Fifth Standard Solar Project Complex

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Public Scoping Meeting December 3, 2012
Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Sacramento Local Agency Formation Commission (LAFCo) Draft Environmental Impact Report SMUD Amendment of the Sphere of Influence and SMUD Yolo Annexation.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
City of La Habra Heights CEQA Scoping Meeting Matrix Oil Field Redevelopment Project Environmental Impact Report April 16, 2014.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Draft Equine Ordinance POD
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
ODOE Presentations and EFSC Standards Presented by Max Woods and Sarah Esterson September 18, 2015.
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
1 Completing the CEQA Checklist Terry Rivasplata.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Solar Energy Research Center Project CEQA Public Scoping Meeting May 26, 2010.
Report On The Status Of The Remediation Of The Sonoma County Waste Tire Sites Board Meeting Agenda Item 4 February 18, 2004.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Prepared by: Alex Fisch Planning Services Division.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Public Meeting For Scoping Of An Environmental Impact Statement (EIS) For The Perham Resource Recovery Facility: Introductions Agenda Good evening, my.
Providence Saint John’s Health Center Phase II Project
Introduction to the California Environmental Quality Act (CEQA)
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
The Development Process
GREENHOUSE GAS EMISSIONS INVENTORY
Facebook Campus Expansion Project EIR
City of Los Angeles Department of Public Works Bureau of Engineering
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
City of Los Angeles Department of Public Works Bureau of Engineering
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
SEQRA as a Tool to Review Energy Projects
Environmental Assessment PUC Application Process
Butte County Board of Supervisors September 27, 2016
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Neighbourhood Meeting Mountainside Community Centre
Brackish Water Desalination Project Draft EIR
Final Environmental Impact Report
Draft Equine Ordinance
I Street Bridge Replacement Project
Draft Environmental Impact Report
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Fifth Standard Solar Project Complex EIR Scoping Meeting Applicant: EC&R Solar Development, LLC Lead Agency: County of Fresno September 27, 2017

Introduction and Welcome Tonight's purpose: To provide information on the EIR Process. To give you a brief overview of the proposed project. To get your input on the SCOPE OF THE EIR . To get your feedback on the list of topics to be analyzed in the EIR. To get your feedback on the alternatives to be analyzed in the EIR. Separate hearings will be held on the merits of the proposed project. September 27, 2017

Safety Moment Safe Exit Routes Dial 911

2 Overview of the Process 3 Explanation of the Project Agenda 1 Introduction 2 Overview of the Process 3 Explanation of the Project 4 Preliminary Scope of the EIR 5 Public Input on the Scope of the EIR

What is an EIR / CEQA An informational document designed to inform the public and decision-makes about potential environmental impacts of a project. A problem solving document that identifies ways to avoid or lessen impacts: Mitigation Measures Alternatives Environmental impacts are just one of the factors considered by the decision-makers when deciding whether or not to approve a project.

Role of the EIR Consultant To work with County staff to prepare a technical document that analyzes the environmental impacts of the proposed project, identify ways to lessen impacts, and which clarifies the environmental issues and choices. The EIR Consultant is not an advocate for a particular decision.

Our Goal To produce and EIR which accurately assesses the potential impacts of the proposed project. Identifies mitigation measures, to reduce impacts. Identifies impact-reducing alternatives. Addresses community comments and concerns. Provide the County's decision-makers with the information necessary to understand the environmental consequences of the proposed project, and the environmental trade-offs associated with the proposed project and the alternatives.

Steps in the EIR Process and Opportunities for Input NOP Develop Project Description and NOP 30 Day Public Review Public Scoping Hearing (THAT’S TONIGHT 9-27-2017) Project DEIR Admin Draft EIR Public Draft EIR 45 Day Public Comment Period Public Hearing Project FEIR Admin Draft Response to Comments MMRP Public Draft FEIR 15 Day Public Review FEIR Certification Hearing and Project Approval Agency Permitting Year 1 Estimated Timeline

How to Keep Informed Notices will be published in the local paper: Hanford Sentinel and Business Journal. The Draft EIR will be available at the County Government Building The NOP is currently available at the County Government Building. Copies have been sent to adjacent property owners. If you specifically request Notice in writing, the County will send you Notice.

Fifth Standard Solar Project Complex The primary components of the proposed project include: Fifth Standard Solar Facility (Fifth Standard): 150 MW PV solar Approximately: 1,400 acres Stonecrop Solar Facility (Stonecrop): 20 MW PV solar Approximately 200 acres Blackbriar Battery Storage Facility (Blackbriar): 20 MW battery storage facility Approximately 5 acres Other Project Improvements: Onsite substation 0.3-mile-long 230KV transmission line connecting to PG&E’s Gates Substation Project site security fencing Access roads and electrical equipment

Project Location

Topics Identified in NOP to be Addressed in the EIR Aesthetics Agricultural Hydrology and Water Quality Air Quality Land Use and Planning Biological Resources Mineral Resources Cultural Resources Noise Geology, Soils, and Seismicity Public Services Greenhouse Gas Emissions Transportation and Traffic Hazards / Hazardous Materials Tribal Cultural Resources Utility and Service Systems * Certain criteria within the topics listed above have been scoped out of further analysis.

Helping Us with the Scope If you think the NOP missed something, your comments help us most when you specify: The specific environmental topic you think needs to be addressed: Example: Potential impact of project on farming equipment movement. Why you think the project has the potential to result in a significant impact: Example: You know of a recent published report showing that an endangered species is present on the site that was not discussed in the NOP.

Next Steps…. Comment on the Scope of the EIR: NOP review and comment period begins September 15, 2017, and ends October 16, 2017, at 5:00 p.m. All comments must be received within the comment period. Next Opportunity to Comment: Draft EIR County Project Website: http://www.co.fresno.ca.us/viewdocument.aspx?id=74079 County Planner Contact: Fresno County Department of Public Works and Planning Attention: Christina Monfette 2220 Tulare Street, 6th Floor Fresno, CA 93721 cmonfette@co.fresno.ca.us