Presentation : Valerie Sethosa 16/09/2010

Slides:



Advertisements
Similar presentations
Food Truck Econ.
Advertisements

14-1 Chapter 14 Risk and Managerial (Real) Options in Capital Budgeting © Pearson Education Limited 2004 Fundamentals of Financial Management, 12/e Created.
Career Technical Education Educating Californias 21 st Century Workforce Pacific Policy Research Foundation November 16, 2006.
PPPs in Practice Key Success Factors ICT Sector Week Chris Neff Vice President of Marketing March 28,
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
Slide: 1 Website: DG ECHO HUMANITARIAN AID AND CIVIL PROTECTION Finance, Legal Affairs and Partner.
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
1 DPAS II Process and Procedures for Teachers Developed by: Delaware Department of Education.
1 Screening & Eligibility Jeopardy Title V/PHC.
Office of Civil Rights Business Development Program Overview Metro State Aid Training 3/2/11.
Sean Sweeney Cornell Global Labor Institute University of Bath, U.K. February 27, 2009 (slides designed by Michael Renner, Worldwatch Inst) Green Jobs:
Applicable for Persons Registered under Article 10
Contractor Incubator Programme NDPW 2008 Presentation: Overview.
1 MORTGAGE SYMPOSIUM June 30, 2009 ECCB 5.30 p.m.
Company LOGO AFRICA CONGRESS OF ACCOUNTANTS PAFA event - GHANA – MAY 2013 Promoting the Growth of Small & Medium Enterprises (SME) Tshego Modise, President,
Authorized to: Perform mortgage loans, personal and pledge loans, lease and factoring. Not authorized to: Attract people who want to save.
IAS 11 - Revenue recognition for construction contracts
Mechanical & Electrical Golfers Society Annual Year End Awards Prysmian Cable Challenge.
Completion of the briefing attandance register Bids received before the closing date and on the closing date before 11:00 am will be accepted. The closing.
Apprenticeship Grant for Employers of 16 to 24 year olds (AGE 16 to 24) Employer Update Presented by DMT Business Services.
Equal or Not. Equal or Not
Slippery Slope
 1,000,0001,000,000  500,000500,000  250,000250,000  125,000125,000  64,00064,000  32,00032,000  16,00016,000  8,0008,000  4,0004,000  2,0002,000.
1 Ethekwini Municipality: Small Medium and Micro Enterprise (SMME) Fair: September 2010 Business Opportunities Presentation: by MEC for KZN Human.
Created by Terri Street Copyright, 2000  1,000,0001,000,000  500,000500,000  250,000250,000  125,000125,000  64,00064,000  32,00032,000  16,00016,000.
“South Africa Works because of Public Works” Department of Public Works Capacity Buildings – Skills Transfer.
Construction Industry Development Board development through partnership Activating the Registers within Construction Procurement 1b.
AN INDUSTRY PERSPECTIVE OF THE CIDB PROCESS Transport, Housing, Public Works, Local Government & Provincial Affairs, Water Affairs & Forestry.
The bid will be evaluated in a Three phrase approach. Administrative Compliance, Technical and Price and Preference WP 0485/1014 WTE Briefing session.
The bid will be evaluated in a Three phrase approach. Administrative Compliance, Technical and Price and Preference.
Construction Industry Development Board development through partnership “Towards Uniform Conditions of Contract and Specifications in South Africa” South.
Development through partnership Construction Industry Development Board Infrastructure for South Africa’s economic and social growth cidb Portfolio Committee.
Construction Industry Development Board development through partnership CIDB Construction Registers Service 1a.
NHBRC Established in terms of the Housing Consumer Protection Measures Act (Act 95 of 1998) The NHBRC is mainly established to protect the interest of.
Construction Industry Development Board development through partnership CONSTRUCTION INDUSTRY DEVELOPMENT BOARD Umgeni Supplier Information Session Tuesday.
Agenda Welcome Walsall Works Update Hourly rates Achievements Celebration Event Q&A session AOB Date of Next Meeting.
1. 2 Limpopo Economic Development Enterprise EASTEN CAPE DEVELOPMENT CORPORATION – 02 MAY 2011.
Development through partnership Construction Industry Development Board Kwena Mokobane 21 June 2013.
The Contractor Development Program
Civilution Congress 2014 CESA: A CODESA of Infrastructure Procurement Panel Discussion Infrastructure Procurement Civilution : Outcomes and Benefits to.
Construction Industry Development Board development through partnership Construction Industry Development in South Africa Construction Industry Development.
Development through partnership CONSTRUCTION INDUSTRY DEVELOPMENT B0ARD (CIDB) REGULATION AMENDMENTS 01 JANUARY 2009.
Presentation On City of San Antonio Small Business Program Alternative Construction Delivery Method (CSP for Fire Station #27)
1 Quality in Construction; cidb Mandate & Focus February 2014.
Shropshire Providers Consortium (SPC) 2.5 years on.
Oral presentation By JP Msibi Executive Director National Association for Youth Empowerment in Construction (NAYEC) VOTE 6 Budget Portfolio Committee.
Cidb Presentation for 1 st and 2 nd quarter Performance Reporting 2010/11 Portfolio Committee on Public Works 8 November 2011 development through partnership.
NURCHA PRESENTATION 2010 NURCHA CONSTRUCTION FINANCE AND SUPPORT SERVICES Subsidy Housing Infrastructure & Community Facilities Affordable Housing.
Development through partnership Applying the cidb registers in construction procurement (Based on Regulations which became effective on 1 January 2009)
National Arts Council of South Africa: TERMS OF REFERENCE NAC: Travel Management Services Presented by: Dakalo Mandiwana Finance Manager.
For a better built environment 1 Council for the Built Environment By Bridget Bhengu aka Malindi Neluheni.
The Basics of Bonding & The Contractor Development Program Presented By: Navid Barkhordar.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
1 A Transformation Framework cidb National Stakeholder Forum 29 March 2016.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Civil works at Upington Substation. Commercial Presentation Date: 19 October 2015 Presenter: Ngiphile Nkwanyana Ref: PS(PDP)/2015/NN/07.
EFFECTIVE & SUSTAINABLE PROCUREMENT SYSTEM IN LAGOS STATE Partnering for Development Onafowote, Fatai Idowu Acting General Manager (PPA) Presentation made.
ISIPHIWO TRADING PRESENTATION
1 Status of Transformation in the Construction Industry cidb National Stakeholder Forum 29 March 2016.
Evaluation Grids Evaluation Grids.
South Africa Works because of Public Works
Presentation Outline The national contractors grading register (from grades 1 – 9) Strategy to upgrade and ensure access to lower - grade contractors especially.
Presentation to the Parliamentary Portfolio Committee on Public Works – Annual Performance Plan 2018/19 24 April 2018.
Impediments facing SMEs in the Construction Industry
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
common focus, joint action
Business Plan for 2007/2008 Construction Industry Development Board
Director-General: Mr. E Africa
Presentation transcript:

Presentation : Valerie Sethosa 16/09/2010 Construction Industry Development Board Construction industry growth, delivery, performance, capacity and empowerment 1

cidb distilled mandate (cidb Act 38 of 2000) An enabling regulatory and development framework that builds A total industry delivery capability to achieve South Africa’s economic and social growth Empowerment of those historically marginalised Improved industry standards of performance (quality, employment, skills, safety, health) sustainable industry development

SERVICE DELIVERY REGISTRATIONS Help Desk Support Services (Advice) (CIDB & PARTNER/S) Limpopo REGISTRATIONS Help Desk Support Services (Advice) Access to Finance and Training Facilitation of Contractor Development SERVICE DELIVERY REGISTRATION – DEVELOPMENT - FACILITATION Development through partnerships

Mandate – Registers of Contractors Support risk management in the tendering process Reduce the administrative burden To facilitate sustainable growth and transformation of contractors, enable effective access by the emerging sector Promote minimum standards, contractor best practice and performance improvement Enable access by the private sector Provide information on the size, distribution, nature and development of contractors

Overview of the CRS – Classes of Work (GB) General Building (CE) Civil Engineering Electrical Engineering (EB) Building Installation (EP) Infrastructure (ME) Mechanical Engineering

Contractor registration process Contractor completes registration form and submits along with supporting doc’s and proof of payment of fees Grade 1 contractors register over the counter within 48 hrs. 21 working day processing period for Grades 2-9 Registration valid for three years Annual update Capacitation Workshop Session 1a - CIDB Registers Service - 2006

Track Record Requirements For each class of works applied for the contractor is required to attach the following documents:- Public Sector Track Record; Letter of Appointment, Certificate of Completion and Final Payment indicating contract value. Maintenance Contractors may provide latest payment certificate indicating the value of work done to date. Additional Documents are required in case of the following contracts:- Joint Venture- JV Agreement indicating percentage per partner. The JV calculator is available on the CIDB website and in the application form. Subcontractor- Sub-contract Agreement and corresponding Bank Statement . Private Sector Track Record; Letter of Appointment, Certificate of Completion and Final Payment indicating contract value. Maintenance Contractors may provide latest payment certificate indicating the value of work done to date and CORRESPONDING BANK STATEMENT.

Registration Criteria Grade Upper limit, (R) of tender value range Method A Method B Best Annual Turnover (R) (2 year) Largest contract(R) (5 year) Available capital (R) Available capital(R) 1 200,000  -  N/A 2 650,000 150,000 -  3 2,000,000 1,000,000 500,000 100,000 4 4,000,000 5 6,500,000 3,250,000 1,600,000 1,300,000 6 13,000,000 7,800,000 2,600,000 7 40,000,000 24,000,000 10,000,000 8,000,000 8 130,000,000 90,000,000 32,500,000 26,000,000 9 No Limit 270,000,000 100,000,000 80,000,000

Admin Fee for each class of works Contractor Fees Grade Maximum Value of Contract Admin Fee for each class of works Annual fee for highest class of works 1 R 200,000 R 450 2 R 650,000 R 250 3 R 2,000,000 R 750 R 350 4 R 4,000,000 R 900 5 R 6,500,000 R 1,750 6 R 13,000,000 R 3,500 7 R 40,000,000 R 9,000 8 R 130,000,000 R 29,000 9 > R 130,000,000 R 55,000

Registration Criteria – Registered Professional eg Registration Criteria – Registered Professional eg. Engineer registered with Engineering Council of SA (ECSA) Grade Upper limit of Tender Value Range Designation Method A Method B General Building & Civil Engineering All Other Classes of Works All Classes of Works 5 R 6 500 000 N/A 1 6 R 13 000 000 2 7 R 40 000 000 4 8 R 130 000 000 3 9 > R 130 000

Overview of the CRS – Tender Value Ranges

Registration Process – Grade 2 to 9 Application Received Non-Compliant Letter Sent allowing 60 days before Cancellation Compliant? NO YES Application Registered within 21 Working Days Registration Suspended after three months grace period Annual Confirmation Received? NO YE S Registration Updated Registration removed from the register on the date of expiry 3Year Renewal Received? NO YES Registration Renewed

WORKS TOWERS BUILDING 1ST FLOOR 43 CHURCH STREET, POLOKWANE CONTACTS: WORKS TOWERS BUILDING 1ST FLOOR 43 CHURCH STREET, POLOKWANE TELEPHONE NO. 086 1222 765 FAX NO. 086 678 0682 Thank You