1 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits.

Slides:



Advertisements
Similar presentations
Facilities Management UW-Eau Claire 29 CFR CONFINED SPACE ENTRY Awareness Training By: Chaizong Lor, Safety Coordinator.
Advertisements

MDPI/GOODWILL OIL AND GAS TRAINING
Module 9 Confined Space.
CONFINED SPACE ENTRY.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Compliance - Work Permit CAKE Session 17. Purpose of the Work permit system: The Purpose of the system is to: - Prevent undesired incidents and mitigate.
Welding, Cutting, and Brazing
1 Hot Work Permits Corporate Environment Safety & Health.
Confined Space Safety An overview of the hazards and regulatory requirements associated with confined space work.
29 CFR CONFINED SPACE ENTRY.
29 CFR CONFINED SPACE ENTRY.
Welding, Subpart J OSHA 500 Course. Critical Hazards n Heat is a source of ignition in the various welding processes n Welding fumes can become a health.
PERMIT-REQUIRED CONFINED SPACE Location of Confined Space:Space Number: Trade Shop: Purpose of Entry: Authorized Duration of Permit: Date: to Time: to.
Permit Required Confined Space Entry Permit Required Confined Space Entry.
PERMIT REQUIRED CONFINED SPACES PERMIT REQUIRED CONFINED SPACES.
Environmental Considerations Confined Space Rescue is inherently dangerous and requires performance of rigorous activities under adverse conditions. Regional.
Permit Required Confined Space Training Guide This Program Is Provided to Protect Authorized Employees That Will Enter Confined Spaces and May Be Exposed.
ENTRANT, ATTENDANT & QUALIFIED PERSON TRAINING. COURSE OVERVIEW Introduction and Purpose Defining a Confined Space Locations and Types of Confined Spaces.
1 Author: R. Chiodi 03/21/1997 rev 04/16/2000 Confined Space Entry Environmetal Safety & Health - Safety Center.
Standard 29 CFR Part Flammable & Combustible Liquids.
Confined Space Safety Training Presentations
CONFINED SPACE ENTRY 29 CFR
29 CFR CONFINED SPACE ENTRY.
HVACR416 - Design Confined Spaces. Confined Space Entry Definitions: The entrant is the person who enters a confined space. The attendant is the person.
Confined Space Safety. Protect Yourself! What is it that you enjoy? Hobbies?? Conditions can change without you knowing, be aware! What steps can YOU.
Hot Work Procedure Training
CONFINED SPACE OVERVIEW. CONFINED SPACES Is large enough and shaped in a way that allows an employee to enter and perform assigned work. It’s also a space.
ASSURANCE Hazards of Confined Spaces. ASSURANCE You Can’t Afford to Make a Mistake Every year people die in confined spaces. It doesn’t have to happen.
GF PROCEDURES FOR PAINTING OPERATIONS ENABLING OBJECTIVES DESCRIBE the Gas Free Engineering requirements for performing spray painting in confined.
1a.  A confined space is:  Large enough to enter and perform work  Limited in the way of entry or exit  Not designed for continuous occupancy 1a.
Whitewater Strategies, Inc. CONFINED SPACES- ROLES WORKERS PLAY QUIZ 1 Confined spaces are areas in the workplace that are difficult to get into and out.
Permit-Required Confined Spaces 29 CFR Why Comply???? Confined space entry is a leading cause of occupational fatalities in this country.
Process Safety Management Contractors. Employer responsibilities v Obtain and evaluate information regarding contract employer’s safety performance 1a.
Hot Work Procedure and Permit
Your Challenge 1)Use the SCORE CARD provided as a guide to the presentation. 2)Make an honest evaluation of your understanding of the topics discussed.
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
CONFINED SPACE ENTRY. CONFINED SPACE STATISTICS u 65% Of All Confined Space Fatalities Due To Hazardous Atmosphere u In All Deaths Last Year (139), There.
Confined Space Entry. OBJECTIVES: Upon completion of this topic you will be able to: Describe what a confined space is. Identify confined space hazards.
Confined Spaces in Construction
Time Completed Job Initials Main steps in a Confined Space Entry setup 1 Job assigned in a vessel that requires the vessel to be entered (definition of.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Harwood Grant #46J6-HT13Southwest Safety Training Alliance Inc1 Module 6 Other Construction Hazards.
Confined Spaces – Part 2 An Overview of the Confined Spaces Issues.
Confined Space Rescue Level I Technical References: Mod 3.
Presented by Kristin Osterkamp and Jenelle K. Thelen Senior Industrial Hygienists MIOSHA Consultation Education and Training
Flammable and Combustible Liquids Standard 29 CFR Part City of Council Bluffs Presented by: SilverStone Group © 2006, 2012 Zywave, Inc. All rights.
Welding, Cutting, and Brazing
Hot Work Permit Osan AB Fire Emergency Services.
Permit-Required Confined Spaces 29 CFR Intro to Confined Space INSTRUCTIONAL GOAL: The participant will understand the requirements and definitions.
Confined Spaces - General. Confined Space-General + Many, or perhaps even most, workplaces have something on the premises that would be correctly termed.
Rev. 1 Permit to Work System Awareness Plus Presentation Covers the General Work Permit’s Use With Other Permit Form.
Excavation & Trenching Awareness Plus
Rev. 1 © Chevron 2009 Hot Work Awareness Plus. Rev. 1 © Chevron Training Objectives  To explain the type of work which may constitute Hot Work.
MGT 401 Week 4 Quiz Check this A+ tutorial guideline at 1. Question : An area large enough.
Permits Web Innovations 2017.
CONFINED SPACE ENTRY TRAINING PROGRAM
Issue Entry Permit Training.
Chapter 9 Safety Permit Systems
Definition A confined space is: Large enough to enter and perform work
Confined/Enclosed Spaces Continuing Education Fourth Quarter 2017
29 CFR CONFINED SPACE ENTRY.
CONFINED SPACE / RESPIRATORY PROTECTION
Confined Space (Permit-required)
Definition A confined space is: Large enough to enter and perform work
29 CFR CONFINED SPACE ENTRY.
Confined space.
29 CFR CONFINED SPACE ENTRY.
Introduction: Phosphates’ Life-Saving Rules.
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
Presentation transcript:

