Business opportunities related to CERN electrical network

Slides:



Advertisements
Similar presentations
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Advertisements

Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
SLIM® and Bio-SLIM® The “Life starts at 36”-project:
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
GDE meeting Hamburg May 2007 Global Design Effort 1 ILC Power Distribution Status Presentation Hamburg, May 2007 J. Pedersen CERN.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Technical Presentation on the new Power Saving Unit (PSU) Introduced By View Power.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
132KV GSS PIPAR CITY JODHPUR
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
POWER QUALITY AND NETWORK DISTURBANCES in CERN’s electrical network K. KAHLE, TS-EL Diploma students R. Sternberger, M. Neubert 1 st TS Workshop Archamps,
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
High Temperature Superconducting (HTS) Cable Project
Schneider Electric Solutions For Six Euro 2004 Soccer Stadiums
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Supply and Distribution of Electrical Energy
I. Bergevoet - Training preparation
Sub Station.
YETS & LS2 Works EN-EL / Power distribution
Introduction to Electric Power System and A. C. Supply
SUB-STATIONS.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Chapter # 25 Sub-Stations risemark.pbworks.com.
EYETS Works EN-EL [ FC excluded ]
Instrumentation for Accelerators Technologies for the HL-LHC
YETS & LS2 Works EN-El on LHC / Power distribution
CLIC Civil Engineering & Infrastructure Working Group Meeting
Dielectric Oil Installations
SHORT CIRCUIT MONITORING BY USING PLC & SCADA
CERN Data Centre ‘Building 513 on the Meyrin Site’
Budget specification EHN1 Extension: Infrastructure (WG2)
Part II: Integrated Design of Infrastructures
EN 4946 – Refurbishment of Electrical Substations
the high-voltage network of CERN ToMORROW
EE6501 POWER SYSTEM ANALYSIS
the CERN Electrical network protection system
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS & LS2 Works EN-EL / Power distribution
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Maintenance at ALBA facility: Strategy for the conventional services
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

Business opportunities related to CERN electrical network S. Bertolasi, EN-EL ITALY at CERN 04.04.2017

Business opportunities related to CERN electrical network Agenda Introduction to CERN electrical network Equipment, activities and contracts Ongoing and future contracts/projects Conclusions 04.04.2017 Business opportunities related to CERN electrical network

Business opportunities related to CERN electrical network Agenda Introduction to CERN electrical network Equipment, activities and contracts Ongoing and future contracts/projects Conclusions 04.04.2017 Business opportunities related to CERN electrical network

CERN accelerators complex 04.04.2017 Business opportunities related to CERN electrical network

Sources of electricity at CERN 04.04.2017 Business opportunities related to CERN electrical network

Electrical network: geographical extension 04.04.2017 Business opportunities related to CERN electrical network

CERN daily average power 04.04.2017 Business opportunities related to CERN electrical network

Electrical network: voltage levels French source 400 kV Swiss source 130 kV Transmission 66 kV Distribution 18 kV Diesel generators 6.3 / 3.3 / 0.4 kV Compressors and Pumps 3.3 kV Users 400 / 230 V Electrical equipment control 48 VDC 04.04.2017 Business opportunities related to CERN electrical network

Electrical network: type of loads Power converters Radio frequency systems Cryogenics compressors Pumps (vacuum, cooling towers, chilled water…) Ventilation systems Fire/Smoke/Gas detection and extraction Electronic racks Heating Lifts Lighting 04.04.2017 Business opportunities related to CERN electrical network

Business opportunities related to CERN electrical network Agenda Introduction to CERN electrical network Equipment, activities and contracts Ongoing and future contracts/projects Conclusions 04.04.2017 Business opportunities related to CERN electrical network

“Components” of the network Can be classified in 5 groups: HIGH VOLTAGE Transformers MV Cables Switchgears Gensets LOW VOLTAGE 48 VDC systems UPS Switchgears and switchboards LV Cables Gensets CONTROL Supervision system PLC The activities related to the electrical network target companies with experience in these five sectors CABLING Control cables Coaxial cables Water cooled cables Optical fibers Connectors ENERGY Supply of energy 04.04.2017 Business opportunities related to CERN electrical network

Example: water-cooled cables (1/2) Cross-section (mm2) Direct Current Intensity (kA) Cable quantity Total Length (Km) Nominal Maximum 500 3.5 5 192 1.53 800 6 8 133 1.50 1000 10 154 2.46 1300 38 0.79 2000 13 20 169 1.17 These flexible water-cooled cables or “WCC” are used for transporting high DC current from power converters to superconducting current leads Water-Cooled Cables + - Current leads Power converters Current leads Power converters 04.04.2017 Business opportunities related to CERN electrical network

Example: water-cooled cables (2/2) Constitution Example of a 500mm2 cross-section WCC Bolt holes Copper rope Connection for cooling water Cable terminal is made from a single piece of high-conductivity forged copper Characteristics Flexibility Simple concept High cooling performance High DC current-transfer efficiency (up to 6-10 A/mm2 following section) 04.04.2017 Business opportunities related to CERN electrical network

