BIM EXECUTION PLANNING PROCESS

Slides:



Advertisements
Similar presentations
BIM Education at Stanford University
Advertisements

CONTENTS Accuracy of Construction Cost Estimating 00 Abstract
East Hampton High School July 2013 – July 2014 Design Phases.
Building Information Management (BIM)
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
LAX Development Program Management Update BIM TECHNOLOGY 08/03/2009.
BIM EXECUTION PLANNING PROCESS
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Project Execution Planning for Building Information Modeling A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction.
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
Web Development Process Description
1 Software Process Lecture Outline Nature of software projects Engineering approaches Software process A process step Characteristics of a good.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
ITEC224 Database Programming
Capital Project Process
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
A State Perspective Mentoring Conference New Orleans, LA 2/28/2005 RCRAInfo Network Exchange.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
1.) Building Information Modeling The creation and use of coordinated, internally consistent, computable information about a building project in design.
CI R1 LCO Review Panel Preliminary Report. General Comments –Provide clear definition of the goals of the phase (e.g. inception), the scope, etc. in order.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
EVALUATION OF BIM-COBie DATA FOR FACILITY MANAGEMENT LOKESH MASANIA [] PROF. CARRIE DOSSICK PROF. KEN YU LIN.
ARCH653 Building Information Modeling in Architecture Wei Yan, Ph.D. Texas A&M University.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
Chapter 12 Building Information Modeling. Chapter 12 Building Information Modeling.
Camera PDR/CD1 Planning 19 September 2008
Fort Stanwix National Monument Energy Audit Contract
Façade Management Consulting
Compiler Design (40-414) Main Text Book:
7D 6D 5D 4D 3D bIM Dimensions bIM Services ESTIMATING
BIM EXECUTION PLANNING PROCESS
EXTRA SLIDES.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
How to Build a Great Team
BEEP Integrated Design Process for Energy Efficient Buildings
Pre-contract Planning and Practice
Estimating Capital Costs
Software Measurement Process ISO/IEC
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
DBIA Manual of Practice
FIVE PROJECT PHASES.
Directed Change Constructive Change
Presentation transcript:

BIM EXECUTION PLANNING PROCESS END PROCESS Schematic Design Contractor Cost Estimation Perform Cost Estimate Design Development Contractor Cost Estimation Perform Cost Estimate Construction Documents Contractor Detailed Map Perform Cost Estimate Operations Contractor Record Model Compile Record Model Schematic Design Architect 3D Macro Coordination Perform 3D Coordination Design Development Architect 3D Macro Coordination Perform 3D Coordination Construction Documents Architect 3D Macro Coordination Perform 3D Coordination Planning Owner Programming Validate Program Schematic Design Architect Design Authoring Author Schematic Design Schematic Design Architect Virtual Prototyping Develop Virtual Prototype Design Development Architect Design Authoring Author Design Development Design Development Architect Virtual Prototyping Develop Virtual Prototype Construction Documents Architect Detailed Map Author Construction Documents Construction Documents Architect Virtual Prototyping Develop Virtual Prototype Schematic Design Contractor 4D Modeling Create 4D Model Design Development Contractor 4D Modeling Create 4D Model Construction Documents Contractor 4D Modeling Create 4D Model Schematic Design Engineer Engineering Analysis Perform Engineering Analysis Design Development Engineer Engineering Analysis Perform Engineering Analysis Construction Documents Engineer Engineering Analysis Perform Engineering Analysis Construction Documents (WP) Schematic Design Design Development Program Model Architectural Model Schematic Design Cost Estimation Schematic Design 4D Model Schematic Design Engineering Analysis Model Architectural Model Design Development Cost Estimation Design Development 4D Model Design Development Engineering Analysis Model Architectural Model CD (MP) 3D Macro Coordination Model CD (MP) 4D Model CD (MP) Cost Estimation Record Model MEP Model MEP Model MEP Model Schematic Design 3D Macro Coordination Model Schematic Design 3D Virtual Prototypes Design Development 3D Macro Coordination Model Design Development 3D Virtual Prototypes CD (MP) Engineering Analysis Model CD (MP) 3D Virtual Prototypes CD (MP) 3D Micro Coordination Model Structural Model Structural Model Structural Model Civil Model Civil Model Civil Model

EXISTING CONDITIONS MODELING Geotechnical Report Historical Site / Facilities Information GIS Data Responsible Party Survey Existing Facilities Responsible Party Survey Existing Site Conditions Responsible Party Collect Current Site Conditions Data START PROCESS Responsible Party Compile Existing Conditions Information END PROCESS Responsible Party Collect Data through Photographs Responsible Party Laser Scan Existing Conditions Laser Scan Model Survey Model Existing Conditions Information Model

