MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL

Similar presentations


Presentation on theme: "MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL"— Presentation transcript:

1 MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL
Civil Engineering 239 MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Spring 2011 Eddie Aquino, Jimmy Fu, Alvin Sarmiento

2 PROJECT TEAM Eddie AQUINO Jimmy FU Alvin SARMIENTO
PROJECT MANAGER/3D MODELLER Jimmy FU PROJECT ENGINEER/ CONSTRUCTION SITE LOGISTICS Alvin SARMIENTO PROJECT ESTIMATOR/SCHEDULER

3 PROJECT REQUIREMENTS Three-story office building w/ underground garage
Concrete waffle slab Spread footings Structural Steel framing with steel deck Penthouse structure CMU Steel joist roof Construction budget 10.5 million – 12 million

4 PROJECT LOCATION COMPONENT Street Looking Southeast COMPONENT Street
Looking Southwest

5 PROJECT LOCATION 2.60 Acres IP (PD) URBAN Freeways

6 3D MODEL PDF Simulation

7 Cost Estimates Timberline Sage
Ranked most used estimating software by ENR Primavera AutoCAD Timberline MS Project

8 Cost Estimates Features CSI MasterFormat
Provides detailed labor, material, and equipment cost estimates Provides total cost/unit and total amount per item

9 Cost Estimates Problems Encountered Can not access Division 10-16
Mechanical and Electrical Systems

10 Cost Estimates Problems Encountered
Final cost estimates from Timberline does not match cost estimates given in excel sheet

11 Schedule MS Project Timeline: January 27, 2011 – January 6, 2012
RS Means 2002 and Golden Bear Construction Inc. RS Means Office Building Schedule Superstructure Garage Measurement Daily Output based on RS Means production Approximate Completion Structural Steel Columns/Beams 114 Tons 14.4 Tons 8 days 1st Floor Metal Deck 18,900 SF 3,500 SF 6 days Concrete Fill Over Metal Deck 8,640 SF 3 days Waffle Slab 2,380 SF Fire Proofing 3,000 SF 7 days

12 Schedule

13 Schedule Accuracy of schedule and duration of project Advantages
Each activity has a predecessor At any time during schedule, one or more activities can occur Advantages Simple to use Disadvantages Activities may not have any predecessor or successor

14 CONSTRUCTION SITE

15 CONSTRUCTION EQUIPMENT
ACTION MOBILE INDUSTRY MODEL 1250 (46’x12’) LINDEN COMANSA LC 500 Series


Download ppt "MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL"