Project Name: George Gardner Performing Arts Center

Slides:



Advertisements
Similar presentations
1
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Submitted by Markham Public Library April 29, 2012
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Druid Hills High School
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
1 Room Planning Service Area.
KITCHEN PLANNING WORK TRIANGLE.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
2 |SharePoint Saturday New York City
Green Eggs and Ham.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
FAFSA on the Web Preview Presentation December 2013.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Using one or more of your senses to gather information.
Indicator 1 – Number of Older Americans Indicator 2 – Racial and Ethnic Composition.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts

Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
Presentation transcript:

Project Name: George Gardner Performing Arts Center 2009 Monarch Award Project Name: George Gardner Performing Arts Center City, State: Holbrook, Arizona School Type: 9-12 High School Construction Type: CM@Risk Submitting Firm: SPS+ ARCHITECTS LLP George Gardner Performing Arts Center

Holbrook Auditorium Main Entry George Gardner Performing Arts Center Page-1

Main Plaza access to auditorium, pathway to gymnasium the entry has scaled approach to each area created by steps first, then perforated canopies, and interior corridor can be seen and then the access to the point of interest. George Gardner Performing Arts Center Page-2

Holbrook Auditorium night view George Gardner Performing Arts Center Page-3

depicted in the floor design. Main Lobby as representative of the Native American Hogan in its shape and wood ceiling. a petrified wood slab from the Petrified forest area is at the bottom of the star depicted in the floor design. George Gardner Performing Arts Center Page-4

Main Lobby Entry George Gardner Performing Arts Center Page-5

Walls and Ceilings shaped for natural acoustics. George Gardner Performing Arts Center Page-6

Main House George Gardner Performing Arts Center Page-7

Main House Auditorium, 809 seats. George Gardner Performing Arts Center Page-8

Restrooms, showing acid stained floor, slate tile wainscot & custom fabricated lavatories. George Gardner Performing Arts Center Page-9

As possible to each culture. Gallery area for display of different cultural exhibitions appears as neutral As possible to each culture. George Gardner Performing Arts Center Page-10

Site Plan 4 5 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Auditorium Gymnasium Weight Room Vocational/Carpentry Welding Shop Science Classroom Junior High School Administration & Library Arts Classroom Music Classroom Classrooms Community Plaza High School Classroom Parking Kitchen Multi-Purpose Drop-off Dining Room 16 2 6 7 3 12 1 14 8 17 9 10 11 13 15 18 14 6’ 12’ 24’ 48’ George Gardner Performing Arts Center Page-11

Floor Plan 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. Gymnasium Foyer/Gallery Audio Control Ticket Booth Men’s Toilet Tickets Concession Main Lobby Janitor Storage Drama Library Toilet Exterior Plaza Corridor Women’s Toilet Riser Stage Right Orchestra Pit Below Center Stage Stage Left Piano Storage Practice Rooms Electrical/Mechanical Gallery Sheet Music Library Art Classroom Choir Classroom Jazz Band Classroom Concert Band Storage Concert Band Classroom Main House Jazz Storage Teachers Office Workroom Catwalk Access Future Restrooms Exterior Corridor 1 35 8 5 6 9 35 4 34 10 11 3 16 13 36 7 2 17 18 30 19 22 14 34 20 13 15 23 21 32 32 32 31 21 29 26 25 25 24 27 28 3’ 6’ 12’ 48’ George Gardner Performing Arts Center Page-12

Project Narrative This particular performing arts center was created with a lot of flexibility in mind. The design team was faced with coming up with a plan for the community of Holbrook to finally have a state of the art facility that would last far into the future. The auditorium house was created for lots of versatility. First, there were considerations for the students and the instructors. The building was designed to give them the best available technology for stage rigging, audio, lights, props, stage layouts and acoustics, considering always the opportunity for them to be creative and use the system to their advantage. Motorized rigging and computer controlled systems were provided to facilitate the learning process without the need to have a highly specialized instructor teaching on obsolete systems. A catwalk system with double bridges was provided to create a variety of options for lighting designs similar to those that can be found in larger auditoriums. The acoustics in the house were designed to provide the best natural sound without the use of any technology, allowing the opportunity for students to perform without enhanced audio. The second factor considered was providing a building for the community that could be used for different activities such as training, guest performances for the community, art displays, and of course performances by students. The final major factor in the design was to create a place in which the community could gather. The Holbrook High School campus had an existing gymnasium as well as music and art classrooms adjacent to the auditorium site. There was an opportunity to tie all these activities in one location and create a gathering point. The new building was designed with this in mind and an exterior plaza was created that became the new façade for the campus and, now, community center. Two lobbies in addition to the main entrance lobby were integrated in the design. One is for sports activities and a concession area for auditorium/gymnasium common use. The other is a gallery lobby which will display works of art from the different cultural groups while serving as access to the music and art classrooms. Materials used on the design were selected to further emphasize the cultural heritage of the town of Holbrook. The surrounding landscape has a dramatic impact to the visitors; the building had to bring this in a reasonable manner by the use of materials and elements. The geometric elements on the building were added in order to complement the existing high school campus. At the same time materials and colors were selected to represent the nearby Painted Desert with layers of colors. Stone was quarried from a site nearby to bring this identity to the main element of the building and, finally, steel canopies and decor with a natural rusted appearance were added to the facility in an effort to resemble the existing structures and elements found in the old Route 66 in downtown Holbrook. George Gardner Performing Arts Center Page-13

Project Budget Page-1 Project Total Budget Building Size SF Cost/SF $ Final Cost A/E FEE Completion Remarks Location George Gardner Performing Arts Center 7,000,000 27,566 254 6,941,932 460,946 On Schedule CM@Risk Design Reviews Simplified Rigging System & Cost Holbrook Arizona George Gardner Performing Arts Center Page-14 Page-1

Project Details January 2008 Page-15 Project Name George Gardner Performing Arts Center City Holbrook State  Arizona District Name Holbrook High School Supt/President Ferral Knight Occupancy Date January 2008 Grades Housed 9-12   Capacity (Students)  809 Site Size (acres) 11 Acre, Complete Campus Gross Area (sq. ft.)  27,566.87 SF Per Occupant (pupil)  34.075 SF/Pupil gross/net please indicate Gross. Design and Build? Design and CM@Risk If yes, Total Cost:  $6,941,932 Includes: Stage, Seating ,Fixed Equipment, Building Construction If no, Site Development: Building Construction: Fixed Equipment: Other: Total: George Gardner Performing Arts Center Page-15