Work Breakdown Structure WBS

Slides:



Advertisements
Similar presentations
Project Control: Developing the As-Planned S-Curves
Advertisements

Building Codes, Zoning Ordinances
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Analysis and design of National Beverage Company(NBC)
PROJECT BREAKDOWN Construction stages can be broken down into many operations that define the major elements to be performed The Single Relationship Finish.
MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL
Concrete Construction Part 1
FORMWORK Prof Awad S. Hanna.
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
تکنیک های تجزیه کار فرشاد آقابزرگی هوش تجاری.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Project Management Session 7
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Prof. Awad Hanna Precedence Diagram Advantages of using Precedence Diagram: 1. No dummy activity are required. 2. A single number can be assigned to identify.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Work Breakdown Structure vA hierarchical system which sub-divides larger elements of the project into smaller elements called “work packages”.
Work Breakdown Structure Workshop
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Construction Specifications
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
Work Breakdown Structure WBS
1 Project Planning Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 4 2 nd Semester 2008/2009 UP Copyrights 2008 Construction.
PLANNING AND SCHEDULING
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
DEFINING THE PROJECT CHAPTER 4.
Adult Education and Literacy Budget Development and Cost Allocation.
Geog 469 GIS Workshop Project Management.
Formats ACT 380.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
Prof Awad S. Hanna Equipment Costs and Sources of E QUIPMENT C OST.
Estimating Project Time and Cost
W ORK B REAKDOWN S TRUCTURE (WBS). W ORK B REAKDOWN S TRUCTURE  A method to organize the project total scope of work in a hierarchical structure where.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
CVE 4070 Construction Engineering Project Budget & Cost Control Prof. Ralph V. Locurcio, PE.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
WBS Work Breakdown Structure © Unitec New Zealand.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Estimating and Scheduling CEE 492
MENG 446 : Management of Engineering Projects
Measuring Palestinian Labors Productivity
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Chapter 4 Defining the Project.
Using project records to show delay and disruption
CONCRETE PAVEMENTS.
Chapter 3 Managing the Information Systems Project
Awarding Criterion for late tender: the lowest bid- why?
4th Annual Construction Law Summit
PLANNING RESOURCES 1. Materials Need to determine 2. Equipment
Minuteman Vocational Technical Regional High School Progress
What Will You Learn 1. How To Plan Projects
Building Construction I Sofia Sebastian 1
THE HIERARCHY OF SCHEDULES
Masonry Bearing Walls.
6th. Semester Schedule: 1st. Week
Presentation transcript:

Work Breakdown Structure WBS Prof Awad S. Hanna

Work Breakdown Structure (WBS) A hierarchical system which sub-divides larger elements of the project into smaller elements. The smallest unit of the WBS is the work package. Prof Awad S. Hanna Prof Awad Hanna

Work Breakdown Structure Example Level Work Breakdown Structure Level Description 1 Warehouse Total Project 2 Administration Mobilization/ Demobilization Masonry Wall Steel Columns & Joints Roof System Subproject 3 Sitework Footing Floor Slab Masonry Wall Steel Columns & Joints Roof System Interior Finishes Category of Work 4 Excavate Footings Form & Reinforce Footings Place Footings Work Package 5 Labor Material Equipment Resources Prof Awad S. Hanna

WORK BREAKDOWN STRUCTURE (cont.) The scope of work in each work package should be defined to avoid overlaps and omissions between work packages. Work packages should be defined in terms of design, construction methods, and completion requirements, with associated performance dates Prof Awad S. Hanna

Scope of Work Packages Each work packages should be: 1. Manageable Specific authority and responsibility can be assigned. 2. Independent With minimum interfacing or dependence on other elements. 3. Measurable In terms of progress. Prof Awad S. Hanna

The Project Cost System Objectives of Establishing Project Cost System. 1. Keep the construction costs of the project within the established budget. 2. Develop labor and equipment productivity information for estimating the cost of future work. Prof Awad S. Hanna

Cost Code Project Number Area Code Work Type Code Distribution Code 9708B 05 03157.20 3 Cost Code for stripping concrete formwork for bridge deck (Labor). Prof Awad S. Hanna

Project Number 9708B 05 03157.20 3 Eighth project in 1997 (Bridge) Prof Awad S. Hanna

Area Code 9708B 05 03157.20 3 Geographic location OR Associate Field Cost to Specific supervisor or Management Prof Awad S. Hanna

Work Type Code 9708B 05 03157.20 3 03 Concrete 0315 Concrete Formwork 03157 Wood Concrete Formwork 03157.20 Wood Concrete Formwork for Deck 03157.30 Wood Concrete Formwork for Abutment Prof Awad S. Hanna

Distribution Code 9708B 05 03157.20 3 1. Total 2. Material 3. Labor 4. Equipment 5. Sub-Contract Prof Awad S. Hanna

Cost Code and Cost Control All items of expense are charged to the project where they are incurred. "General" or "miscellaneous" cost accounts should not be used, is poor practice, and should be avoided. The cost code is to serve its basic purpose, it must be understood and used consistently by all company personnel. Prof Awad S. Hanna

COST ACCOUNTING REPORTS Cost report intervals are a function of the project size, nature of the work, and the type of contract involved. There must be a balance between the cost of generating the reports and the value of the management information received Prof Awad S. Hanna

COST CODES The most widely used cost codes are Masterformat, CSI (Construction Specifications Institute) Uniformat, UCI (Uniform Construction Index). Masterformat is widely used software companies and government agencies. Prof Awad S. Hanna

Most contractors match their cost control system to their payroll periods and to their time-monitoring system. Prof Awad S. Hanna

COST CODES (cont.) Masterformat Uniformat Has 16 divisions Divisions were developed according to trades Uniformat Has 12 divisions Tends to follow the progress of construction Prof Awad S. Hanna

Relationship Between UNIFORMAT & MASTEFORMAT Prof Awad S. Hanna

UNIFORMAT Level A and B Prof Awad S. Hanna