CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA

Slides:



Advertisements
Similar presentations
What’s New in International Acquisition DT Tripp Director International Programs Defense Acquisition University.
Advertisements

Lesson Objectives Review Capabilities Development documents and processes for Information Technology and Information Systems IT Box – (current JCIDS manual)
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Acquisition Policy & International Trends.
Gate Review Process presented at DODCAS 2009 DON Session CAPT Jim Baratta Deputy Director, NCCA.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Lesson Objective Summarize the relationship between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Lesson Objective Summarize the relationship between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System.
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, March 2017.
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, 24 April 2017.
Workshop Schedule Welcome and Workshop Overview
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, April 2016.
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, December 2015.
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
DoDI Approved 8 December 2008
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Cloud in a Rack Tuan Tran 10 March 2016
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Product Support Strategy
Fielding plan details and adjustments
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
The Department of Defense Acquisition Process
Systems Engineering Technical Debt Workshop Outbrief
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA Initial Operational Capability (IOC) Full Operational Capability (FOC) Development RFP Release Decision CDD Validation FRP Decision Materiel Development Decision A B C LRIP CBA ICD Draft CDD CDD CPD Materiel Solution Analysis (MSA) Technology Maturation & Risk Reduction (TMRR) Engineering & Manufacturing Development (EMD) Production & Deployment Operations & Support MDA MDA MDA MDA MDA TMRR results reflected in CDD EMD results reflected in CPD Operational Test and Evaluation (OT&E) Sustainment Disposal AoA RVA RVA RVA AoA: Analysis of Alternatives ICD: Initial Capabilities Document CBA: Capabilities-Based Assessment CDD: Capability Development Document CPD: Capability Production Document FRP: Full Rate Production MDA: Milestone Decision Authority (see DoDI 5000.02) LRIP: Low Rate Initial Production RFP: Request for Proposal RVA: Requirements Validation Authority (See JCIDS Manual)