How activities are structured In general: Blanket contracts for the supply of equipment Service contracts for installation In some cases: One contract for supply + installation For big projects: Turn-key contracts Maintenance Service contracts for maintenance 04.04.2017 Business opportunities related to CERN electrical network

Example 1 – Procurement of non-standard cables Buy to order for installations Cable types Coaxial (3/8” and 7/8”) Low voltage (0.6/1.1 kV) High voltage (≥ 1.8 kV ≤ 66 kV) Multi wire (data, control, signal) Cable specifications Fire resistant (IEC 60331) Low/high voltage (IEC 60502) Radiation resistant materials Insulation/sheath materials with a Radiation Index of 5.7 (IEC 60544-4) Special radiation resistant 5 x 10 7 Gy (Kapton®) High voltage Coaxial (triaxial) 04.04.2017 Business opportunities related to CERN electrical network

Example 2 – Renovation substations Integration by CERN, equipment provided via blanket contracts, installation on site via a service contract 04.04.2017 Business opportunities related to CERN electrical network

Example 3 – Turn key contract Diesel generator power station for the Prévessin site (2013-2014): design of the building and electrical systems, civil engineering, supply and commissioning gensets… 04.04.2017 Business opportunities related to CERN electrical network

Example 4 – Cables pulling & blowing Organized in various ways, depending on the type of cables, type of activities and environment 04.04.2017 Business opportunities related to CERN electrical network

Business opportunities related to CERN electrical network Example 5 - Maintenance 400 kV equipment, transformers, PLCs, LV switchboards… Preventive and corrective maintenance 04.04.2017 Business opportunities related to CERN electrical network

Business opportunities related to CERN electrical network Agenda Introduction to CERN electrical network Equipment, activities and contracts Ongoing and future contracts/projects Conclusions 04.04.2017 Business opportunities related to CERN electrical network

Main ongoing and future projects New substation 400 kV / 66 kV 220 MVA (ongoing) New diesel generator power station Meyrin (ongoing) Renovation 400 kV protection system (ongoing) Short term (2017 to 2020): no turn-key contracts foreseen, but important consolidation foreseen for the SPS and PS electrical network (through frame contracts) Long term (2021-2025): important works for HL-LHC on two different geographical sites, in surface and underground. Commercial strategy not yet defined. 04.04.2017

Examples of ongoing contracts (1/2) Supply And Installation Of Water-Cooled Bus Bars And Cables For The LHC Supply and Installation of 24 kV Metal-Clad Compartmented Cubicle Supply, Installation And Maintenance Of Modular Metal-Enclosed 400/230 V Switchboards For Indoor Use Supply Of Numerical Relays For Protection Of Electrical Power Systems Supply Of Power Cables Supply, Installation, Commissioning And Maintenance Of Static Uninterruptible Power Supply (Ups) Units Supply Of Cast-Resin Dry-Type Power Transformers 18/0.4 kV, 18/3.3 kV And 3.3/0.4 kV Supply, Installation, Commissioning And Maintenance Of 48 V Dc Production And Distribution Battery-Based Systems Supply Of Flexible Water-Cooled Copper Cables For The LHC Supply, Installation And Commissioning Of 24 kV Compact Switchgears Radiation Resistant Multi-Mode Optical Fibre 04.04.2017 Business opportunities related to CERN electrical network

Examples of ongoing contracts (2/2) Installation And Maintenance Of Optical Fibre Systems For CERN Accelerators And Infrastructure Electrical Installation Work At Cern Maintenance Des Tableaux Basse Tension Maintenance Des Tableaux Haute Tension Maintenance Des Automatismes De Plc Existants Sur Le Reseau Electrique Contrat De Maintenance Pour Les Ups Ts/El (Uninterruptible Power Supplies) Comprenant 220 Unité de 10 à 600 kVA Maintenance Contract For Cern'S Diesel-Generator Sets Provision Of Preventive And Corrective Maintenance Services For The Electrical Installations On The Cern Site 04.04.2017 Business opportunities related to CERN electrical network

Business opportunities related to CERN electrical network Agenda Introduction to CERN electrical network Equipment, activities and contracts Ongoing and future contracts/projects Conclusions 04.04.2017 Business opportunities related to CERN electrical network

Business opportunities related to CERN electrical network Conclusions The electrical network plays a central role in CERN accelerators complex The electrical network is evolving permanently thanks to consolidations and upgrades Maintenance is mandatory to keep reliability high Industrial partners are fundamental to have a reliable state-of-the art electrical network 04.04.2017 Business opportunities related to CERN electrical network

Business opportunities related to CERN electrical network Agenda Introduction to CERN electrical network Equipment, activities and contracts Ongoing and foreseen contracts/projects Conclusions Questions? ? 04.04.2017 Business opportunities related to CERN electrical network