Txdot’s transportation program, 2018 Txapa annual membership meeting

Slides:



Advertisements
Similar presentations
Proposition 1 Formula Distribution Proposal for FY 2015 PRELIMINARY CONCEPT PROPOSITION 1 FORMULA DISTRIBUTION PROPOSAL FOR FY 2015 TxDOT/Stakeholder Working.
Advertisements

Transportation Funding Taskforce — Oct. 8, Governor’s Task Force on Modernizing Transportation Funding in Idaho 1 October 8, 2010.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
TEXAS TRANSPORTATION August 2012 The Honorable Larry Phillips Chairman, House Committee on Transportation.
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
Local Highway Technical Assistance Council Joint Senate and House Transportation Committees January
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
JULY 23,  Legislative Update ◦ Highway Trust Fund status ◦ Reauthorization proposals ◦ FY15 Appropriations  TTP Safety Funding  TTP Bridge Funding.
April 1, UPDATE Texas Business Leadership Council John A. Barton, P.E. – Deputy Executive Director.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Highway Program Financing July Michigan Allocations Federal Law + State Law + Michigan Policy = MDOT & Local Allocations of Federal Apportionment.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Ron Hall Tribal Technical Assistance Program Colorado State University
2006 Annual Report on the Status of the Implementation of Proposition 400 Management Committee 9/6/06.
Metro Cities Transportation Policy Committee August 10, 2015 Overview of Minnesota Highway and Transit Finance.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
2015 Unified Transportation Program (UTP) Update March 05, 2015 HOBBY MANAGEMENT AREA TRANSPORTATION UPDATE Texas Transportation Commission March 05, 2015.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
TxDOT UTP Category 3 Urban Area (Non-TMA) Corridor Projects Workshops.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Transportation Equity Act for the 21st Century TEA-21 Prepared by Iowa Department of Transportation September 1998.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Funding Target Formula 32.50% Total VMT (on and off State Hwy System) 22.19% Population 16.88% Lane miles (on System) 14.06% VMT (trucks only) 6.88% Percent.
State Route 99 Corridor Update Kome Ajise District 10 Director Caltrans.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Federal-Aid Funding County Highway Accountants Conference May 10, 2007 zpowerpoint/ProjManagersCriticalIssuesBOB Feb07.ppt.
Division of Budgets January 25, 2012 Budget and Allocation Capacity Update Presented to the California Transportation Commission Tab 13.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
2040 Regional Transportation Plan (RTP) Financial Plan Planning Council 2040 RTP June 4, 2015.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
DRAFT STIP Programming Process and Results.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Central Minnesota Area Transportation Partnership Primer Welcome
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Minnesota’s Municipal Transportation System
Funding Methodologies: Road Maintenance & Road Construction
River to Sea TPO Board Meeting September 28, 2016
Determine Reinvestment
ALDOT Pavement Preservation Policy
River to Sea TPO Board Meeting October 26, 2016
Category 2 Parameters Transportation Management Areas (TMA) – 200,000+ pop. 8 TMAs in Texas Austin Corpus Christi Dallas-Fort Worth El Paso Hidalgo County.
Oregon Freight Plan Amendment
Transportation Finance Legislation and Ballot Measures
ACEC of Arizona & ADOT Liaison Todd A. Emery, PE
VDOT TRANSPORTATION FUNDING UPDATE
Responsibilities and FUNDING
Transportation Improvement Program and Air Quality Conformity Analysis
Pavement Asset management section
TxDOT Near-term actions
TxDOt maintenance division update
Pavement Performance Measures In Georgia
LEGISLATIVE BRIEFING SERIES
River to Sea TPO CAC & TCC Meetings September 20, 2016
TRANSPORTATION SUMMIT
Town Council Strategic Planning Session
DRAFT (MOVE $100M) FUNDING CATEGORY WEST ($ IN BILLIONS)
Presentation transcript:

