Comment Resolution Plan

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE P /187r1 Submission January 2009 Donald Eastlake 3rd, MotorolaSlide 1 TGs Los Angeles Closing Report Date: Authors:
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
A Proposed Timeline for IEEE ba TG
Closing Report Date: Authors: November 2008 September 2008
TGs Dallas Closing Report
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
TGax March 2017 Closing Report
TGs Process, July Date: Author: July 2009 July 2009
TGaf San Francisco Closing Report
TGs Atlanta Closing Report
January 2009 Closing Report
Mesh Frame Formats Date: Authors: June 2007 March 2007
TGaf Waikoloa Closing Report
TGs Process Date: Authors: July 2005 July 2005
Fix inconsistency in PLM specification
March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2016] Date.
TGs London Closing Report
TGs London Closing Report
Mesh Frame Formats Date: Authors: July 2007 March 2007
TGs Montreal Closing Report
Comment Resolution Plan
Comment Resolution Plan
TGaf Geneva Closing Report
IEEE ah Timeline Projection
TGs Process, July Date: Author: July 2009 July 2009
TGs Process Date: Authors: March 2005 March 2005
TGs San Diego Closing Report
TGaf Indian Wells Closing Report
Plans for an open implementation
Mesh Frame Formats Date: Authors: May 2007 March 2007
TGs LA Closing Report Date: Author: January 2011
TGaf San Antonio Closing Report
TGs Process, September Date: Author: September 2008
TGs Process, November Date: Author: November 2009
LB93 Unresolved RFI Comments
January 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2015] Date.
TGaf Waikoloa Closing Report
Mesh Frame Formats Date: Authors: June 2007 March 2007
RFI Hillsboro Date: Authors: February 2007 February 2007
Closing Report Date: Authors: September 2010 March 2010
TGs Process, July Date: Author: July 2009 July 2009
TGs Process, September Date: Author: September 2009
IEEE TGaf Palm Springs Closing Report
TGu Teleconference Motions
TGad March 2011 Closing Report
TGad May 2011 Closing Report
TGs Dallas Closing Report
2019 March TGba Closing Report
Link Metric Comment Resolution
TGs Process, March Date: Author: March 2009 March 2009
TGaf Orlando Closing Report
TGs Process, January Date: Authors: January 2007
RFI Hillsboro Date: Authors: February 2007 February 2007
Mesh Frame Formats Date: Authors: May 2007 March 2007
TGad Task Group Document Open Items
Mesh Frame Formats Date: Authors: July 2007 March 2007
TGaf San Antonio Closing Report
TGs Denver Closing Report
IEEE aj March Closing Report
TGs Taipei Closing Report
Mesh Frame Formats Date: Authors: May 2007 March 2007
IEEE aj May Closing Report
TGs Process, March Date: Authors: March 2008 March 2008
TGaq Closing Report Date: Authors: March 2015 March 2015
TGax November 2017 Closing Report
Presentation transcript:

Comment Resolution Plan January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 Comment Resolution Plan Date: 2009-01-15 Authors: Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 Abstract A plan to accelerate comment resolution and complete the standard within a reasonable time frame Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

Current situation Decent progress on comment resolution January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 Current situation Decent progress on comment resolution About 300 comments per meeting! General goodwill CID 288 is the only “vitriolic” comment CID 1772 is a compliment from the WFA Chair! Available implementations PLM & HWMP: open80211s SAE & AbbrHS: sourceforge Most contentious issue remains security Progress may not be enough to maintain level of interest Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

Projected timeline The first LB resolution lasted more than a year January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 Projected timeline 2006 2007 2008 2009 2010 2011 Draft D0.x Draft D1.x Draft D2.x Approval Informal comments Letter Ballot Sponsor Ballot Sponsor Ballot Letter Ballot Letter Ballot Letter Ballot RevCom The first LB resolution lasted more than a year The second LB received numerous value-add comments Recirculations are expected Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

Has anything changed since we started? January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 Has anything changed since we started? Large-scale, public access usage scenarios aren’t as prevalent as small-scale, “consumer electronics” usage scenarios The market focus has changed since 2006 We realize there is a hierarchy of mesh nodes (those collocated with an AP, the portals, the lightweight versions etc.) The only meaningful usage distinctions we can make are Home, small-office = not centrally managed Enterprise, campus = centrally managed and Support for AP/simple STA association “Pure” mesh link creation (no “association”) We must limit the scope of TGs Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

M M M M M M M M M M M January 2009 ISP 2. 3. STA STA 1. January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 Limited mesh (peer-to-peer security) World ISP Corporate network World Advanced mesh 2. Home gateway Corporate gateway 3. M M M Plain old BSS Home mesh M Corporate mesh M M Can of worms STA M STA Simple corporate mesh 1. M M Peer-to-peer “island” This MSTA could be the same device! (with some vendor specific add-ons to join a corporate mesh) M M Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

What we can do Address outstanding contentious problems January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 What we can do Address outstanding contentious problems We probably cannot afford to develop “new” solutions Address high-level objections from the Working Group Terminology is now more in line with the base standard Accelerate comment resolution Stick to a manageable plan If progress is not forthcoming, consider removal of feature Focus on simplification, not addition Prioritize meeting agenda “[It seems that] perfection is achieved not when there is nothing left to add but when there is nothing left to take away” Terre des hommes  Antoine de Saint Exupéry Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

Target timeline Produce a “consensus” draft in March 2009 January 2009 doc.: IEEE 802.11-09/0053r0 January 2009 Target timeline 2006 2007 2008 2009 2010 2011 Draft D0.x Draft D1.x Draft D2.x RevCom Sponsor Ballot Informal comments Sponsor Ballot Letter Ballot Letter Ballot Letter Ballot Approval Produce a “consensus” draft in March 2009 Expect limited adjustments thereafter Push for full comment resolution by end of 2009 Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)

Questions? January 2009 January 2009 doc.: IEEE 802.11-09/0053r0 Guenael Strutt, Motorola (et al.) Guenael Strutt, Motorola (et al.)