MINIMISING UNCERTAINTY IN PRODUCTION ESTIMATES DR MIKE ANDERSON GROUP TECHNICAL DIRECTOR THURSDAY 15 TH JULY 2010 1.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Scott's Winter Forecast ! How do I make a forecast?
PDAs Accept Context-Free Languages
EuroCondens SGB E.
Worksheets.
RWTÜV Fahrzeug Gmbh, Institute for Vehicle TechnologyTÜV Mitte Group 1 GRB Working Group Acceleration Pattern Results of pass-by noise measurements carried.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
STATISTICS Linear Statistical Models
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Whiteboardmaths.com © 2004 All rights reserved
Taher A. Sharif Department of Atmospheric science, University of AlFateh, Tripoli, Libya
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
2.11.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Break Time Remaining 10:00.
The basics for simulations
Factoring Quadratics — ax² + bx + c Topic
EE, NCKU Tien-Hao Chang (Darby Chang)
PP Test Review Sections 6-1 to 6-6
Frequency Tables and Stem-and-Leaf Plots 1-3
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Resistência dos Materiais, 5ª ed.
PSSA Preparation.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
9. Two Functions of Two Random Variables
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

MINIMISING UNCERTAINTY IN PRODUCTION ESTIMATES DR MIKE ANDERSON GROUP TECHNICAL DIRECTOR THURSDAY 15 TH JULY

OUTLINE OF PRESENTATION 2 1.Introduction to RES 2.Assessment of Energy Yield 3.Assessment of Uncertainty 4.Techniques for Minimising Uncertainty 5.Impact of Climate Change 6.Summary

3 KEY MILESTONES First wind farm, Carland Cross 15 x 400kW, 6MW 1992 King Mountain, Texas, worlds largest wind farm at 218MW 2001 Beaufort Court and first development of other renewable technologies and sustainable building design GW milestone; launch of on-site renewables businesses 2006 launch of Inbuilt 2007 passed 2GW and 3GW milestones 2008 passed 4 GW milestone

4 QUANTIFYING UNCERTAINTY 4

PRODUCTION ESTIMATES - METRICS 5 To quantify the future annual energy production (AEP) we need a metric. Depending upon the lender different metrics are used to size the debt. 10 year P % chance of exceeding your estimate. 10 year P90 – 90% chance of exceeding your estimate. 1 year P99 – 99% chance of exceeding your estimate. In sizing the debt each metric will be used with a different DSCR. Since the credit crunch lenders are now more interested in reducing their exposure so the P90 and P99 are becoming widely used. Compounded by Silly money financing stupid projects. 5

PRODUCTION ESTIMATES – EXAMPLE 6 For a typical UK onshore wind farm rated at 26 MW with a net capacity factor of 33.5% typical values are: Uncertainty (1 standard deviation) in 10 year estimate = 8.1% P50 (10 year) = GWhr/year (100%) P90 (10 year) = GWhr/year (89.6%) P99 (1 year) = GWhr/year (68.6%) Clearly uncertainty is having a large impact upon the P90 and P99 AEP estimate. 6

TYPICAL ONSHORE UK WIND FARM LAYOUT 7

ASSESSMENT OF ENERGY YIELD – MAJOR COMPONENTS 8 Net Yield Long Term Wind Resource Wind Flow Model Turbine Model Wakes Loss Electrical Loss Adjustment Factors Reference Net 85%

ASSESSMENT OF ENERGY YIELD – UNCERTAINTY ELEMENTS 9 Net Yield Long Term Wind Resource Wind Flow Model Turbine Model Wakes Loss Electrical Loss Adjustment Factors 5.7% 2.4% 1.5% 0.8% 0.4% 2.0% 8.1% Reference Net 10 year time horizon

WIND SPEED MEASUREMENT – CHOICE OF INSTRUMENTATION 10 Good Practise (+/-3.0% in energy Poor Practise (+/-7.0% in energy)

WIND SPEED MEASUREMENT – EFFECT OF HEIGHT 11 Uncertainty Increase in uncertainty for every 10m difference in height is 1% in wind speed and ~2% in energy

LONG TERM WIND SPEED ESTIMATE REQUIRES EITHER A LONG RECORD OF ON-SITE MEASUREMENTS (>4 YEARS) OR CORRELATION WITH AN EXISTING REFERENCE STATION USING A NUMERICAL TECHNIQUE CALLED MEASURE CORRELATE PREDICT (MCP) 12

13 LONG TERM WIND SPEED ESTIMATE - MCP Measure wind speed and direction on site for minimum 12 months. Correlate to concurrent data from a reference site with a long-term record of wind data (10-20 years), e.g. met station or airport. Predict the long-term wind speed on site by applying the derived correlation to the historic data from the reference site and combine statistically with the site measured data. Reference site Wind Farm site Concurrent dataHistoric data

LONG TERM WIND SPEED ESTIMATE 14

LONG TERM WIND SPEED ESTIMATE - UNCERTAINTY 15 GoodPoor Instrumentation1.5%3.5% Data collected3 years6 months Reference period10 years3 years Extrapolation to hub height0%3% Error in Long Term Estimate3.3%6.9% Error in Energy Production 5.7%11.9%

16 ENERGY YIELD ASSESSMENT – TREE UNCERTAINTY CAN BE MINIMISED BY MEASURING AT HUB HEIGHT AND AT MULTIPLE LOCATIONS 16

ENERGY YIELD ASSESSMENT – FLOW MODEL UNCERTAINTY 17

18 Flow models are normally used to calculate the flow around the site. These models are initiated from one or more fixed mast locations. The errors in the model increase with terrain complexity and distance from the mast location. ENERGY YIELD ASSESSMENT – FLOW MODEL UNCERTAINTY These errors are difficult to quantify but are in the range 2% to 5%. Single Mast