1 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits

2 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Why are we here? The company requires evaluation of very hazardous, nonroutine jobs for which there are no Safe Job Procedures or approved Job Safety Plans. Certain jobs always require that a Safe Work Permit be issued by a qualified individual.

3 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Goals and Objectives: At the end of this session you will: -be familiar with jobs requiring safe work permits. -be generally familiar with the Safe Work Permit system. -pass a quiz with a score of 100%.

4 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Cutting / Welding Permit Location: Job No. Date:Job No. Cutting / Welding Permit Location: Job No. Date:Job No. Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisors Name: Attendants name: Permit issuers name: % oxygen:% lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescueryesno Continuous Gas Monitoryesno Barrier for ground openingsyesno Warning Signsyesno Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisors Name: Attendants name: Permit issuers name: % oxygen:% lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescueryesno Continuous Gas Monitoryesno Barrier for ground openingsyesno Warning Signsyesno Safe Work Permit Permit # Type: (hot work, confined space, line break, etc.....location: Valid __/___/___ ____ __/___/___ ____Issued to: From: M D Y time to M D Y time Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Atm Combustible vapors or gases ( 19.5% & <21%) Toxic Material Concentration Tests Precautions Always Required: Safe Work Permit Permit # Type: (hot work, confined space, line break, etc.....location: Valid __/___/___ ____ __/___/___ ____Issued to: From: M D Y time to M D Y time Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Atm Combustible vapors or gases ( 19.5% & <21%) Toxic Material Concentration Tests Precautions Always Required: There are currently three documents which are called safe work permits.

