TRD GAS SYSTEM PRR Gas System Integration Gas building

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Mechanical Plan Review. Review Plan Package Use Group/Occupancy Correct Code Reference/Conformance Revisions Mechanical Plans/Spec Books Structural Plans.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Scenario for the gas system 1.High cost gas (5 €/l of Xe) 2.High hydrostatic pressure over 7 m height 3.Light and large detectors, no big under- or.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
22/07/2003TOF Gas System PRR (C. R. Gregory) 1 TOF GAS SYSTEM Production Readiness Review SYSTEM INTEGRATION.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Demineralised water cooling system
DT-LHCb coordination meeting 18 April 2016
Gas Schedules
Francois and Lau EATM 17 July 2012
LS1 planning meeting
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
LST Installation Readiness Review
Mechanics: (Tim).
SBN Far Detector integration model overview
Aachen Status Report: CO2 Cooling for the CMS Tracker
R. Guida PH-DT-DI Boston Students Program CERN, 16/1/2013
Fiber Installation for RUN 3&4
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
ALICE 5 o’clock meeting Wk
Design of Distribution Feedbox at LHC P7
Stainless Steel Water Well Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Well Repair Installation of Well Liners
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
Aachen Status Report: CO2 Cooling for the CMS Tracker
PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Mini Case Study Hotcat (Knottingley)
Gases Fastest Moving Particles Not definite shape Not Definite volume
Mini Case Study Hotcat (Ganstead)
Presentation transcript:

TRD GAS SYSTEM PRR Gas System Integration Gas building Plug area (PX24) Underground cavern (UX25) On Detector 03/11/2003 TRD Prouction Readiness Review

GAS Building The existing Gas Building at Point 2 has been upgraded A new primary gas storage and distribution system has been installed The TRD gases are to be supplied up to panels in the mixing room Seen on the following layouts 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review PRIMARY GAS DISTRIBUTION FLOWSHEET 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review LAYOUT IN GAS BUILDING 03/11/2003 TRD Prouction Readiness Review

Layout on Plug (PX24) Layout in UX25 SYSTEM LAYOUT Layout on Plug (PX24) Layout in UX25 Existing pipework will be re-used as far as possible All pipework will be Stainless Steel Butt welded 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review GAS SYSTEMS ON PLUG (PX24) 1 TRD gas system 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review GAS SYSTEMS ON PLUG (PX24) 2 TRD gas distribution units Pressure regulation Distribution Compressor Existing pipes from gas building New capillary Pipes to detector 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review Gas Distribution in UX25 All pipes pass into L3 volume on RB24 side Note tight bending radii through doors 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review TRD pipes up to the Detector Gas pipes from Plug (PX24) To detector 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review PIPES FROM PLUG TO DETECTOR 1 From distribution on Plug Distribution on Baby Space Frame 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review Pipes around Baby Space Frame 1 Pipes from Plug PX24 03/11/2003 TRD Prouction Readiness Review

TRD Prouction Readiness Review Pipework on Detector Pipes from Plug TRD detector Pipes on frame have to be Distributed to allow easy removal of TRD and TOF modules 03/11/2003 TRD Prouction Readiness Review