadcasting services terrestrial and satellite (radio, television, etc.) Disseminating alert messages and advice to large sections of the public Study Group 6 Fixed services terrestrial and satellite Delivering alert messages and instructions to telecommunication centres for further dissemination to public Study Group 5 Study Group 4 Mobile services (land, satellite, maritime services, etc.) Distributing alert messages and advice to individuals Relief Amateur services Assisting in organizing relief operations in areas (especially when other services are still not operational) Study Group 5 Broadcasting services terrestrial and satellite (radio, television, etc.) Coordination of relief activities by disseminating information from relief planning teams to population Study Group 6 Earth exploration-satellite service Assessment of damage and providing information for planning relief activities Study Group 7 Fixed services terrestrial and satellite Exchange of information between different teams/groups for planning and coordination relief activities Study Group 5 Study Group 4 Mobile services (land, satellite, maritime services, etc.) Exchange of information between individuals and/or groups of people involved in relief activities

Current activities in Working Party 5A Land Mobile Systems above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services Draft New Report M.[PPDR] “Public protection and disaster relief communications”. This report addresses: the categorization of technical and operational requirements relating to PPDR; the current use of narrow and wide-band PPDR; the mobile broadband PPDR services and applications including further developments and the evolution of PPDR through advances in technology; the needs of developing countries. The Report is expected to be finalized and approved by ITU-R Study Group 5 on 21 July 2015

Backup

Disaster relief by ITU ITU contributes to disaster prevention and response from the telecommunication/ICT aspect since many years Disaster relief activities include preparation for possible disasters, early detection, rescue, evacuation assistance, safety confirmation, recovery assistance, etc. ITU and it’s partners deploy satellite terminals and other emergency telecommunication equipment to affected countries within the first 24 to 48 hours aftermath a disaster to help restore vital communication links.

Mission of the Focus Group Disaster relief for individuals (notify damage situation from victims) disaster relief guidance (show victims the routes to evacuation shelters, home) Network resilience and recovery capability of infrastructure to cope better with disasters

Integrated view of networks supporting disaster relief services

ITU-R focus on disaster prediction, detection, mitigation and relief Radiocommunications Assembly 2007 (RA-07) approved Resolutions ITU-R 53 and ITU-R 55 instructing all ITU-R Study Groups to carry out studies on the use of radiocommunications in disaster prediction, detection, mitigation and relief. In 2012 RA-12 revised and confirmed those Resolutions WRC-12 agreed upon Agenda Item 1.3 for WRC-15: “to review and revise Resolution 646 (Rev.WRC 12) for broadband public protection and disaster relief (PPDR), in accordance with Resolution 648 (WRC-12)”. In addition, WRC-12 revised Resolutions 644, 646, and 647. Nearly every Study Group within the ITU-R has a role to play in Disaster Relief