5 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Cutting / Welding Permit Location: Job No. Date:Job No. Location & Building:Floor Nature of Job: Welders Name: The above location has been examined. The precautions checked on the reverse of this card have been taken to prevent fire. Permission is granted for this work. PermitDate:Time: ExpiresAM PM Cutting / Welding Permit Location: Job No. Date:Job No. Location & Building:Floor Nature of Job: Welders Name: The above location has been examined. The precautions checked on the reverse of this card have been taken to prevent fire. Permission is granted for this work. PermitDate:Time: ExpiresAM PM The Hot Work Permit is a form of Safe Work Permit issued by the Fire Marshal or other person responsible for fire safety. This permit is required for all situations which may result in fires or explosions.

6 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits CAUTION Opening in Ground Keep Out ! The Confined Space Entry Permit is another form of safe work permit regulating entry into pits, tanks, and vessels. Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisors Name: Attendants name: Permit issuers name: % oxygen:% lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescueryesno Continuous Gas Monitoryesno Barrier for ground openingsyesno Warning Signsyesno Safety Harness with life lineyesno Tripod / Hoist / Pulleyyesno Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisors Name: Attendants name: Permit issuers name: % oxygen:% lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescueryesno Continuous Gas Monitoryesno Barrier for ground openingsyesno Warning Signsyesno Safety Harness with life lineyesno Tripod / Hoist / Pulleyyesno

7 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Cutting / Welding Permit Location: Job No. Date:Job No. Cutting / Welding Permit Location: Job No. Date:Job No. Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisors Name: Attendants name: Permit issuers name: % oxygen:% lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescueryesno Continuous Gas Monitoryesno Barrier for ground openingsyesno Warning Signsyesno Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisors Name: Attendants name: Permit issuers name: % oxygen:% lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescueryesno Continuous Gas Monitoryesno Barrier for ground openingsyesno Warning Signsyesno Confined Space Entry Permits and Hot Work Permits will be discussed in detail in other training sessions.

8 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Safe Work Permit Permit # Type: (hot work, confined space, line break, etc....location: Valid __/___/___ ____ __/___/___ ____Issued to: From: M D Y time to M D Y time Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Atm Combustible vapors or gases ( 19.5% & <21%) Toxic Material Concentration Tests Precautions Always Required: Safe Work Permit Permit # Type: (hot work, confined space, line break, etc....location: Valid __/___/___ ____ __/___/___ ____Issued to: From: M D Y time to M D Y time Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Atm Combustible vapors or gases ( 19.5% & <21%) Toxic Material Concentration Tests Precautions Always Required: The objective of the Safe Work Permit system is to identify hazards associated with a nonroutine job, and to develop precautions required to control each hazard identified.

9 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Lets begin with a look at the hazards associated with specific jobs, and examine how Safe Work Permits can help to prevent them from causing damage or injury.

10 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Examples of jobs requiring permits are: 1. Hot Work - the use of open flame, oxyacetylene burning, tar kettles, etc...., and the use of portable spark or heat producing equipment in flammable storage or handling areas. 2. Confined Space Entry 3. Excavations 4. Blasting 5. Whenever required by existing company or contractor procedures or required in the contractors Project Safety Plan. 6. Use of internal combustion engines, or vehicles with internal combustion engines inside company buildings. 7. Use of company owned equipment, such as personnel lifts, fork trucks, vehicles, etc., by employees of a contractor

11 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Excavations can result in: head Injuries from materials falling from overhead surfaces, rupture of high pressure hydraulic lines used on backhoes, shovels, and drills. excessive noise from concrete breaking and cutting equipment, and collapse of excavation walls and piles due to poorly secured soil, sudden weather changes, or other factors. Permits are written to ensure that necessary equipment is present and in good working order.

12 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Excavations : Poorly planned excavations can result in damage to underground services, such as electrical lines, natural gas lines, water lines, sewers and drains. The consequence of damaged service lines is often complete shutdown of operations resulting in major business losses. Permits are written to prevent damage to underground equipment and services.

13 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Excavations may expose hazardous materials, which have leaked and are contaminating the soil. Permits ensure that procedures to protect workers from exposure to toxic substances have been identified.

14 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Blasting can cause damage to adjacent operations and personnel. Permits are issued to ensure procedures are followed that prevent injury to neighboring facilities, equipment and employees.