Incorporate Contingencies/ Overhead Establish Cost Estimates Cost estimation Cost Reports Analysis Method Cost Database Contractor Incorporate Contingencies/ Overhead NO NO NO Contractor Establish Cost Estimates Contractor Adjust BIM for Takeoff Model ready for QTO/Cost Analysis? Contractor Export BIM for Analysis Contractor Develop Quantities Schedule Contractor Review Quantities Results acceptable? Contractor Evaluate Methods for Assembly Construction Contractor Organize Quantities to Cost Data Contractor Calculate Costs from Quantities Contractor Review Costs/Results Contractor Incorporate Contingencies/ Overhead Results in compliance with cost target? START PROCESS YES YES YES END PROCESS 3D Model Quantity Takeoff for Assemblies Cost Estimate for Assemblies

4d modeling All Disciplines Set Construction Sequencing and Flow Productivity Information Lead Times All Disciplines Set Construction Sequencing and Flow All Disciplines Prepare/Adjust Schedule START PROCESS NO NO All Disciplines Establish Information Exchange Requirements All Disciplines Create New of Modify Previous 3D Model 4D Modeler Link 3D Elements to Activities All Disciplines Validate Accuracy of 4D Models Model correct? Schedule optimized? All Disciplines Review 4D Model/Schedule YES YES END PROCESS 3D Model Schedule (Draft) 4D Model (Draft) Schedule 4D Model

Site analysis Responsible Party Analyze Project Site Data Site Investigation Data Responsible Party Analyze Project Site Data Generate Site Analysis Model NO NO Responsible Party Analyze Area Data Responsible Party Select a Building Site Location Is site acceptable and available? Responsible Party Determine Building Location and Orientation Is building location acceptable? START PROCESS YES YES END PROCESS Site Analysis Model

programming Owner Identify Area Requirements Site Information Owner Identify Area Requirements Identify Building Use/Type Identify Cost Targets NOT ACCEPTABLE Owner Create Program Architect Generate Conceptual Building Layout Owner Identify Final List of Requirements Is site acceptable and available? START PROCESS Start Design Programming ACCEPTABLE END PROCESS Site Analysis Model Existing Conditions Model Program Model

Design authoring Architect Architect Architect Engineer Engineer Parametric Modeling Content Architect Create Construction Documentation Architecture Model Architect Create Schematic Design Architecture Model Architect Create Design Development Architecture Model Engineer Create Construction Documentation Model Engineer Create Schematic Design Structural Model Engineer Create Development Architecture Structural Model NO NO NO Does the model meet the requirements? Does the model meet the requirements? All Disciplines Identify Models Required All Disciplines Identify Content for Model Creation Architect Develop Initial Architecture Model Does the model meet the requirements? END PROCESS START PROCESS YES YES YES Engineer Create Construction Documentation MEP Model Engineer Create Schematic Design MEP Model Engineer Create Development Architecture MEP Model All Disciplines Create Other Models (as needed) All Disciplines Create Other Models (as needed) All Disciplines Create Other Models (as needed) Schematic Design Architectural Model MEP Model Structural Model Other Design Development Architectural Model MEP Model Structural Model Other Construction Documentation Architectural Model MEP Model Structural Model Other Program Model Preliminary Architecture Model

Design review Architect Create Virtual Mockups Architect/User Perform End User Review All Disciplines Compile Design Review Feedback Return to Design Authoring NO All Disciplines Compile Info for O & M Review Facility Manager Perform O & M Review Design acceptable? START PROCESS END PROCESS YES All Disciplines Compile Model for Constructability Review Contractor Perform Constructability Review Design Model Design Review Information

Energy analysis Construction Type Library Space Type Library Mechanical System Library Energy Takeoff Analysis Method Weather Data Contractor Assign Construction Types to Building Elements NO NO Responsible Party Adjust BIM for Energy Analysis Mechanical Engineer Assign Outside Design Criteria and Energy Targets Is model ready for simulation? Mechanical Engineer Export BIM for Analysis Mechanical Engineer Analyze Energy Demand and Consumption Mechanical Engineer Review Energy Analysis Results Mechanical Engineer Prepare Report for Documentation Results acceptable? START PROCESS YES YES END PROCESS Mechanical Contractor Create and Assign Thermal Zones Design Model Energy Analysis Model Note: This map was developed from a review of the bSa/OGC AECOO-1 Testbed Project

