MONDAY 17 MARCH 2003 Haivan Pass Tunnel Construction Project CONSTRUCTION PROGRESS February 2003.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Background images courtesy of abc.com 1,000, , , ,000 64,000 32,000 16,000 8,000 4,000 2,000 1,
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Fill in missing numbers or operations
/ /17 32/ / /
AP STUDY SESSION 2.
Reflection nurulquran.com.
Worksheets.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
& dding ubtracting ractions.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Figures on student mobility
David Burdett May 11, 2004 Package Binding for WS CDL.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 Screening & Eligibility Jeopardy Title V/PHC.
Dennis L. Edwards Tunnel
1 1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Summative Math Test Algebra (28%) Geometry (29%)
2.11.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Cost Estimating Workshop March 14-17, Project Phase Update Phase 1 and 3 Brad Hyre, P.E. Transportation Manager HDR Phase 2 Manoj Sethi, P.E. Executive.
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Before Between After.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
 Find the difference between the two numbers on the red boxes.  If the difference of the red boxes matches the blue box say “deal” f not, it’s “no.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
: 3 00.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Static Equilibrium; Elasticity and Fracture
Haivan Pass Tunnel Construction Project
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
& dding ubtracting ractions.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
Graeme Henchel Multiples Graeme Henchel
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
MONDAY 04 AUGUST 2003 WELCOME HAIVAN PASS TUNNEL CONSTRUCTION PROJECT.
Presentation transcript:

MONDAY 17 MARCH 2003

Haivan Pass Tunnel Construction Project CONSTRUCTION PROGRESS February 2003

Construction Progress End of February 2003 PackageProgress (physical) 1A65% 1B75% 2A30% 2B50% % %

Progress of Haivan Tunnel Tunnel monitoring – End of February m (79.12) m (75.5%) m (54.9%) m (56.1%) m (97.9%)

Progress of Haivan Tunnel Package IA – North Tunnel Section Main tunnel: m, 2 lanes, 89 m 2 Evacuation tunnel: m, 15.5 m 2 Ventilation Adit: m, 36.2 m 2

Package IA – North Tunnel Section Main tunnel: m Evacuation tunnel: m Ventilation Adit: m February m (56.1%) m (54.9%) m (97.9%)

Package IA – North Tunnel Section February 2003 North Portal area

Package IA – North Tunnel Section February 2003 Ventilation Adit Portal area

Package IA – North Tunnel Section February 2003 Explosive charging at main tunnel

Package IA – North Tunnel Section February 2003 Installation of waterproofing membrane at Main tunnel

Package IA – North Tunnel Section February 2003 Installation of waterproofing membrane at Main tunnel

Package IA – North Tunnel Section February 2003 Completed lining concrete at layby No.3 and Vehicular cross passage connection

Package IA – North Tunnel Section February 2003 Tunnel face drilling at Evacuation tunnel

Package IA – North Tunnel Section February 2003 Explosive charging at Ventilation tunnel

Package IA – North Tunnel Section February 2003 Shotcrete spraying at Electrostatic precipitator

Progress of Haivan Tunnel Package IB – South Tunnel Section Main tunnel: m, 2 làn xe, 89 m 2 Evacuation tunnel: m, 15.5 m 2

Package IB - South Tunnel Section Main tunnel: m Evacuation tunnel: m February m (75.5%) m (79.12)

Package IB - South Tunnel Section February 2003 South portal area

Package IB - South Tunnel Section February 2003 Shotcrete for finishing between concrete lining

Package IB - South Tunnel Section February 2003 Installation of water proofing membrane

Package IB - South Tunnel Section February 2003 Concrete lining form No. 2

Package IB - South Tunnel Section February 2003 Placcement of Concrete lining form No. 1

Package IB - South Tunnel Section February 2003 Drilling of Evacuation tunnel

Package IB - South Tunnel Section February 2003 Electrostatic precipitator No. 3

Package IB - South Tunnel Section February 2003 North abutment of Bridge No. 1

Progress of Haivan Tunnel Tunnel monitoring – End of February m (79.12) m (75.5%) m (54.9%) m (56.1%) m (97.9%)

Progress of Haivan Pass Tunnel Project Package IIA – Lang Co Bridge Section Lang Co Bridge, m total length Two lane roadway, m total length A northern toll plaza Construction of 187m 2 area enclosed car port

Package IIA – Lang Co Bridge Section February 2003 Overall Progress: 30% North approach: Road and surcharge fill completed 100% Lang Co Bridge: 28% Total 182 nos of bored piling completed, remaining 64 nos Total 10 girders launched South approach: embankment finished up to 1000 m 3

Package IIA – Lang Co Bridge Section February 2003 General view of Lang Co view

Package IIA – Lang Co Bridge Section February 2003 Launching girder span No. 25

Package IIA – Lang Co Bridge Section February 2003 Launching girder span No. 26

Package IIA – Lang Co Bridge Section February 2003 Construction of P10

Package IIA – Lang Co Bridge Section February 2003 Construction of P19

Package IIA – Lang Co Bridge Section February 2003 Sight view of P21, P22, P23…

Package IIA – Lang Co Bridge Section February 2003 Completed P24, P25, A2 abutment on site

Package IIA – Lang Co Bridge Section February 2003 Installation of floating system

Progress of Haivan Pass Tunnel Project Overall Progress: 50% Bridge No. 2 : 334m, 46% Bridge No. 3 : 33 m, 50% Bridge No. 4 : 175 m, 97% Bridge No. 5 : 133 m, 48% Bridge No. 6 : 150 m, 47% Bridge No. 7 : 133 m, 48% Package IIB – Southern Highway Section February 2003

Package IIB – Southern Highway Section February 2003 Bridge No.2: launching spans (A1-P3)

Package IIB – Southern Highway Section February 2003 Bridge No. 2: Pier P4 - P8

Package IIB – Southern Highway Section February 2003 Bridge No.4: Completed deck slab view from A1

Package IIB – Southern Highway Section February 2003 Bridge No.5: Girder casting yard

Package IIB – Southern Highway Section February 2003 Bridge No.6: Girder casting yard

Package IIB – Southern Highway Section February 2003 Bridge No.7: Abutment A1 under structural backfilling

Progress of Haivan Pass Tunnel Project Package V: 110/22kV Substation and 110kV Transmission Line February 2003 Overall progress: 55% 110/22kV Substation Brick work was 90% completed 110 GIS was delivered on site 110kV Transmission Line: 110kV Transmission Line Tower foundation excavation started

South Portal Area Package V: 110/22kV Substation and 110kV Transmission Line

February /22kV Substation operation and control center building

Package V: 110/22kV Substation and 110kV Transmission Line February kV GIS delivery on site

Package V: 110/22kV Substation and 110kV Transmission Line February 2003 Earthing register measurement for access

Package V: 110/22kV Substation and 110kV Transmission Line February kV Overhead Transmission Line Tower Foundation Excavation

Conclusion Progress of Project is updated monthly at projects homepage Consultant Teams

Thank you and Have a good time