15 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Internal combustion engines produce poisonous gases such as carbon monoxide, and oxides of nitrogen. Permits ensure that procedures are followed that will prevent equipment emissions from contaminating air inside buildings and confined spaces.

16 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Unauthorized use of company equipment can result in lost production and injury to untrained operators. Permits prevent company equipment from being taken by contractors without the permission of area management, and require verification of equipment operator training.

17 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Work which ordinarily does not require safe work permits may be included at the discretion of the Safety Representative, the Contractor, or the Contract Administrator.

18 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Following are examples of situations which may require discretionary safe work permits. There could be many others:

19 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Movement of large pieces of equipment, especially while other personnel are working nearby, can result in employee injury. Permits may be issued to ensure the use of procedures that will prevent employee injury from falling material, or being struck by rigging equipment.

20 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Abandoned tanks, pipe lines, drums, and vessels may contain hazardous vapors and gases. Permits may be issued to prevent toxic or corrosive exposures to workers when working on abandoned equipment, complementing hot work and confined space permits. ?

21 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Many construction processes create noise levels high enough to cause hearing loss. Permit requirements may be issued to reduce noise to acceptable limits, or to provide both construction and other employees with required hearing protection.

22 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Boilers, high pressure vessels, tanks, and reactors can undergo sudden failure resulting in disastrous consequences. Permits may be issued requiring precautions and equipment to prevent system failures not covered by safe job procedures or project safety plans.

23 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Permits may be required where the consequence of noncompliance with fall protection requirements is severe, or where dropped materials may endanger other workers below.

24 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Permits are required before work begins near energized lines which cannot be shut off if there is danger of fire, shock or electrocution.

25 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits CAUTION Hazardous Materials! Safe Work Permit Required! Permits are mandatory where signs are posted which require them.

26 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Safe Work Permit Permit # Type: (hot work, confined space, line break, etc....location: Valid __/___/___ ____ __/___/___ ____Issued to: From: M D Y time to M D Y time Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Safe Work Permit Permit # Type: (hot work, confined space, line break, etc....location: Valid __/___/___ ____ __/___/___ ____Issued to: From: M D Y time to M D Y time Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Permits are issued: -for a specific date and time range, -for a specific job, -and to specific individuals.

27 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Safe Work Permit Permit # Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Atm. Combustible Vapors or gases ( 19.5% & < 21%) Toxic Material Concentration Tests Permit Issued by: _________________________/____/___ Work Area Manager Approval _______________/___/__ Safe Work Permit Permit # Work Description:________________________________ ____________________________________________Supervisors Signature Print name ____________________________________________ ____________________________________________Work Order No. Atm. Combustible Vapors or gases ( 19.5% & < 21%) Toxic Material Concentration Tests Permit Issued by: _________________________/____/___ Work Area Manager Approval _______________/___/__ Permits must be reviewed and signed by: -the safety representative issuing the permit, -the workers supervisor, -affected workers, -and the work area manager.

28 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Safe Work Permit Precautions Always required: o Emergency procedures review by: o Emergency equipment & location review by: o Area inherent hazards review by: o Material Safety Data Sheet(s) review by: Safe Work Permit Precautions Always required: o Emergency procedures review by: o Emergency equipment & location review by: o Area inherent hazards review by: o Material Safety Data Sheet(s) review by: Workers must be informed of required emergency procedures, location and operation of emergency equipment,and area inherent hazards. Material Safety Data Sheets must be supplied and special precautions reviewed with workers and their supervision.

