Redesign of a Safety Syringe

Slides:



Advertisements
Similar presentations
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Advertisements

Personal Support Plan Forms The following slides (12 in this file and 12 in file 2) are the forms that have been created for the Personal Support Plan.
Redesign of a Safety Syringe University of Pittsburgh Senior Design – BioE 1160/1161 Jessica Chechak Jason Keiser Ellsworth Weatherby April 18, 2005.
January 6. January 7 January 8 January 9 January 10.
SPP/APR - SSIP Stakeholders Meeting # 3 (State Performance Plan / Annual Performance Report – State Systemic Improvement Plan)
Environmental Innovation Challenge 2010 Emer Dooley Oct 5 th 2009 Innovation in Clean-Tech + Market Opportunity = Solutions for the Planet.
Project Status E911 Provisioning System Royal Flush Software Kevin Francis, Jason Plaisted, Jessica St. Croix, Mike O’Connor, Derrick Hudson.
Harris JTRS Project The A-Team Garrett Wampole Ben Litchfield Jason Offord Jason Gillman David Bryant.
Information Architecture Week 15. Information Architecture CALENDAR.
Modern U.S. History II Capstone Project. For the next week and a half we will be working on your semester capstone project. This will count as your semester.
Brainstorming & Project Management
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
P ROJECT S TATUS Digital Photography 101: Beyond the Auto Setting Group A Matt Griffin – Samirah Hassan Catrise Overby – Stephanie Ward.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAY March 16March 17March 18March 19March 20 Signing up for roles ACT III 1 st period Discussing ideas Planning ACT III.
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
{ IAFF 6159: 10 Interdisciplinary Seminar on International Science & Technology Policy Spring 2013: Syllabus.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Web Site Redesign Homepage Committee February 2005.
Resear ch Paper topics You may choose one of the following…
Market Operations Standing Committee January 22, 2003.
Marketing and Sales Production Process. Summary 3 Phases Conceptual Production Execution Roles Sponsor, Producer, Analyst, Senior Executive, Executive,
Video Editing Lesson 11. Modules 11.1Review deliverables 11.2Edit videos 11.3Put together business plan 11.4Continue working on prototype.
Middle States Accreditation – update at Town Hall, 2/19/2014 Middle States Accreditation: Update at Town Hall Meeting February 19, 2014.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Revised 5/3/06. 2 Communications Timeline 1QO7 Town Hall 2007 MayJunAprJulAugSepOctNovDecJanFeb Mar2008 March Newsletter 3QO7 Town Hall 4QO7 Town Hall/Holiday.
Principal’s Mid-Year Writing Report Johanna Pscodna Keicher Elementary Michigan Center.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
SunSatFriThursWedTuesMon January
The Writing Process. A PROCESS is the series of steps you go through to achieve a final result.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
Culminating Project Graham-Kapowsin High School Bethel School District.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
Redesign/ Change Management Team 3. Point of Actions  Joint Application Design (JAD) session (2 weeks)  Representatives from each department  Overview.
Every Student Succeeds Act January Christopher Woolard Senior Executive Director, Center for Accountability and Continuous Improvement Colleen D.
Redesign of the Safety Syringe Jason Keiser, Jessica Chechak, Ty Weatherby BioE /25/05.
Mapping Your Future Technology Literacy 1 Semester 2 Overview Spring 2003.
Refine Preliminary Design. Schedule Week 9 - Refine Preliminary Design Week 10 – Test/Evaluate Design Week 11 – Continue Final Design, Fabrication Updates.
Page 1August 9, 2000Market Information Forum Market Information Forum ADS Phase 2 Update Presentation to Stakeholders Greg Ford and Kristen Kelley.
On Campus Internship Work Plan Creation
Recommendation of Texas Test Plan Team to RMS
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Analyzing Author Intent and Meaning
February 28 Assignments HW #8, 9, and 10 assigned Implementation plan
This file is intended to be used with the blog post “Tabs in PowerPoint” at You may not.
API 17X Subsea Boosting January 13, 2015
PPAS/POLS 3190 Winter Term Week 1.
NANC Report Numbering Oversight Working Group (NOWG)
HCIS 410 ASSIST Education Your Life-- hcis410assist.com ENV 340 STUDY.
Timeline Tool Kit December 25, 1946
Plan on a Post-It Think about how you might start to share your learning from the UNSW Professional program with others. Jot down your early ideas, and.
FFM TC status Thinh Nguyenphu as FFM TC Chair NSN
Tracking new discoveries using file history
Guidelines for Resident Quality Improvement Project
DAD: PMI Action Team District Assessment and Data for the purpose of Progress Monitoring and Intervention February 14, 2012.
College Essay Rough Draft
Children’s Hospital Update
The Creative Process.
Unit 15: Learning Objective 2
Monument & Transportation Plan Coordinating Committee Report Out
World Geography Course Team Content and Testing Dates
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
Next Steps on the §309 Regional Technical Support Document April 2003
MPATE-GE 2626: Thesis in Music Technology Spring 2019
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
Port Back Data Collection & Transition
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Port Back Data Collection & Transition
Calendar Overview – Phase I – REVISED April 2019
Port Back Data Collection & Transition
Presentation transcript:

Redesign of a Safety Syringe Jessica Chechak Jason Keiser Ty Weatherby

Thus Far… Creation of Design History File (last Semester) Rough Draft of SBIR Phase I Application (last Semester) Completed Design (mid February) Completed Design Review (mid February) Ordered Prototype (end of Feb) Received Prototype (first week of Mar)

Current Design

Current Design

Marketed Products Our design is a compilation of 2 current designs and our ideas Most marketed products only have 1 safety feature – we have 3 Demonstration…

My Role… Scheduling Team Meetings Writing Sections A and C of the SBIR Phase I Application Editing SBIR Phase I Application Updating Controlled Documents Testing of Prototype Creation of Final Powerpoint Presentation

What’s Next… Begin Functionality Testing (ASAP) Order 3 more prototypes if initial test passed Redesign if initial test is not passed Continuation of Testing with New Prototypes (March) Complete Revision of Controlled Documents (pre-testing and post-testing) Revise SBIR Phase I Application (by April) Create Powerpoint Presentation (by April)

Any Questions?