Txdot’s transportation program, 2018 Txapa annual membership meeting Bill Hale, P.E., Chief Engineer, TxDOT January 17, 2018

Pavement Condition Trends

Percent of Lane Miles by Pavement Type (FY 2018)

Condition Score for ACP Pavements

Distress Score for ACP Pavements

Ride Score for ACP Pavement

Preventive Maintenance Upcoming work for FY 18 Treatment Lane Miles Preventive Maintenance Overlays Less than 2” or & Seal Coats 29,000 Light Rehab Overlay Between 2" and 4” or Mill and Inlay between 2" to 4" 3,000 Medium Rehab Overlay Between 4" and 6" or Mill and Inlay between 4" to 6" 2,000 Heavy Rehabilitation Full Reconstruction or Mill and inlays Greater than 6” 1,000

TxDOT Organizational Chart

Proposed Program Funding Targets for December Update of 2018 UTP Category Allocations Proposed 10-YR Distribution Category 1- Maintenance $ 13,942,960,000 Category 2 -Metro and Urban Corridor Funding $ 12,152,110,000 Category 4 - Connectivity (Regional) $ 6,342,870,000 Category 4 - Connectivity (Congestion) $ 5,082,460,000 Category 5 - CMAQ (3 MPOs) $ 2,182,990,000 Category 6 - Bridge $ 3,406,350,000 Category 7 - Fed STP-MM (Large MPO) $ 4,335,730,000 Category 8 - Safety $ 3,313,920,000 Category 9 - TAP $ 849,800,000 Category 10 - Supplemental Transportation Projects $ 648,930,000 Category 11 - District Discretionary $ 1,072,530,000 Category 11 - Energy Sector $ 2,110,420,000 Category 12-Strategic Priority $ 5,052,680,000 Category 12-Strategic Priority (TexasClearLanes) $ 4,947,140,000 Total Allocated Funds $ 65,440,890,000 Non-traditional funds-not in base (Cat 3 and Fed Earmarks) $ 5,172,990,000 Total, All Funds $ 70,613,880,000 In the August adoption of the 2018 UTP, the planning scenario used did not incorporate the recent legislative requirement to address debt service repayment for Proposition 12 Bonds using Proposition 7 funds. The December update incorporates this reduction, 613.4M, applied proportionately against all categories not legislatively mandated.

Area Engineering Portfolio Built bottom up by project and a clear geographic link to Area Office, District and the State Portfolio ILLUSTRATIVE 100 CSJs $525M Area Engineering Portfolio 700 CSJs $20,000M District Portfolio 7,500 CSJs $75,000M State Portfolio Project Manager Portfolio No. projects1 10 CSJs Volume1 $300M Data source: District Master portfolio (updated by DCIS): Authorized amount Let Amount (equals Low Bid if let, or Est. Const. Cost if not let) Let Sch Stat Combined let year Logic: Programming level = summation of Let Amount or Authorized Amount of projects not yet let, excluding Let Sch Stat = “NC”, “FC” and “LX” CSJs reprogrammed – from district model, entered into sandbox by districts 1 Excludes Candidate PA projects and projects in construction Source: Source Dallas Integrated Portfolio, Central Integrated Portfolio 2/16/2015

Built bottom up from Districts to Entire State Rural District Statewide Urban District Metro District

UNIFIED TRANSPORTATION PROGRAM PLANNED FUNDING – GOAL Gas Tax, Prop 1, Prop 7, FAST ACT, Ending Diversions, etc. $ 70 Billion/10year = $7 Billion/year Design-Bid-Build (DBB): $55 to $60Billion /10years $5.5 to $6.0 Billion/year (Average) $460 Million/month to $500 Million/month Small (<$15Million) (80% total number of projects) Medium ($15Million to $50Million) (17% total number of projects) Large (>$50Million) (3% total number of projects) Design-Build (DB): $10 to $15 Billion/years $1.0 to $1.5 Billion/year (Average) 3 per year ( Minimum of $150Million/project)

Questions?