Presentation is loading. Please wait.

Presentation is loading. Please wait.

International Acquisition and Exportability (IA&E) Considerations

Similar presentations


Presentation on theme: "International Acquisition and Exportability (IA&E) Considerations"— Presentation transcript:

1 International Acquisition and Exportability (IA&E) Considerations
CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA International Acquisition and Exportability (IA&E) Considerations International Cooperative Programs (ICP) Technology Security & Foreign Disclosure (TSFD) Defense Exportability Integration Sales and Transfers IA&E Activities Cooperative opportunity analysis Requirements harmonization IA&E assessment Information exchange Interoperability incorporation in draft CDD Identify TMRR AS IA&E risk/ opportunities Identify EMD AS IA&E risk/ opportunities Cooperative R&D Cooperative prototypes TSFD coordination DEF/Exportability feasibility studies Evaluate ICR&D and CWP Identify P&D AS IA&E risk/ opportunities Cooperative EMD Cooperative T&E TSFD approvals Evaluate FCT program Assess DEF attributes/design Execute PPP to optimize exportability Update P&D AS IA&E risk/ opportunities Cooperative production Defense sales Hybrid programs Exportable version production Assessment of production capacity Cooperative logistics Security Assistance logistics Disposal Exportable version depot & spares EDA program Documentation and Reviews Exportability & ICP determinations Interoperability strategy Acquisition Strategy Draft CDD/CONOPs PPP RDT&E IEP ASR RDT&E MOU Program-specific MOU Technology Release Roadmap PDR Technology Release Roadmap updates DDL issuance PSI issuance CDR, TRR, PRR FMS LOAs DCS export authorizations DDL updates PSI updates PCA, OTRR ACSAs DCS follow-on support exports NOTE: Recent policy and statue call for early consideration of international within the DAS as depicted. Historically many of these activities/decisions have occurred later in the DAS process.

2 OTRR: Operational Test Reediness Review
PCA: Physical Configuration Audit P&D: Production and Deployment PDR: Preliminary Design Review PPP: Program Protection Plan PRR: Production Readiness Review PSI: Program Security Instruction R&D: Research & development TRR: Teat Readiness Review TSFD: Technology Security & Foreign Disclosure ACSA: Acquisition and Cross-Servicing Arrangement ASR: Alternative Systems Review CDD: Capability development document CDR: Critical Design Review CWP: Coalition Warfare Program DEF: Defense exportability features DDL: Delegation of Disclosure Letter DCS: Direct Commercial Sales EDA: Excess Defense Articles EOA: Early Operational Assessment FCT: Foreign Comparative Testing FMS: Foreign Military Sales FOT&E: Follow-on Test & Evaluation ICP: International Cooperative Programs ICR&D: International Cooperative R&D IA&E: International Acquisition and Exportability IEP: Information Exchange Program IOT&E: Initial operational test & evaluation LOA: Letter of Offer and Acceptance MOU: Memorandum of Understanding OA: Operational assessment


Download ppt "International Acquisition and Exportability (IA&E) Considerations"

Similar presentations


Ads by Google