29 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Safe Work Permit Special Precautions Required: o Buddy Systemo Sprinklers in Service o Cleaning of _________ o Purging of ________ o Remove materials from ___________________ o Piping o Drain o Disconnect o Blank off / Capped o Clean o Ventilate o Remove combustibles from other side of wall. o Floor Swept Clean of Combustibles o Clean area within 35 feet. o Wet down floor. o Adjacent areas: __________________________ o Cover floor with: __________________________ o Non-combustible Tarpaulins or Metal Shields Over: o Electrical Switches or Valves off, locked-out, and Tagged: o Electrical Grounding of: ________________________ o Atmosphere monitored during work for: ____________ periodically: __________ continuously: __________ o Safety Monitor(s) present from _________ to _________ o Fire Watch Present during work and for 30 minutes after... o Respirator to be worn____ or be readily available ___ Safe Work Permit Special Precautions Required: o Buddy Systemo Sprinklers in Service o Cleaning of _________ o Purging of ________ o Remove materials from ___________________ o Piping o Drain o Disconnect o Blank off / Capped o Clean o Ventilate o Remove combustibles from other side of wall. o Floor Swept Clean of Combustibles o Clean area within 35 feet. o Wet down floor. o Adjacent areas: __________________________ o Cover floor with: __________________________ o Non-combustible Tarpaulins or Metal Shields Over: o Electrical Switches or Valves off, locked-out, and Tagged: o Electrical Grounding of: ________________________ o Atmosphere monitored during work for: ____________ periodically: __________ continuously: __________ o Safety Monitor(s) present from _________ to _________ o Fire Watch Present during work and for 30 minutes after... o Respirator to be worn____ or be readily available ___ Required special precautions must be clearly indicated and communicated to workers, and their supervision. It is the safety representatives responsibility to determine if and when special measures are required.

30 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Safe Work Permit Safety Equipment Required o safety glasses o hard hat o face shield o safety shoes o fire extinguishers - type ___ #___ size ___ o fire hose o supplementary illumination o warning signs o barricades o non-sparking tools o explosion proof equipment o safety harness o life line o tripod emergency escape unit o 2-way radio or phone o respirators o impervious gloves o protective clothing _____________________ o mechanical ventilation o shower & eyewash o self contained breathing apparatus o ground fault circuit interrupter o ladder / lift / scaffold o other________________________________ Safe Work Permit Safety Equipment Required o safety glasses o hard hat o face shield o safety shoes o fire extinguishers - type ___ #___ size ___ o fire hose o supplementary illumination o warning signs o barricades o non-sparking tools o explosion proof equipment o safety harness o life line o tripod emergency escape unit o 2-way radio or phone o respirators o impervious gloves o protective clothing _____________________ o mechanical ventilation o shower & eyewash o self contained breathing apparatus o ground fault circuit interrupter o ladder / lift / scaffold o other________________________________ Personal protective equipment and other safety equipment required is specified. For each hazard present at the work site, the safety representative must specify a hazard control.

31 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits Safe Work Permit EXCAVATION PRECAUTIONS REQUIRED: o Underground / Underfloor Utility Hazard Review o Soil Excavation Reviewed o Underground Utility Stakeout Performed o Excavation cut back 1/1, or walls reinforced o Means of exiting within 25 feet. Safe Work Permit EXCAVATION PRECAUTIONS REQUIRED: o Underground / Underfloor Utility Hazard Review o Soil Excavation Reviewed o Underground Utility Stakeout Performed o Excavation cut back 1/1, or walls reinforced o Means of exiting within 25 feet. The safety representative must verify that all underground utilities have been located and staked out. Provisions must be made to barricade the open trench, prevent collapse of trench walls, provide employees with a means of exit, reroute ground water, and all other requirements of excavating. If soil is contaminated, the safety representative will ask for a written safety and health plan.

32 R. Chiodi 03/25/1997 rev 04/16/2001 Safe Work Permits - SUMMARY -Hot work, confined space entry, excavations, blasting, use of internal combustion engines inside of buildings, use of company owned or leased equipment, and areas where Safe Work Permit Required signs are posted always require a safe work permit. -Other safe work permits may be required at the discretion of the Safety Representative, the Contract Administrator, or the Contractor. -Permits will be issued by a qualified safety representative. -Hot work permits are issued by the Fire Marshal. -Permits are issued to specific persons for a specific time period and for a specific job. -Permits must be signed at the time issued by the safety representative, job supervisor, affected workers, and the manager of the area in which work is being done.

33 R. Chiodi 03/25/1997 rev 04/16/2001 Where to Get Help? Your supervisor is responsible for providing equipment necessary to comply with Safe Work Permit requirements. The safety representative is responsible for completing the job hazard analysis and issuing the permit.