SBN Far Detector integration model overview

Similar presentations


Presentation on theme: "SBN Far Detector integration model overview"— Presentation transcript:

1 SBN Far Detector integration model overview
Justin Tillman September 28th, 2016

2 THE SBN-FD EXPERIMENT BUILDING CONSISTS OF 4 MAIN AREAS
THE SBN-FD EXPERIMENT BUILDING HAS AN OVERALL FOOTPRINT OF 21.3M X 38.1M THE SBN-FD EXPERIMENT BUILDING CONSISTS OF 4 MAIN AREAS BUILDING EXTERIOR DEWARS EXTERIOR CRYOGENICS INLINE FILL FILTERS REGENERATION COMPONENTS GRADE LEVEL: METERS ABOVE SEA LEVEL (742’) LOADING DOCK OVERBURDEN SHIELDING COMPRESSED AIR SKID MEZZANINE LEVEL: METERS ABOVE SEA LEVEL (727’) RACKS, CABINETS, MISC. ELECTRONICS ENCLOSURE LEVEL: METERS ABOVE SEA LEVEL (713’) DETECTOR MISC. ELECTRONICS JUSTIN TILLMAN WA104 MEETING 9/28/2016

3 SBN-FD BUILDING EXTERIOR
NORTH UPSTREAM DOWNSTREAM REMOVABLE WALL FOR COLD VESSEL INSTALL EXISTING NOVA BUILDING ACCESS ROAD JUSTIN TILLMAN WA104 MEETING 9/28/2016

4 SBN-FD BUILDING SECTION
OVERBURDEN SHIELDING EXTERIOR CRYOGENICS ALLOCATED SPACE FOR PROXIMITY CRYOGENICS DETECTOR WITH CRT’S JUSTIN TILLMAN WA104 MEETING 9/28/2016

5 SBN-FD BUILDING LARGE EQUIPMENT ACCESS
JUSTIN TILLMAN WA104 MEETING 9/28/2016

6 SBN-FD BUILDING SECTION
UTILITY SHAFT/TUNNEL HVAC SUPPLY O.D.H. EXHAUST DUCT ELECTRICAL CONDUITS CRYOGENIC PROCESS PIPING GAS VENTING SBN-FD BUILDING SECTION NORTH HVAC SUPPLY DUCT O.D.H. EXHAUST MAKE UP AIR LOUVER GRADE LEVEL O.D.H.=0 9.4 M 3.3 M MEZZANINE LEVEL O.D.H.=1 4.3 M .61 M ENCLOSURE LEVEL O.D.H.=1 JUSTIN TILLMAN WA104 MEETING 9/28/2016

7 SBN-FD BUILDING DIMENSIONS
(GRADE LEVEL) NORTH 36.3 M 2.2 M 18.1 M 16.6 M 2.2 M 5.2 M JUSTIN TILLMAN WA104 MEETING 9/28/2016

8 SBN-FD BUILDING DIMENSIONS
2) 30 TON CRANES NORTH 4.7 M 28.6 M 3.2 M 10.7 M JUSTIN TILLMAN WA104 MEETING 9/28/2016

9 SBN-FD BUILDING DIMENSIONS
(MEZZANINE LEVEL) NORTH 30.1 M 3.1 M 17.7 M 1.5 M 1.2 M 3.1 M 6X 6.7 M 2X 8.2 M JUSTIN TILLMAN WA104 MEETING 9/28/2016

10 SBN-FD BUILDING DIMENSIONS
NORTH SBN-FD BUILDING DIMENSIONS (ENCLOSURE LEVEL) 30.1 M 1.8 M 4.9 M 14.1 M 8.1 M 1.8 M 6X 6.7 M 2X 8.2 M JUSTIN TILLMAN WA104 MEETING 9/28/2016