TYPICAL OFFSHORE UK WIND FARM LAYOUT 19 Multiple Masts Single Mast 1 mast ~15% 2 mast ~10% 3 mast ~7%

THE IMPACT OF UNCERTAINTY UPON DEBT (Change to 10 year P90) MW Offshore wind farm (40% capacity factor) ScenarioP90 +2%P90 +1%BaseP90 -1%P90 -2%P90 -5% P50 Energy Yield (MWh/year)1,752,000 P90 Energy Yield (MWh/year)1,576,8001,559,2801,541,7601,524,2401,506,7201,454,160 Debt (£k)1,342,5391,324,7561,309,8011,286,4691,274,3541,222,300 Total Equity Requirement (£k)429,781446,299460,190481,862493,116541,467 Debt Proportion (%)75.80%74.80%74.00%72.80%72.10%69.30% Change in Debt (£k)32,73814, ,332-35,447-87, MW Onshore wind farm (35% capacity factor) ScenarioP90 +2%P90 +1%BaseP90 -1%P90 -2%P90 -5% P50 Energy Yield (MWh/year)77,400 P90 Energy Yield (MWh/year)69,44868,67467,90067,12666,35264,030 Debt (£k)38,93638,37037,80437,24036,64634,915 Total Equity Requirement (£k)17,81818,34418,86919,39419,94521,553 Debt Proportion (%)68.60%67.70%66.70%65.80%64.80%61.80% Change in Debt (£k)1, ,158-2,889

THE IMPACT OF UNCERTAINTY UPON DEBT (Change to 1 year P99) MW Onshore wind farm (35% capacity factor) ScenarioP99 +2%P99 +1%BaseP99 -1%P99 -2%P99 -5% P50 Energy Yield (MWh/year)77,400 P99 Energy Yield (MWh/year)56,31255,32654,29753,23052,13048,670 Debt35,37334,48733,54532,60431,60828,574 Total Equity Requirement21,12821,95022,82623,70024,62627,443 Debt Proportion (%)62.60%61.10%59.50%57.90%56.20%51.00% Change in Debt (£k)1, ,937-4,971

IMPACT OF CLIMATE CHANGE 22

WAS THE WINTER OF 2009/2010 NORMAL? 23 SKIING IN HERTFORDSHIRE STORMY WEATHER IN CORNWALL ABNORMAL? NORMAL?

UKCP09 SCENARIOS – PREDICTED CHANGES IN MEAN WIND SPEED 24 Predicted changes in surface wind speed (%), for minus Derived from 11 ensemble members of the HadCM3 global climate model (PPE_RCM). Medium emissions scenario. Brown et. al Climate Projections

UKCP09 SCENARIOS – PREDICTED CHANGES IN MEAN WIND SPEED 25 Percentage changes in surface wind speed for winter months for relative to for 3 climate models. Brown et. al. 2009

CHARACTERISTICS OF THE NORTH ATLANTIC OSCILLATION INDEX (NAO) 26 High NAO Low NAO Increased/stronger westerlies. Warmer temperatures and increased precipitation. Reduced/weaker westerlies. Colder temperatures and reduced precipitation. Measure of the pressure difference between the permanent low-pressure system over Iceland and the permanent high-pressure system over the Azores (the Azores high) 26

27 Prolonged +ve phase CHARACTERISTICS OF THE NORTH ATLANTIC OSCILLATION (NAO) 27

28 PREDICT PRODUCTION Use geostrophic wind data to enable a long term record from 1961 to be generated

29 NORMALISED SEASONAL PRODUCTION TREND

MONTHLY PRODUCTION AND NAO INDEX December 2009 – February

NORTH ATLANTIC OSCILLATION – FUTURE CHANGE Gillett et. al Most climate models simulate an increasing trend, with pressure decreases over the far North Atlantic and pressure increases in middle latitudes. Details vary considerably from model-to-model, and the simulated trends are smaller than observed Gillett et. al

NORTH ATLANTIC OSCILLATION – FUTURE CHANGE The IPCC 4th assessment report states: Sea level pressure is projected to increase over the subtropics and mid- latitudes, and decrease over high latitudes (order several millibars by the end of the 21st century) associated with a poleward expansion and weakening of the Hadley Circulation and a poleward shift of the storm tracks of several degrees latitude with a consequent increase in cyclonic circulation patterns over the high-latitude arctic and antarctic regions. Thus, there is a projected positive trend of the Northern Annular Mode (NAM) and the closely related North Atlantic Oscillation (NAO) as well as the Southern Annular Mode (SAM). There is considerable spread among the models for the NAO, but the magnitude of the increase for the SAM is generally more consistent across models. 32

NORTH ATLANTIC OSCILLATION – FUTURE CHANGE Goodkin et. al From using coral (Bermuda) as a proxy for sea surface temperature it has been possible to construct a record of the NAO from 1781 to 1999 and this has led to: Prolonged period of positive phase in 1990s led to the suggestion that anthropogenic warming was affecting the NAO. Insufficient evidence to support this conclusion. Coral marine records shows that multidecadal frequencies are correlated to shifts in hemispheric mean temperatures. Climate change seems to be acting to increase NAO variability suggesting that periods of prolonged intervals of extreme positive and negative NAO Index will probably increase. 33

SUMMARY OF PRESENTATION 34 1.Poor choice of anemometry can lead to large uncertainties. 2.Measure at hub height. 3.Install more than one mast for large or complex sites. 4.North Atlantic Oscillation has a major impact upon production in the UK 5.Impact of Climate Change is uncertain. 6.Invest in projects which have been engineered and developed to a high standard.

35