How to Use the Bayanihang Eskwela Checklist G-Watch Ateneo School of Government joint government-citizen action for good governance.

Slides:



Advertisements
Similar presentations
Writer’s Workshop By Mrs. Hicks.
Advertisements

ODOT- Office of Environmental Services. How to create effective PI Communication Tools.
Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
1 Citizens monitoring of procurement contract implementation: lessons from the Philippines Dondon Parafina ANSA-EAP Network Coordinator Ateneo School of.
The Textbook Count Experience Characterizing the G-Watch SAc Approach:
Office of Special Education & Early Intervention Services What happens after Focused Monitoring? -
And some other tips. Society of Government Travel Professionals Educational Conference September 5, 2012 Washington DC Tim Hay State of Oregon.
Learning and Development Evidence Collection Planning January 2015.
As told by Elizabeth Anderson, Stormwater and Erosion Control Engineer (SWECE), SE-Region.
Career Management A Roadmap for Planning Your Career.
Measuring Prototype Structures for Models Kevin Looff Rick Watson March 1, 2008.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
19 th Annual Audit Division Conference October 7-8, 2010 Orlando, Florida Developing a Checklist Robert Orkin Project QA/QC Manager Parsons Brinckerhoff.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Eight Cert IV - M. S. Martin March 2012.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
ESTIMATING By Laith Jacob.
ISO 9001 Interpretation : Exclusions
Engineering Design Process
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Methods of Measurement.
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
Social Media for Business Set Up, Strategy Creation & Content Publishing Video 3 Social Media Training for Business Teachers #getstarted.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
Safeguards Training Ankara, Turkey May 17, 2011 Simplified Checklist EMP for Small Scale Civil Works – Introduction and Exercise.
MN SW-PBIS Training Kevin Filter School-wide Evaluation Tool (SET) 1.
© Business & Legal Reports, Inc OSHA Inspections, Citations, and Penalties Massachusetts Care Self-Insurance Group, Inc. S afety A wareness F or.
Specification & Quantities Estimating
Fractions + & – Mixed Numbers Can you simplify the following with ease? 1 5 / / 4 or 2 7 / / 3 If not then run through this slide show,
Monitoring and Evaluation Management of a Training Program.
The Natural Pool To advance to the next slide, click your mouse button. To end the show, close the window.
CS 5150 Software Engineering Lecture 7 Requirements 1.
Planning and Evaluating your Program. Torture Technique or Useful Tool?
On the Job Training..  Day One  What is Coaching?  Who should be a Coach?  What’s the role of a coach?  Building a one pager  Personalize.
UNMANNED AVIATION QUALIFICATION FLIGHT SKILLS TEST BRIEFING UAVAirways Limited | Registered in England No: | UAQ Skills Test v1.0.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Thursday 2 December 2010Shelter meeting 10b is hosted by OCHA Transitional Shelter Guidelines Tom Corsellis: Shelter Centre.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Internal Auditing ISO 9001:2015
Testing the Checklist in the OR & Engaging Enthusiastic Colleagues.
Steps of 5S implementation and Trainers’ responsibilities
1 Data collection Generating an evidence base for policy-making Joint IDP Profiling Service Informing Solutions Together.
How to Deliver a Technical Presentation? Svetlin Nakov Telerik Corporation Technical Trainer.
Economics Activity This activity will take place in groups determined by your tutor. You are about to see a picture of a famous entrepreneur. His picture.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
ILC #4: Return of the Exit Tickets! Content Objectives for Today (WHAT): – Identify the components of ILC #4 – Analyze teacher & student data from ILC.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Learning Targets Formative Assessments and Performance Scales How to Use Them Continually, Effortlessly, and Seamlessly Throughout Your Lessons.
World Bank Procurement Procedures Module - Technical Specifications for RTDAS Anish ….. Hydro-Informatics Expert The World Bank.
How to Organize your monitoring team G-Watch Ateneo School of Government joint government-citizen action for good governance.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
PACFaH M&E TOOLS AND REPORTNG TIMELINES Jayne Arinze-Egemonye.
Building an ENI CBC project
ISO/IEC
DTF CONSTRUCTION MONITORING
Preparing for Systems Verification
9/18/2018 Bids CONTRACTING Khamis…..
The Engineering Notebook
2016 Procurement Framework Contract Management
GUIDELINES AN INTRODUCTION TO: Material Selection TECHNICAL
GPP Training Toolkit An Introduction European Commission
Procurement Planning Mani Ram Gelal
The New ACoRN Workbook ACoRN ‘2012 Update’ © ACoRN Neonatal Society.
Briefing Orientation for Division Coordinating Groups
Digital Construction Engineering in Class – A collaborative approach
Project intervention logic
INFORMATION SEMINAR Interreg V-A Latvia-Lithuania programme
Project intervention logic
Presentation transcript:

How to Use the Bayanihang Eskwela Checklist G-Watch Ateneo School of Government joint government-citizen action for good governance

Bayanihang Eskwela Monitoring Tool The Bayanihang Eskwela Checklist is an easy-to-use guide for ordinary, non- technical people which they can bring during the actual monitoring visits to the project site. This will aid you and your monitors in inspecting the implementation of the school building project

Stages to be Monitored Site Identification and Pre- Engineering Surveys Preparation of Scope and Program of Works Procurement Construction Stage Joint Final Inspection and Completion G-Watch Ateneo School of Government joint government-citizen action for good governance

Sections of the Bayanihang Eskwela Monitoring Tool 1.School Profile 2.Pre-Construction Stage 3.Construction Stage 4.Post-Construction Stages 5.General School Needs

School Profile School Name School Building Project Profile General School Needs Educational Development Indicators

Pre-Construction Stage Site Identification Project Meeting Pre-engineering Survey Preparation of POW Site Inspection Bidding

Construction Stage Earthworks and Excavation Concrete Works Masonry Carpentry Painting

Post-Construction Stage Process Structure Conduciveness to Learning Responsiveness to School Need

Immediate School Needs

REMINDERS On-site inspection provides real-time information on the progress of project implementation Take pictures! And take down notes! Photo- documentation provides clear evidence of project outputs. On-site inspection provides real-time information on the progress of project implementation Take pictures! And take down notes! Photo- documentation provides clear evidence of project outputs. Dont forget to bring the following: G-Watch Checklist Copy of the Program of Work Notebook and pen Camera Tape Measure

END SLIDE

Simulation Exercise (If necessary) 1.Group according to your division. 2.Some divisions will cover different sections of the tool (Pre-construction, construction and post construction stages only). 3.Try and answer a checklist given the simulated school buildings prepared in front of you.