Structural analysis NO Generate Structural Layout Soil Data Wind Loads Seismic Loads Snow Loads NO Structural Engineer Generate Structural Layout Structural Engineer Generate Structural Design Model Structural Engineer Export Model to Structural Analysis Application Structural Engineer Analyze Model Is site acceptable and available? Structural Engineer Export Model to Structural Design Application Structural Engineer Update Structural Design Model START PROCESS YES END PROCESS Architecture Model Structural Design Model (Draft) Structural Analysis Model Structural Design Model

Lighting analysis Lighting Engineer Analyze Model for Daylighting NO Solar Data Weather Data Lighting Engineer Analyze Model for Daylighting NO Lighting Engineer Identify Lighting Criteria Lighting Engineer Generate Lighting Layout Lighting Engineer Generate Basic Lighting Model Lighting Engineer Export Model to Lighting Analysis Application Lighting Engineer Modify Model for Analysis Lighting Engineer Analyze Model for Lighting Levels Is building lighting acceptable? Lighting Engineer Export Model to Lighting Design Application Lighting Engineer Update Lighting Model START PROCESS YES END PROCESS Lighting Engineer Analyze Model for Density Levels Architecture Model Other Applicable Models Structural Model Lighting Design Model (Draft) Lighting Analysis Model Lighting Design Model

Design coordination BIM Coordinator Create Model Sharing System Company Implementation Standards Contract Requirements Information Exchange Requirements BIM Coordinator Create Model Sharing System BIM Coordinator Define Coordination Meeting Location All Disciplines Define Information for Discipline Models All Disciplines Create Discipline Models BIM Coordinator Compile Composite Model BIM Coordinator Perform Collision Detection Any collisions? All Disciplines Identify Solutions to Collisions START PROCESS Start Design Coordination Process YES NO All Disciplines Define the Areas of Coordination All Disciplines Develop Schedule for Coordination END PROCESS All Disciplines Establish a Protocol to Address Collisions Design Model Coordination Model by Discipline Coordination Model

Site utilization planning Schedule Construction Equipment Libraries Contractor Add Construction Equipment Contractor Analyze Site Layout for Phase Transition NO NO Contractor Identify Construction Phases Contractor Determine Temporary Facilities Are all phases analyzed (occurs for each phase)? Is plan acceptable? Contractor Distribute Plan to Various Parties START PROCESS YES YES END PROCESS Contractor Analyze Site Layout for Space and Time Conflict Contractor Insert Phased Staging Areas Design Model Existing Site Conditions Model Site Utilization Plan

3d control and planning NO NO Contractor Design Specifications and Intent Schedule, Cost, and Labor Info Construction Families and Libraries 3D Controls Report NO NO Contractor Determine Scope of Work to be Analyzed Contractor Identify Alternative Construction Methods Contractor Model Alternative Methods Contractor Analyze Various Methods Is model acceptable? Contractor Compare and Select Options Contractor Coordinate Construction Sequences Is construction sequence acceptable? Contractor Generate Construction Plans START PROCESS YES YES END PROCESS Design Model Site Utilization Model Construction Model

record modeling NO Owner Identify Information Requirements Equipment Information Project Submittal Information COBIE Requirements NO Owner Identify Information Requirements Facility Manager Compile Information Facility Manager Generate Additional Required Information Facility Manager Compile Information in FM Application Is model acceptable? START PROCESS YES END PROCESS Design Model Coordination Model 4D Model Record Model

Maintenance scheduling Sensor Information CMMS Information Warranty and Specification Information Productivity Information NO Facility Manager Collect Building System Data Facility Manager Interpret Data for Maintenance Needs Facility Manager Prepare/Adjust Schedule Responsible Party Perform Maintenance Responsible Party Validate Equipment Performance Correct? Facility Manager Regenerate Maintenance Data START PROCESS YES END PROCESS Record Model Schedule

Building systems analysis Sensor Data Other Performance Data Performance Targets Performance Costs Weather Data Facility Manager Interpret Data for Maintenance Needs NO NO Responsible Party Adjust BIM for Performance Analysis Is model ready for simulation? Responsible Party Prepare/Adjust Schedule Responsible Party Prepare/Adjust Schedule Facility Manager Perform Maintenance Facility Manager Validate Equipment Performance Results acceptable? START PROCESS END PROCESS YES YES Facility Manager Interpret Data for Maintenance Needs Energy Analysis Model Record Model Building Performance Analysis Model Building Performance Analysis Output