11 SBN-FD OPEN SPACE (ENCLOSURE LEVEL) NORTH 4.2 M 1.8 M 1.1 M 1.8 M
JUSTIN TILLMAN WA104 MEETING 9/28/2016

12 AIR COMPRESSOR/DRYER SKID
GRADE LEVEL EQUIPMENT AIR COMPRESSOR/DRYER SKID LN2 DEWAR LAr DEWAR HVAC UNIT NORTH LOADING DOCK OVERBURDEN SHIELDING 4.4 M THICK JUSTIN TILLMAN WA104 MEETING 9/28/2016

13 MEZZANINE LEVEL TELECOM EQUIPMENT
MISCELLANEOUS ELECTRICAL PANELS & TRANSFORMERS CONTROLS/PLC’s CABINETS & WORKSTATION NORTH RED AREAS INDICATE ZONES THAT HAVE EITHER BEEN PREVIOUSLY CLAIMED OR NEED TO STAY CLEAR OF ANY EQUIPMENT. NORTH JUSTIN TILLMAN WA104 MEETING 9/28/2016

14 MISCELLANEOUS ELECTRICAL PANELS & TRANSFORMERS
ENCLOSURE LEVEL MISCELLANEOUS ELECTRICAL PANELS & TRANSFORMERS O.D.H. EXHAUST DUCT 3X WELDING RECEPTACLE NORTH JUSTIN TILLMAN WA104 MEETING 9/28/2016

15 INTERIOR PIPE ROUTES GAr VENT: 12” SCH10 PIPE (DN300) GN2 VENT
4” SCH10 INSULATED PIPE (DN100) LAr & LN2 SUPPLY O.D.H. EXHAUST DUCT  1.07 M HVAC SUPPLY DUCT JUSTIN TILLMAN WA104 MEETING 9/28/2016

16 LOCATION OF EXTERIOR EQUIPMENT & PIPE ROUTING
LN2 DEWAR LAr DEWAR NORTH LAr SUPPLY PIPING LN2 SUPPLY PIPING GAr SUPPLY PIPING (MAKE UP GAS) REGENERATION PIPING LN2 P.B.L. VAPORIZER LAr P.B.L. VAPORIZER LAr PRESSURE BUILDING LOOP LN2 FILL LAr FILL REGENERATION TUBE TRAILER INLINE FILL FILTER SKID (REPRESENTATION) JUSTIN TILLMAN WA104 MEETING 9/28/2016

17 (REMOVABLE WALL PANEL NOT SHOWN FOR CLARITY)
TYPICAL PIPE SUPPORT (REMOVABLE WALL PANEL NOT SHOWN FOR CLARITY) TYPICALLY CONSTRUCTED FROM STRUT CHANNEL TO ALLOW QUICK & EASY MODIFICATIONS IN THE FIELD. HOWEVER, SOME SUPPORTS WILL END UP BEING WELDMENTS. STEEL BAR GRATING JUSTIN TILLMAN WA104 MEETING 9/28/2016

18 IN CONCLUSION, I WOULD LIKE TO STATE THAT I AM THE CUSTODIAN OF THE MASTER INTEGRATION 3D MODEL. I WOULD LIKE TO REQUEST THAT COLLABORATORS CONTACT ME IN ORDER TO RESERVE SPACE FOR ALL NECESSARY COMPONENTS SUCH AS: SUB-SYSTEMS CRYO COMPONENTS RACKS CABINETS CABLE TRAY ROUTES IF THERE ARE 3D SOLID MODELS OF REQUIRED COMPONENTS, PLEASE SEND ME A STEP FILE OR PARASOLID SO THAT I CAN IMPORT IT INTO MY MODEL AND VERIFY THAT THERE ARE NO INTERFERENCES. THE AVAILABLE OPEN SPACE WITHIN THE FAR DETECTOR BUILDING IS BEING DISTRIBUTED ON A FIRST COME, FIRST SERVE BASIS. JUSTIN TILLMAN JUSTIN TILLMAN WA104 MEETING 9/28/2016